Drainage Act, R.S.O. 1990, c. D.17

Section 69

Public utility or road authority, option to construct drainage works

Cite as Drainage Act, R.S.O. 1990, c. D.17, s. 69 · current to November 11, 2026 · consolidated from June 30, 2021 · read from e-Laws on November 17, 2026

The text

(1) Where a drainage works or a part thereof is to be constructed, improved, maintained or repaired upon, along, adjoining, under or across the lands, permanent way, transmission lines, power lines, wires, conduits or other permanent property of a public utility or road authority, the public utility or road authority may construct, improve, maintain or repair such drainage works or part. R.S.O. 1990, c. D.17, s. 69 (1). (2) Where the public utility or road authority does not exercise its powers under subsection (1) or does not complete such drainage works or part within a reasonable time and without unnecessary delay, such drainage works or part may be completed by the initiating municipality in the same manner as any other drainage works. R.S.O. 1990, c. D.17, s. 69 (2).
Read the Drainage Act on e-Laws ↗