CONSTRUCTION PROJECTS, O. Reg. 213/91

Section 141.8

Cite as CONSTRUCTION PROJECTS, O. Reg. 213/91, s. 141.8 · current to November 11, 2026 · consolidated from April 20, 2026 · read from e-Laws on November 16, 2026

The text

(1) This section applies if a site-specific installation drawing is used under clause 141.6 (2) (b). O. Reg. 242/16, s. 11. (2) The site-specific installation drawing shall be prepared by an engineer. O. Reg. 242/16, s. 11; O. Reg. 375/22, s. 5. (3) An engineer shall inspect a suspended work platform system after it has been installed for the first time at a project and before it is put into service and shall prepare a written report indicating whether the suspended work platform system complies with the drawing. O. Reg. 64/18, s. 1; O. Reg. 375/22, s. 5. (4) A suspended work platform system shall not be put into service unless the engineer’s report indicates it has been installed in accordance with the drawing. O. Reg. 64/18, s. 1; O. Reg. 375/22, s. 4. (5) If a suspended work platform system is relocated at a project, a deviation from the site-specific drawing is permitted if the deviation is approved by an engineer. O. Reg. 242/16, s. 11; O. Reg. 375/22, s. 5. (6) A suspended work platform system shall not be put into service at the new location unless, (a) the suspended work platform system was inspected, (i) if the installation at the new location was in accordance with the site-specific drawing, by either an engineer or by a designated competent worker who has successfully completed the training program under section 138.1, or (ii) if the installation at the new location was in accordance with the site-specific installation drawing and a deviation from it was approved by an engineer, by an engineer; and (b) a report prepared under subsection (7) or (8) indicates that the suspended work platform system has been installed in accordance with the drawing and approved deviations, if any. O. Reg. 242/16, s. 11; O. Reg. 375/22, s. 5. (7) In the case of an inspection under subclause 6 (a) (i), the engineer or designated competent worker shall provide a written report of the inspection indicating whether the installed suspended work platform system complies with the drawing. O. Reg. 242/16, s. 11; O. Reg. 375/22, s. 5. (8) In the case of an inspection under subclause 6 (a) (ii), the engineer shall provide a written report of the inspection indicating whether the installed suspended work platform system complies with the drawing and approved deviations. O. Reg. 242/16, s. 11; O. Reg. 375/22, s. 5. (9) While the suspended work platform system is at the project, the employer shall keep at the project, and make available to an inspector on request, the site-specific installation drawing, any approved deviations and every report prepared under this section. O. Reg. 242/16, s. 11.
Read the CONSTRUCTION PROJECTS on e-Laws ↗

Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.