CONSTRUCTION PROJECTS, O. Reg. 213/91
Section 156.5
Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 156.5 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026
The text
(1) Before a drilling operation described in section 156.3 begins, the employer responsible for it shall,
(a) develop a drilling procedure for the drill rig in accordance with subsection (2) and have it approved by an engineer; and
(b) have a copy of the drilling procedure provided to, and reviewed with, the workers engaged in the drilling operation. O. Reg. 345/15, s. 19; O. Reg. 375/22, s. 5.
(2) The drilling procedure shall be in writing and shall include, at a minimum, details of,
(a) the sequence of activities of the drilling operation to be followed including, if applicable, the delivery of concrete, rebar, steel piles and other materials related to the drilling operation;
(b) the procedures to be implemented for removing excavated soil and material from an auger or drilling tool and away from the supporting surface of the drill rig;
(c) the location to be used for storing excavated soil and material so that it does not endanger workers;
(d) the working area and designated path of travel to be used for any machinery or equipment used in the vicinity of the drilling operation so that the machinery or equipment does not affect the stability and integrity of the supporting surface of the drill rig;
(e) the measures and procedures to be implemented during the drilling operation to ensure that unremoved hazards do not endanger workers; and
(f) the areas that have been designated at, or in the vicinity of, the drilling operation where,
(i) only persons authorized by the employer are allowed to enter, and
(ii) no persons or equipment are allowed to enter. O. Reg. 345/15, s. 19.
(3) While a rotary foundation drill rig is in service at a drilling operation described in section 156.3, the employer responsible for the drilling operation shall ensure that,
(a) the drilling procedure described in subsection (2) is implemented; and
(b) the drilling procedure is followed by the workers engaged in, and in the vicinity of, the drilling operation. O. Reg. 345/15, s. 19.
Read the CONSTRUCTION PROJECTS on e-Laws ↗
Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.