Power Corporation Act, R.S.O. 1990, c. P.18
Section 83.2
Cite as Power Corporation Act, R.S.O. 1990, c. P.18, s. 83.2 · current to November 11, 2026 · consolidated from December 31, 2011 · read from e-Laws on November 17, 2026
The text
(1)-(28) Repealed: 1998, c. 15, Sched. E, s. 28 (1).
(29) Except as otherwise agreed by the Corporation and a commission, the commission acquires, on the transfer date, all assets (including equipment rented by the Corporation to those within the expanded area), liabilities, land, works and interests related to the distribution of power within the expanded area supplied by the Corporation. 1994, c. 31, s. 4.
(30) In subsection (29),
“commission” includes a municipal corporation that supplies power. 1994, c. 31, s. 4.
(31) Subsection (29) does not operate to transfer anything,
(a) related to the distribution of power, on the day before the transfer date, to a customer as defined in subsection 37 (1) of the Ontario Energy Board Act;
(b) used, or planned by the Corporation for use, in the supply of power outside the expanded service area;
(c) normally inside transformer station premises if the station is supplied at voltages in excess of 50 kilovolts; or
(d) that has components operating, or designed for operating, at voltages above 50 kilovolts. 1994, c. 31, s. 4.
83.3-83.7 Repealed: 1998, c. 15, Sched. E, s. 28 (1).
84-98 Repealed: 1998, c. 15, Sched. E, s. 28 (1).