Mining Act, R.S.O. 1990, c. M.14

Section 95

When survey required in unsurveyed territory

Cite as Mining Act, R.S.O. 1990, c. M.14, s. 95 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 17, 2026

The text

(1) Before a lease or licence of occupation of a mining claim in unsurveyed territory is applied for, the claim shall be surveyed by an Ontario land surveyor at the expense of the applicant, but no survey of a mining claim, except a perimeter survey consented to by the Minister under subsection (3), shall be made without the written consent of the recorder. R.S.O. 1990, c. M.14, s. 95 (1). (2) Subject to the Surveys Act, the prescribed methods and procedures shall be followed in the surveying of mining claims unless the Minister orders otherwise. R.S.O. 1990, c. M.14, s. 95 (2); 2001, c. 9, Sched. L, s. 4. (3) Where two or more mining claims in unsurveyed territory are contiguous and are registered in the same name, the Minister may, upon application therefor, consent to a perimeter survey being made of the circumference of the contiguous claims in lieu of a survey under subsection (1). 2017, c. 6, Sched. 2, s. 62 (1). (4) Where the Minister consents to a perimeter survey being made under subsection (3), he or she shall issue written instructions prescribing its conduct and filing. R.S.O. 1990, c. M.14, s. 95 (4). (5) Where a perimeter survey is made under subsection (3), the rental shall be computed on the total area of the claims within the perimeter survey. 2017, c. 6, Sched. 2, s. 62 (2). (6) Repealed: 2017, c. 6, Sched. 2, s. 62 (2). (7) Before a perimeter survey is made, the Minister may order the inspection of the mining claims proposed to be included in the perimeter survey and an inspector or other officer of the Ministry shall prepare and submit to the Minister a report and plan according to the instructions provided by the Minister and the survey shall not be directed to be made unless the Minister is satisfied that the requirements of this Act have been complied with. R.S.O. 1990, c. M.14, s. 95 (7). (8) The fee for an inspection under subsection (7) is the amount set by the Minister, payable in advance, and the Minister may require the applicant to provide the inspector with suitable transportation to the location of the claims. R.S.O. 1990, c. M.14, s. 95 (8); 1997, c. 40, s. 2. (9) Where, after a perimeter survey has been made, one or more of the claims within the perimeter survey is cancelled for any reason or where the holder of a recorded interest ceases to be the holder of an undivided interest in the whole, the survey is void, and thereupon the recorder shall cancel the entry on the record and he or she shall also cancel the work recorded on account of the survey. R.S.O. 1990, c. M.14, s. 95 (9).
Read the Mining Act on e-Laws ↗