PROCEEDINGS COMMENCED BY CERTIFICATE OF OFFENCE, R.R.O. 1990, Reg. 950

Schedule 70.3

Cite as PROCEEDINGS COMMENCED BY CERTIFICATE OF OFFENCE, R.R.O. 1990, Reg. 950, Schedule 70.3 · current to November 11, 2026 · consolidated from October 15, 2026 · read from e-Laws on November 16, 2026

The text

Schedule 70.3 Oil, Gas and Salt Resources Operating Standards incorporated by reference into Ontario Regulation 245/97 made under the Oil, Gas and Salt Resources Act Column 1 Item | Column 2 Offence | Column 3 Provision 0.1 | Fail to ensure all equipment used in drilling a well is in good condition and adequate | clause 3.1 (a) 0.2 | Fail to prevent the migration of oil, gas or water from one horizon to another | clause 3.1 (b) 0.3 | Fail to properly handle or dispose of all fluids produced or recovered | clause 3.1 (c) 0.4 | Fail to properly handle or dispose of fluids or refuse from a well | clause 3.1 (d) 1. | Drill a well with a surface location in a restricted drilling area | section 3.1.1 2. | Fail to construct sumps or pits or to provide tanks prior to spudding | section 3.2 3. | Fail to install temporary fencing around sump | clause 3.2.1 (a) 4. | Fail to install a impervious liner | clause 3.2.1 (b) 5. | Fail to maintain fluid levels 0.5 metres below base of dike | clause 3.2.1 (c) 6. | Fail to use proper liner in earthen sump or pit | section 3.2.2 7. | Fail to close earthen sump or pit within 6 months of TD date | section 3.3 8. | Fail to isolate formations from contamination caused by migration of fluids | clause 3.4 (c) 9. | Fail to prevent migration of fluids to surface or sub-surface | clause 3.4 (d) 10. | Fail to prevent shale and unconsolidated material from falling into open hole during drilling | clause 3.4 (e) 11. | Improper removal of casing during drilling | section 3.5.1 12. | Improper removal of casing from a producing well | section 3.5.1.1 13. | Fail to have proper hole size for casing when sealing well | section 3.5.2 14. | Fail to have proper annular clearance between casings | section 3.5.3 15. | Fail to record history of used casing | clause 3.6 (a) 16. | Fail to examine condition of thread on pipe and inside collars of used casings | clause 3.6 (b) 17. | Fail to examine condition of pipe near threads and casing collars of used casings | clause 3.6 (c) 18. | Fail to conduct wall thickness measurements on joints of used casings | clause 3.6 (d) 19. | Fail to conduct a hydrostatic pressure test on used casings | clause 3.6 (e) 20. | Fail to guide casing properly into hole | clause 3.7 (a) 21. | Fail to apply correct casing torque or thread standoff | clause 3.7 (b) 22. | Fail to clean threads and examine casing | clause 3.7 (c) 23. | Fail to examine and clear casing of internal obstructions | clause 3.7 (d) 24. | Fail to use thread compound on casing joints | clause 3.7 (e) 25. | Fail to pressure test all joints in the string | clause 3.7 (f) 26. | Fail to protect all potable water formations | clause 3.9 (a) 27. | Fail to protect potential hydrocarbon-bearing zones | clause 3.9 (b) 28. | Fail to protect casings from fluid bearing formations | clause 3.9 (c) 28.1 | Fail to meet cement quality | clause 3.9.2 (a) 28.2 | Fail to comply with API publication for selecting correct cement grade | clause 3.9.2 (b) 28.3 | Fail to ensure cement correctly mixed and pumped | clause 3.9.2 (b) 29. | Fail to ensure cement quality by providing Examiner on site | clause 3.9.2 (c) 30. | Fail to run conductor casing where water flows occur close to surface | section 3.10 31. | Fail to ensure conductor casing is of sufficient weight and quality | clause 3.10.1 (a) 32. | Fail to ensure hole is dry and monitored prior to resumption of drilling | clause 3.10.1 (b) 33. | Fail to squeeze cement to isolate fresh water zone where water flow not stopped | clause 3.10.1 (c) 34. | Recover conductor casing prior to cementing next string | clause 3.10.1 (d) 35. | Fail to permanently isolate and protect potable water | clause 3.11 (a) 36. | Fail to prevent cross-flow between fluid bearing zones | clause 3.11 (b) 37. | Fail to prevent sloughing of unconsolidated material into well bore | clause 3.11 (c) 38. | Fail to anchor well control equipment | clause 3.11 (d) 39. | Fail to cement surface casing | section 3.11.1 40. | Fail to drill surface hole sufficiently deep into bedrock | section 3.11.2 41. | Fail to run a string of casing above the artesian fresh water zone | section 3.11.3 42. | Fail to cement surface casing before drilling | section 3.11.4 43. | Fail to cement surface casing full length | clause 3.11.4 (a) 44. | Fail to use proper excess cement volume | clause 3.11.4 (b) 45. | Fail to cement surface casing using circulation method | clause 3.11.4 (c) 46. | Fail to monitor annular flow for cement returns | section 3.11.5 47. | Fail to ensure surface casing cement complies with API Specification 10 | section 3.11.6 48. | Fail to ensure surface casing cement retains 5 metres of tail cement | section 3.11.7 49. | Fail to pre-flush before pumping cement into casing | section 3.11.8 50. | Fail to obtain slurry samples during cementing operation | section 3.11.9 51. | Fail to determine WOC (Wait on Cement) time | section 3.11.10 52. | Commence drill-out operation before cement attains 3600 kPa compressive strength | section 3.11.10 53. | Fail to conduct casing pressure test before cement drilled out of shoe joint | section 3.11.11 54. | Fail to conduct remedial work if casing fails pressure test | section 3.11.11 55. | Fail to conduct pressure integrity test | section 3.11.12 56. | Fail to use a low volume, high pressure pump for pressure integrity test | clause 3.11.12 (a) 57. | Apply incorrect pressure during pressure integrity test | clause 3.11.12 (a) 58. | Fail to conduct pressure integrity test for ten minutes | clause 3.11.12 (b) 59. | Fail to use an incompressible fluid in pressure integrity test | clause 3.11.12 (c) 60. | Fail to record test data in pressure integrity test | clause 3.11.12 (d) 61. | Fail to conduct remedial work when casing seat fails pressure integrity test | section 3.11.13 62. | Fail to use intermediate casing and cement to protect equipment and formations from excessive pressures | clause 3.12 (a) 63. | Fail to use intermediate casing and cement to prevent fluid migration | clause 3.12 (b) 64. | Fail to use intermediate casing and cement to prevent material from falling into open hole | clause 3.12 (c) 65. | Fail to control the target zone pressure | clause 3.12 (d) 66. | Fail to set and cement intermediate casing prior to drilling | section 3.12.1 67. | Fail to cement casing when aquifer is present | section 3.12.2 68. | Fail to identify all oil, gas and fluid bearing zones when drilling | clause 3.12.3 (a) 69. | Fail to pump cement to separate all oil, gas and fluid bearing zones | clause 3.12.3 (b) 70. | Fail to ensure cement in casing annulus rises 25 metres above previous casing seat | clause 3.12.3 (c) 71. | Fail to provide an Examiner to certify isolation of all porous zones | clause 3.12.3 (d) 72. | Fail to seal or plug the lost circulation zone prior to or during the cementing of the casing | section 3.12.4 73. | Fail to cement by circulation method to 25 metres above last casing seat | section 3.12.5 74. | Fail to conduct remedial cementing to isolate all porous zones | section 3.12.5.1 75. | Fail to utilize correct cement volume | section 3.12.6 76. | Fail to use sulphate-resistant casing cement | section 3.12.7 77. | Fail to run 5 metre long shoe joint | section 3.12.8 78. | Fail to wait on cement for 6 hours before starting drill-out operation | section 3.12.9 79. | Fail to conduct casing pressure test before cement drilled out of shoe joint | section 3.12.10 80. | Fail to conduct a low pressure test before cement drilled out of shoe joint | clause 3.12.10 (a) 81. | Fail to conduct a high pressure test before cement drilled out of shoe joint | clause 3.12.10 (b) 82. | Fail conduct remedial work where casing fails pressure test | section 3.12.10 83. | Fail to install and test spool, casing valve and BOP equipment with intermediate casing string | section 3.12.11 84. | Fail to conduct pressure integrity test after drilling cement in shoe joint | section 3.12.12 85. | Fail to use low volume, high pressure pump in pressure integrity test | clause 3.12.12 (a) 86. | Fail to apply proper pressure on formation in pressure integrity test | clause 3.12.12 (b) 87. | Fail to apply pressure for 10 minutes in pressure integrity test | clause 3.12.12 (c) 88. | Fail to use incompressible fluid in pressure integrity test | clause 3.12.12 (d) 89. | Fail to record type and gradient of incompressible fluid in pressure integrity test | subclause 3.12.12 (e) (i) 90. | Fail to record duration of pressure integrity test | subclause 3.12.12 (e) (ii) 91. | Fail to record initial pressure in pressure integrity test | subclause 3.12.12 (e) (iii) 92. | Fail to record final pressure in pressure integrity test | subclause 3.12.12 (e) (iv) 93. | Fail to protect equipment and formations with cemented production casing | section 3.13 93.1 | Fail to run a gamma ray log within 30 days of well’s TD date | clause 3.13.1 (a) 93.2 | Fail to run a neutron log within 30 days of well’s TD date | clause 3.13.1 (b) 93.3 | Fail to install all wellhead equipment in compliance with API Spec 6A | section 3.13.2 94. | Fail to install a well control device capable of closing around the cable prior to drilling | subclause 3.13.4 (a) (i) 95. | Fail to install a well control device with remote controls | subclause 3.13.4 (a) (ii) 96. | Fail to perform daily function test of well control device | clause 3.13.4 (b) 97. | Fail to ensure all lubricator components can handle pressure | clause 3.13.4 (c) 98. | Fail to specify when lubricator system is employed | clause 3.13.4 (d) 99. | Fail to use full lubricator system | clause 3.13.4 (e) 100. | Fail to properly install rotary head to BOP system | section 3.13.5 101. | Fail to cement production casing 25 metres above previous casing seat | section 3.13.6 102. | Fail to cement production casing 25 metres above corrosive zone | clause 3.13.6 (a) 103. | Fail to cement production casing liner over its full length | clause 3.13.6 (b) 104. | Fail to cement production casing to surface in wells located in water-covered areas | clause 3.13.6 (d) 105. | Fail to provide an Examiner to certify cement tops | section 3.13.6 106. | Fail to isolate porous zones by remedial cementing | section 3.13.6.1 107. | Fail to use 30 per cent excess volume of cement based on theoretical calculation | clause 3.13.7 (a) 108. | Fail to use 20 per cent excess volume of cement based on calliper volume determination | clause 3.13.7 (b) 109. | Fail to use proper quality and temperature of water when mixing cement | clause 3.13.8 (a) 110. | Fail to run a 5 metre casing shoe joint to retain tail cement | clause 3.13.8 (b) 111. | Fail to cement by displacement method and use a wiper plug to separate cement | clause 3.13.9 (a) 112. | Fail to provide a positive stop to cement displacement | clause 3.13.9 (b) 113. | Fail to remove drilling fluid and filter cake and improve cement bond | clause 3.13.9 (c) 114. | Fail to use wall cleaners or scratchers to improve cement bond | clause 3.13.9 (d) 115. | Fail to run centralizers at proper locations | section 3.13.10 116. | Fail to pump sufficient volume of neat tail cement | clause 3.13.11 (a) 117. | Fail to ensure tail cement is equal in quality to neat cement | clause 3.13.11 (b) 118. | Fail to use remedial cementing techniques where potential for hydrostatic communication between formations | section 3.13.12 119. | Fail to retain records of remedial cementing | section 3.13.13 119.1 | Fail to run cement bond log | section 3.13.13 119.2 | Fail to comply with API Spec 6A for surface equipment | section 3.14 120. | Fail to install a casing head or spool prior to completing well | clause 3.14 (a) 121. | Fail to provide a wellhead to isolate the annulus at surface prior to completing well | clause 3.14 (b) 122. | Fail to install a tubing head or tubing spool prior to completing well | clause 3.14 (c) 123. | Drilling and cementing records — fail to keep on file the size, type, grade and weight of casing | clause 3.15 (a) 124. | Drilling and cementing records — fail to keep on file the names of the manufacturer and supplier | clause 3.15 (b) 125. | Drilling and cementing records — fail to keep on file a casing tally | clause 3.15 (c) 126. | Drilling and cementing records — fail to keep on file whether casing was new or used | clause 3.15 (d) 127. | Drilling and cementing records — fail to keep on file the history of use for used casing | clause 3.15 (e) 128. | Drilling and cementing records — fail to keep on file the setting depth | clause 3.15 (f) 129. | Drilling and cementing records — fail to keep on file description of operational problems while running casing | clause 3.15 (g) 130. | Drilling and cementing records — fail to keep on file the cementing company name | clause 3.16 (a) 131. | Drilling and cementing records — fail to keep on file the cement blends used | clause 3.16 (b) 132. | Drilling and cementing records — fail to keep on file the source of mix water | clause 3.16 (c) 133. | Drilling and cementing records — fail to keep on file type and volume of any preflush | clause 3.16 (d) 134. | Drilling and cementing records — fail to keep on file volumes of cement | clause 3.16 (e) 135. | Drilling and cementing records — fail to keep on file cement slurry density | clause 3.16 (f) 136. | Drilling and cementing records — fail to keep on file actual displacement volume | clause 3.16 (g) 137. | Drilling and cementing records — fail to keep on file final displacement pressure | clause 3.16 (h) 138. | Drilling and cementing records — fail to keep on file any cement movement techniques | clause 3.16 (i) 139. | Drilling and cementing records — fail to keep on file cement returns with estimate of volume | clause 3.16 (j) 140. | Drilling and cementing records — fail to keep on file float equipment and casing attachments | clause 3.16 (k) 141. | Drilling and cementing records — fail to keep on file results of every pressure test | clause 3.16 (l) 142. | Drilling and cementing records — fail to keep on file cement tops and their identification | clause 3.16 (m) 143. | Drilling and cementing records — fail to keep on file description of any operational problems | clause 3.16 (n) 144. | Drilling and cementing records — fail record and keep on file a copy of cement bond logs | clause 3.16 (o) 145. | Fail to keep on site records that include depth at start of day or shift | clause 3.17 (a) 146. | Fail to keep on site records that include depth at end of day or shift | clause 3.17 (b) 147. | Fail to keep on site records that include diameter of the hole | clause 3.17 (c) 148. | Fail to keep on site records that include any change in casing program | clause 3.17 (d) 149. | Fail to keep on site records that include setting depth, casing size, type, grade and weight | clause 3.17 (e) 150. | Fail to keep on site records that include new or used casing | clause 3.17 (f) 151. | Fail to keep on site records that include a description of all cement jobs | clause 3.17 (g) 152. | Fail to keep on site records that include pressure tests and results | clause 3.17 (h) 153. | Fail to keep on site records that include the depth of all shows of oil, gas or water | clause 3.17 (i) 154. | Fail to keep on site records that include the depth of lost circulation zones | clause 3.17 (j) 155. | Fail to keep on site records that include a description of related operations | clause 3.17 (k) 156. | Drilling samples — fail to collect at 3 metre intervals from vertical or deviated portion of wellbore | subclause 3.18 (a) (i) 157. | Drilling samples — fail to collect at 6 metre intervals from horizontal portion of wellbore | subclause 3.18 (a) (ii) 158. | Drilling samples — fail to bag, dry and label sample bags | subclause 3.18 (b) (i) 159. | Drilling samples — fail to wash, dry and label sample vials | subclause 3.18 (b) (ii) 160. | Drilling samples — fail to provide samples recovered from a well | clause 3.18 (c) 161. | Site rehabilitation — fail to clear area around well of all refuse material | clause 3.19 (a) 162. | Site rehabilitation — fail to dispose of all liquid and solid waste in a safe manner | clause 3.19 (b) 163. | Site rehabilitation — fail to fill in excavations | clause 3.19 (c) 164. | Site rehabilitation — fail to clean pits of salt and chemicals that inhibit plant growth | clause 3.19 (d) 165. | Site rehabilitation — fail to remove concrete bases, machinery and materials | clause 3.19 (e) 166. | Site rehabilitation — fail to level and restore site to original condition | clause 3.19 (f) 167. | Site rehabilitation — fail to provide an Examiner to visit site and certify rehabilitation and plugging properly completed | clause 3.19 (g) 167.1 | Commence drilling in Lake Erie prior to April 1 or after October 31 | clause 3.20 (a) 168. | Water covered area — fail to cement all casings to lake bed | clause 3.20 (b) 169. | Water covered area — fail to monitor for oil and liquid hydrocarbons | clause 3.20 (c) 170. | Water covered area — fail to use fresh water drilling fluids only | clause 3.20 (e) 171. | Water covered area — fail to have onboard tanks to contain all drilling fluids | clause 3.20 (f) 172. | Water covered area — fail to reduce turbidity when returning drill cuttings to lake bed | clause 3.20 (g) 173. | Water covered area — fail to prepare and submit contingency plan | section 3.20.1 174. | Water covered area — fail to include emergency definitions in contingency plan | clause 3.20.1 (a) 175. | Water covered area — fail to include written instructions for response and mitigation in contingency plan | clause 3.20.1 (b) 176. | Water covered area — fail to include emergency response organizations and responsibilities for actions in contingency plan | clause 3.20.1 (c) 177. | Water covered areas — fail to include locations, access routes or directions to all works in contingency plan | clause 3.20.1 (d) 178. | Water covered areas — fail to list resources, supplies and equipment required for response and mitigation in contingency plan | clause 3.20.1 (e) 179. | Water covered areas — fail to include contact lists for personnel, public bodies and equipment suppliers in contingency plan | clause 3.20.1 (f) 180. | Water covered areas — fail to include incident assessment and reporting procedures in contingency plan | clause 3.20.1 (g) 181. | Water covered areas — fail to conduct regular emergency response drills | section 3.20.2 182. | Fail to install and maintain adequate BOP equipment during drilling | section 4.1 183. | Fail to have proper flanges on casing bowl or spool to which BOP attached | clause 4.4.1 (a) 184. | Fail to have at least one valve on casing bowl or spool to which BOP equipment attached | clause 4.4.1 (b) 185. | Fail to connect BOP to an accumulator system where hydraulic operation | section 4.4.3 186. | Fail to locate wheel used to close blowout preventer 5 metres from rig floor and to secure shaft to preventer where mechanical operation of BOP | section 4.4.4 187. | Fail to install and operate accumulator system to manufacturer’s specifications | clause 4.4.5 (a) 188. | Fail to ensure accumulator can provide fluid of sufficient volume and pressure | clause 4.4.5 (b) 189. | Fail to connect accumulator properly to BOP | clause 4.4.5 (c) 190. | Fail to ensure accumulator system is recharged by pump | clause 4.4.5 (d) 191. | Fail to ensure accumulator system can close ram blowout preventer within 30 seconds | clause 4.4.5 (e) 192. | Fail to ensure accumulator system can close annular blowout preventer within 90 seconds | clause 4.4.5 (f) 193. | Fail to ensure accumulator system is equipped with gauges | clause 4.4.5 (g) 194. | Fail to ensure accumulator system is equipped with check valve | clause 4.4.5 (h) 195. | Fail to ensure nitrogen supply is connected to accumulator system | section 4.4.6 196. | Fail to have adequate nitrogen supply | clause 4.4.6 (a) 197. | Fail to maintain nitrogen supply at 12,500 kPa | clause 4.4.6 (b) 198. | Fail to install or have available pressure gauge to measure nitrogen pressure | clause 4.4.6 (c) 199. | Fail to install hand wheels on ram preventers | section 4.4.7 200. | Fail to install operating controls for hydraulically operated BOP system | section 4.4.8 201. | Kill systems — fail to install an inlet below BOP | section 4.4.9 202. | Kill systems — fail to install proper size inlet below BOP | clause 4.4.9 (a) 203. | Kill systems — fail to install nipple, valve and kill line for Class B wells | clause 4.4.9 (b) 204. | Kill systems — fail to install kill line components with proper pressure rating | clause 4.4.9 (c) 205. | Kill systems — fail to install separate lines for kill fluids | clause 4.4.9 (d) 206. | Bleed-off system — fail to install bleed-off outlet below BOP | section 4.4.10 207. | Bleed-off system — fail to install proper size outlet | clause 4.4.10 (a) 208. | Bleed-off system — fail to install proper nipple, valve and bleed-off line for Class B wells | clause 4.4.10 (b) 209. | Bleed-off system — fail to have proper pressure rating for bleed-off line | clause 4.4.10 (c) 210. | Bleed-off system — fail to attach separate lines to named equipment | clause 4.4.10 (d) 211. | Flexible hose — fail to install hose with proper pressure rating | clause 4.4.11 (a) 212. | Flexible hose — fail to install hose with proper internal diameter | clause 4.4.11 (b) 213. | Flexible hose — fail to install hose with factory installed connections | clause 4.4.11 (c) 214. | Flexible hose — fail to install hose with adequate fire protection sheath | clause 4.4.11 (d) 215. | Flexible hose — fail to install hose with manufacturer’s identification | clause 4.4.11 (e) 216. | Flexible hose — fail to install flexible hose with bends equal to or greater than manufacturer’s specifications | clause 4.4.11 (f) 217. | Flexible hose — fail to secure flexible hose | clause 4.4.11 (g) 218. | Flexible hose — fail to shop service and test | clause 4.4.11 (h) 219. | Flexible hose — fail to record test and maintenance data | clause 4.4.11 (h) 220. | Fail to conduct a pressure test prior to drilling cement out | section 4.4.12 221. | Fail to test BOP equipment daily | section 4.4.13 222. | Fail to service defective BOP equipment | section 4.4.13 223. | Fail to shop service BOP equipment every 3 years | section 4.4.14 224. | Fail to record test and maintenance data of BOP equipment | section 4.4.14 225. | Training — fail to ensure rig crew is trained | clause 4.4.15 (a) 226. | Training — fail to ensure that driller is certified | clause 4.4.15 (b) 227. | Training — fail to ensure that at least one person is certified | clause 4.4.15 (c) 228. | Training — fail to ensure that BOP drills are performed prior to drilling | clause 4.4.15 (d) 229. | Training — fail to ensure that BOP drills are performed every seven days | clause 4.4.15 (e) 230. | Training — fail to ensure that BOP drills are recorded | clause 4.4.15 (f) 231. | Training — fail to post kick control procedures at rig | clause 4.4.15 (g) 232. | Fail to use Class A well BOP equipment | clause 4.5.1 (a) 233. | Fail to use Class B well BOP equipment | clause 4.5.1 (b) 234. | Fail to properly construct drilling-through components | section 4.5.2 235. | Fail to have flange as part of casing bowl | clause 4.5.3 (a) 236. | Fail to ensure casing bowl has one valve | clause 4.5.3 (b) 237. | Fail to ensure blowout preventer is hydraulically operated | section 4.5.4 238. | Fail to install and operate accumulator system to manufacturer’s specifications | clause 4.5.5 (a) 239. | Fail to ensure accumulator system maintains pressure | clause 4.5.5 (b) 240. | Fail to ensure accumulator system is connected to blowout preventers | clause 4.5.5 (c) 241. | Fail to ensure accumulator system is recharged by automatic pump | clause 4.5.5 (d) 242. | Fail to ensure accumulator system can close ram blowout preventer | clause 4.5.5 (e) 243. | Fail to ensure accumulator system can close annular blowout preventer | clause 4.5.5 (f) 244. | Fail to ensure accumulator system can close annular blowout preventer | clause 4.5.5 (g) 245. | Fail to ensure accumulator system is equipped with fittings and gauges | clause 4.5.5 (h) 246. | Fail to connect accumulator to nitrogen supply | section 4.5.6 247. | Fail to have adequate nitrogen supply to operate BOP equipment | clause 4.5.6 (a) 248. | Fail to have nitrogen supply at 12,500 kPa | clause 4.5.6 (b) 249. | Fail to install or have available gauge to measure nitrogen pressure | clause 4.5.6 (c) 250. | Fail to have hand wheels for ram type blowout preventers | section 4.5.7 251. | Fail to include operating controls for each blowout preventer | clause 4.5.8 (a) 252. | Fail to include additional controls to close and open valve | subclause 4.5.8 (b) (i) 253. | Fail to include additional controls 15 metres from well | subclause 4.5.8 (b) (ii) 254. | Fail to include readily accessible and protected additional controls | subclause 4.5.8 (b) (iii) 255. | Fail to include a kill system | section 4.5.9 256. | Fail to have proper pressure rating of kill system | clause 4.5.9 (a) 257. | Fail to include kill line connecting mud line to drilling spool | clause 4.5.9 (b) 258. | Fail to include a valved kill system to isolate kill line from stand pipe | clause 4.5.9 (c) 259. | Fail to include kill system with two flanged valves on drilling spools | clause 4.5.9 (d) 260. | Fail to include kill system with 50 millimetres diameter | clause 4.5.9 (e) 261. | Fail to install flexible hose with proper pressure rating | clause 4.5.10 (a) 262. | Fail to install flexible hose with proper diameter | clause 4.5.10 (b) 263. | Fail to install flexible hose with proper connections | clause 4.5.10 (c) 264. | Fail to install flexible hose with proper sheathing | clause 4.5.10 (d) 265. | Fail to install flexible hose with proper markings | clause 4.5.10 (e) 266. | Fail to install flexible hose with proper bending radius | clause 4.5.10 (f) 267. | Fail to secure flexible hose | clause 4.5.10 (g) 268. | Fail to shop service flex hose every 3 years | clause 4.5.10 (h) 269. | Fail to record flexible hose test and maintenance data | clause 4.5.10 (h) 270. | Fail to ensure Class B bleed-off system valves have proper pressure rating | clause 4.5.11 (a) 271. | Fail to ensure Class B bleed-off system contains only straight pipe or 90 degree bends | clause 4.5.11 (b) 272. | Fail to ensure Class B bleed-off system is securely tied down | clause 4.5.11 (c) 273. | Fail to ensure Class A bleed-off system has proper line with valve | clause 4.5.12 (a) 274. | Fail to ensure Class A bleed-off system has proper line to pit 30 metres from well | clause 4.5.12 (b) 275. | Fail to ensure Class A bleed-off line is 75 millimetres in diameter | clause 4.5.13 (a) 276. | Fail to ensure Class A bleed-off line is connected by proper flanges and unions | clause 4.5.13 (b) 277. | Fail to ensure Class A bleed-off line contains 2 valves on drilling spool | clause 4.5.13 (c) 278. | Fail to ensure Class A bleed-off line flexible hose conforms to standards | clause 4.5.13 (d) 279. | Fail to ensure choke-manifold is properly constructed | clause 4.5.14 (a) 280. | Fail to ensure choke-manifold permits flow from well to flare pit | subclause 4.5.14 (b) (i) 281. | Fail to ensure choke-manifold permits flow from well to lines of proper diameter | subclause 4.5.14 (b) (ii) 282. | Fail to ensure choke-manifold contains two adjustable chokes | clause 4.5.14 (c) 283. | Fail to ensure choke-manifold is constructed with valved outlet | clause 4.5.14 (d) 284. | Fail to ensure choke-manifold provides casing pressure | clause 4.5.14 (e) 285. | Fail to ensure choke-manifold is constructed to provide flow paths | clause 4.5.14 (f) 286. | Fail to ensure choke-manifold is located outside sub-structure | clause 4.5.14 (g) 287. | Fail to ensure choke-manifold is protected from freezing | clause 4.5.14 (h) 288. | Fail to ensure mud system line is connected to choke line | clause 4.5.14.1 (a) 289. | Fail to ensure proper diameter of mud system line | clause 4.5.14.1 (b) 290. | Fail to ensure mud system line directs flow through mud-gas separator | clause 4.5.14.1 (c) 291. | Fail to ensure bleed-off line from choke manifold to flare pit is proper diameter | clause 4.5.14.2 (a) 292. | Fail to ensure bleed-off line from choke manifold to flare pit is 30 metres from well | clause 4.5.14.2 (b) 293. | Fail to ensure bleed-off line from choke manifold is in downward direction to earthen pit of 1 metre | subclause 4.5.14.2 (c) (i) 294. | Fail to ensure walls of earthen pit where choke manifold bleed-off line terminates have proper height | subclause 4.5.14.2 (c) (ii) 295. | Fail to ensure earthen pit where choke manifold bleed-off line terminates is shaped to contain liquid | subclause 4.5.14.2 (c) (iii) 296. | Fail to ensure auxiliary choke manifold bleed-off lines have proper diameter | section 4.5.14.3 297. | Fail to install and maintain a mud-gas separator in mud tank | clause 4.5.15 (a) 298. | Fail to install and maintain a warning device in mud tank | clause 4.5.15 (b) 299. | Fail to equip drilling mud system with device to measure volume | section 4.5.16 300. | Fail to ensure hole is filled with proper amount of fluid when pulling pipe from well | clause 4.5.17 (a) 301. | Fail to ensure volume of fluid in hole is recorded when pulling pipe from well | clause 4.5.17 (b) 302. | Fail to ensure heat is provided to blow out preventer | clause 4.5.18 (a) 303. | Fail to ensure bleed-off lines are empty in cold weather | subclause 4.5.18 (b) (i) 304. | Fail to ensure bleed-off lines are filled with non-freezing fluid in cold weather | subclause 4.5.18 (b) (ii) 305. | Fail to ensure bleed-off lines are heated in cold weather | subclause 4.5.18 (b) (iii) 306. | Fail to install and maintain drill string safety valve and a device capable of stopping back flow | section 4.5.19 307. | Air, gas or foam drilling — fail to install and maintain a rotating head | subclause 4.5.20 (a) (i) 308. | Air, gas or foam drilling — fail to install and maintain a 30 metre diverter line | subclause 4.5.20 (a) (ii) 309. | Air, gas or foam drilling — fail to install and maintain a reserve volume of drilling fluid | subclause 4.5.20 (a) (iii) 310. | Air, gas or foam drilling — fail to install and maintain a hydrogen sulphide monitor | subclause 4.5.20 (a) (iv) 311. | Air, gas or foam drilling — fail to flare any gas flowing from diverter line | clause 4.5.20 (b) 312. | Fail to ensure pressure test on casing and ram type preventer | clause 4.5.21 (a) 313. | Fail to ensure pressure test on casing, ram and annular type preventer | clause 4.5.21 (b) 314. | Fail to ensure pressure test on casing, ram preventer and bleed-off manifold | clause 4.5.21 (c) 315. | Fail to ensure pressure test on casing and each annular preventer | clause 4.5.21 (d) 316. | Fail to cease operation when pressure tests not satisfactory | section 4.5.21.1 317. | Fail to run a casing inspection log | clause 4.5.22 (a) 318. | Fail to run a pressure test at weakest section of casing | clause 4.5.22 (b) 319. | Fail to test BOP equipment daily | clause 4.5.23 (a) 320. | Fail to properly test annular type BOP equipment | clause 4.5.23 (b) 321. | Fail to record BOP tests | clause 4.5.23 (c) 322. | Fail to service BOP equipment | section 4.5.24 323. | Fail to ensure rig crew is trained in the operation of BOP equipment | clause 4.5.25 (a) 324. | Fail to ensure driller has First Line Supervisor certificate | clause 4.5.25 (b) 325. | Fail to ensure at least one person has Second Line Supervisor certificate | clause 4.5.25 (c) 326. | Fail to ensure blowout prevention drills conducted prior to drilling | clause 4.5.25 (d) 327. | Fail to ensure blowout prevention drills conducted every 7 days | clause 4.5.25 (e) 328. | Fail to ensure drills are recorded | clause 4.5.25 (f) 329. | Fail to ensure device allows circulation of fluids through drill string | clause 4.5.26 (a) 330. | Fail to install remote control master valve on testing head | clause 4.5.26 (b) 331. | Fail to ensure well is under control | clause 4.6 (a) 332. | Fail to ensure blowout prevention is installed and maintained | clause 4.6 (b) 333. | Fail to ensure blowout prevention equipment is installed to specifications | clause 4.6 (c) 334. | Fail to ensure blowout prevention pressure rating is proper | clause 4.6 (d) 335. | Fail to ensure ram preventers have hand wheels | clause 4.6 (e) 336. | Fail to meet Class II servicing requirements | clause 4.6 (f) 337. | Fail to install and operate accumulator system to manufacturers specifications | clause 4.6.4 (a) 338. | Fail to connect accumulator system to preventer with lines of proper pressure | clause 4.6.4 (b) 339. | Fail to ensure accumulator system is capable of providing sufficient pressure and volume | clause 4.6.4 (c) 340. | Fail to ensure accumulator system is recharged by pressure controlled pump | clause 4.6.4 (d) 341. | Fail to ensure accumulator capable of closing ram type preventer within 30 seconds | clause 4.6.4 (e) 342. | Fail to ensure accumulator system is capable of closing annular preventer within 60 seconds | clause 4.6.4 (f) 343. | Fail to ensure accumulator system is equipped with proper gauges and fittings | clause 4.6.4 (g) 344. | Fail to ensure accumulator system is equipped with check valve | clause 4.6.4 (h) 345. | Fail to connect accumulator system to nitrogen supply | section 4.6.5 346. | Fail to ensure nitrogen supply provides sufficient volume and pressure | clause 4.6.6 (a) 347. | Fail to ensure nitrogen supply has gauge to determine pressure | clause 4.6.6 (b) 348. | Fail to have operating controls readily accessible and at 5 metres from well for Class I and II wells | clause 4.6.7 (b) 349. | Fail to have an independent accumulator system with proper controls for Class III wells | clause 4.6.8 (a) 350. | Fail to have additional set of controls for Class III wells | clause 4.6.8 (b) 351. | Class I BOP system — fail to have diverter system with proper lines | clause 4.6.8.1 (a) 352. | Class I BOP system — fail to have a shut-off valve in bottom joint of tubing | clause 4.6.8.1 (b) 353. | Class I BOP system — fail to have a tubing stripper | clause 4.6.8.1 (c) 354. | Class II &III BOP lines — fail to ensure lines are of steel or flexible hose | clause 4.6.8.2 (a) 355. | Class II &III BOP lines — fail to have lines that are valved and of proper pressure | clause 4.6.8.2 (b) 356. | Class II & III BOP lines — fail to have lines that are connected to rig pump and tank | clause 4.6.8.2 (c) 357. | Class II & III BOP lines — fail to have lines that are properly fitted and connected | clause 4.6.8.2 (d) 358. | Class II & III BOP lines — fail to have lines of proper diameter | clause 4.6.8.2 (e) 359. | Class II & III BOP lines — fail to ensure lines are securely tied down | clause 4.6.8.2 (f) 360. | Class II & III BOP manifold — fail to ensure valves and steel lines with proper pressure | clause 4.6.9 (a) 361. | Class II & III BOP manifold — fail to have check valve | clause 4.6.9 (b) 362. | Class II & III BOP manifold — fail to have pressure relief valve | clause 4.6.9 (c) 363. | Class II & III BOP manifold — fail to install or have available accurate gauge | clause 4.6.9 (d) 364. | Fail to provide accurate pressure gauge during well shut-in | section 4.6.10 365. | Fail to maintain on a service rig a safety valve in the open position | section 4.6.11 366. | Fail to conduct a pressure test on each preventer prior to commencing operations | section 4.6.12 367. | Fail to conduct pressure test on preventers with pipe in the hole | section 4.6.13 368. | Fail to ensure BOP equipment is mechanically tested daily | section 4.6.14 369. | Fail to record tests in log book | section 4.6.15 370. | Fail to ensure properly certified driller at site | clause 4.6.17 (a) 371. | Fail to ensure rig crew is trained in operation of BOP equipment | clause 4.6.17 (b) 372. | Fail to ensure that BOP drills are performed every 7 days | clause 4.6.17 (c) 373. | Fail to ensure BOP drills are recorded in log book | clause 4.6.17 (d) 374. | Fail to provide sufficient heat in cold weather to ensure BOP system effective | section 4.6.18 375. | Fail to properly space equipment at well site | section 4.7 376. | Fail to maintain orderly work site | clause 5.1 (a) 377. | Fail to safely store all chemicals and fuel | clause 5.1 (b) 378. | Fail to properly remove and dispose of waste and unused equipment | clause 5.1 (c) 379. | Fail to properly dispose of oil field fluid produced from a well | clause 5.1.1 (a) 380. | Fail to properly handle, store or dispose of any products or waste | clause 5.1.1 (b) 381. | Fail to immediately remove product or waste that create a hazard | clause 5.1.1 (c) 382. | Fail to dispose of and keep stimulation fluids separate from oil field fluids | clause 5.1.1 (d) 383. | Fail to identify well with prominent sign | section 5.2 384. | Fail to mark battery or production site with name of operator | clause 5.3 (a) 385. | Fail to show operator’s name and emergency phone number at site | clause 5.3 (b) 386. | Fail to prevent waste of oil or gas | clause 5.4 (a) 387. | Fail to flare gas | clause 5.4 (b) 388. | Fail to meet setback requirements | section 5.5 389. | Locate flares less than 75 metres from buildings | clause 5.5.1 (a) 390. | Locate flares less than 50 metres from pipeline, electrical lines, railway or aircraft runway | clause 5.5.1 (b) 391. | Locate flares less than 30 metres from wellhead, tanks and buildings | clause 5.5.1 (c) 392. | Locate flares less than 15 metres from compressors, coolers, vessels and substations | clause 5.5.1 (d) 393. | Locate oil and brine tanks less than 75 metres from buildings | clause 5.5.2 (a) 394. | Locate oil and brine tanks less than 30 metres from pipelines, electrical lines, pits, office or switch gear | clause 5.5.2 (b) 395. | Locate oil and brine tanks less than 20 metres from wellhead, railway or road allowance | clause 5.5.2 (c) 396. | Locate oil and brine tanks less than 15 metres from compressors, buildings, coolers, heaters or vessels | clause 5.5.2 (d) 397. | Locate oil and brine tanks less than 1 metre from other oil and brine tanks | clause 5.5.2 (e) 398. | Locate process vessel less than 60 metres from buildings | clause 5.5.3 (a) 399. | Locate process vessel less than 20 metres from railway or road allowance | clause 5.5.3 (b) 400. | Locate process vessel less than 15 metres from tanks, pits, wellhead or office | clause 5.5.3 (c) 401. | Locate process vessel less than 10 metres from other vessels | clause 5.5.3 (d) 402. | Locate process vessel 7 metres from tanks where vessel is unfired | clause 5.5.3 (e) 403. | Fail to properly equip diesel engines | section 5.5.4 404. | Fail to ensure internal combustion engine is 15 metres from well when obtaining air | section 5.5.4.1 405. | Engine exhaust pipe — fail to prevent emergence of flame | clause 5.5.4.2 (a) 406. | Engine exhaust pipe — fail to ensure pipe end is 2 metres from well | clause 5.5.4.2 (b) 406.1 | Fail to store oil or oil field fluids in proper container | clause 5.6 (a) 406.2 | Store oil and oil field fluids in earthen pit, pond or underground tank | clause 5.6 (b) 407. | Fluid storage tanks — fail to surround with dike or firewall of proper capacity | clause 5.6.1 (a) 408. | Fluid storage tanks — insufficient permeability | clause 5.6.1 (b) 409. | Fluid storage tanks — fail to maintain dike or firewall in good condition | clause 5.6.1 (c) 410. | Fail to use proper above ground storage tank to store oil and brine | section 5.6.2 411. | Fail to electrically ground above ground tank | clause 5.6.4 (a) 412. | Fail to electrically ground trucks when loading/unloading | clause 5.6.4 (b) 413. | Fail to comply with API RP651 for cathodically protected above ground tanks | section 5.6.5 414. | Storage tank nameplate — fail to state construction standard | clause 5.6.6 (a) 415. | Storage tank nameplate — fail to state the year built | clause 5.6.6 (b) 416. | Storage tank nameplate — fail to state capacity | clause 5.6.6 (c) 417. | Storage tank nameplate — fail to state fabricator | clause 5.6.6 (d) 418. | Storage tank nameplate — fail to state diameter and height | clause 5.6.6 (e) 419. | Piping systems — fail to use proper pipeline | section 5.7 420. | Piping systems — fail to use proper material for pipeline fabrication and installation | section 5.7.1 421. | Piping systems — fail to provide a certified Examiner for pipeline construction | section 5.7.2 422. | Piping systems — fail to have proper pipeline burial depth | section 5.7.3 423. | Pressure vessel — fail to properly install, repair, construct or inspect | section 5.8 424. | Well flare stacks — fail to have proper height and diameter | clause 5.9 (a) 425. | Well flare stacks — fail to have proper height and diameter | clause 5.9 (b) 426. | Well flare stacks — fail to properly install, operate and design | clause 5.9 (c) 427. | Gas compressors — fail to properly design, construct, operate and maintain | clause 5.10.1 (a) 428. | Gas compressors — fail to ensure shutdown controls operate properly | clause 5.10.1 (b) 429. | Gas compressors — fail to ensure shut down controls are triggered on high and low pressure | clause 5.10.1 (c) 430. | Fail to ensure electrical materials conform to Electrical Code | clause 5.11 (a) 431. | Fail to ensure electrical materials conform to CSA | clause 5.11 (b) 432. | Fail to ensure electrical materials conform to API Standards | clause 5.11 (c) 433. | Fail to ensure electrical materials conform to the Shipping Act (Canada) | clause 5.11 (d) 434. | Fail to ensure electrical equipment is installed by qualified electrician | section 5.11.1 435. | Fail to ensure pressure control, limiting and relieving equipment conform to CSA code | section 5.12 436. | Fail to ensure that fires are safeguarded to avoid a hazard | clause 5.13 (a) 437. | Fail to store explosives 150 metres from work | clause 5.13 (b) 438. | Fail to provide for an Examiner to check works weekly for leaks or spills | clause 5.14 (a) 439. | Fail to provide for an Examiner to check works weekly for damage | clause 5.14 (b) 440. | Fail to provide for an Examiner to check works weekly for unsafe conditions | clause 5.14 (c) 441. | Fail to provide for an Examiner to certify annually that works comply with Provincial Standards | section 5.14.1 442. | Suspended wells — fail to isolate all zones from one another | clause 5.15 (a) 443. | Suspended wells — fail to ensure all fresh water zones are isolated by cemented casing | clause 5.15 (b) 444. | Porous and permeable fluid bearing zones — fail to isolate zones with bridge plug and cement | clause 5.15.1 (a) 445. | Porous and permeable fluid bearing zones — fail to isolate zone with a bridge capped with stone and cement | clause 5.15.1 (b) 446. | Porous and permeable fluid bearing zones — fail to isolate zones by alternative technique | clause 5.15.1 (c) 447. | Porous and permeable fluid bearing zone — fail to ensure cementing procedures and design complies with Provincial Standards | clause 5.15.1 (d) 448. | Suspended well onshore — fail to have two bull-plugged valves | clause 5.15.2 (a) 449. | Suspended well onshore — fail to install two valve and bull-plugged side outlets | clause 5.15.2 (b) 450. | Suspended well onshore — fail to isolate the intermediate casing annulus before suspending well | clause 5.15.2 (c) 451. | Suspended well onshore — fail to provide access to a two-valved bull plug at annulus | clause 5.15.2 (d) 452. | Suspended well onshore — fail to protect wellhead with steel posts or fencing | clause 5.15.2 (e) 453. | Suspended well onshore — fail to remove valve handles or install lock and chain | clause 5.15.3 (a) 454. | Suspended well onshore — fail to enclose well site with building or chain-link fence | clause 5.15.3 (b) 455. | Suspended well onshore — fail to inspect wellhead and valves for leaks | section 5.15.4 456. | Suspended well onshore — fail to lubricate and service wellhead valves annually | section 5.15.5 457. | Suspended well onshore — fail to provide for an Examiner to certify well suspended properly | clause 5.15.6 (a) 458. | Suspended well onshore — fail to annually examine all valve outlets for safety and integrity | clause 5.15.6 (b) 459. | Site rehabilitation — fail to rehabilitate within one year of end of operations | section 5.16 460. | Site rehabilitation — fail to dispose of all liquid and solid waste | clause 5.16 (a) 461. | Site rehabilitation — fail to clean area of all debris | clause 5.16 (b) 462. | Site rehabilitation — fail to drain and fill excavations | clause 5.16 (c) 463. | Site rehabilitation — fail to remove surface works, concrete, machinery and materials | clause 5.16 (d) 464. | Site rehabilitation — fail to level and restore grade | clause 5.16 (e) 465. | Site rehabilitation — fail to provide Examiner to certify rehabilitation complies with Provincial Standards | clause 5.16 (f) 466. | Water covered area — fail to ensure wellhead is properly located and encased | clause 5.17 (a) 467. | Water covered area — fail to ensure wellhead is properly located in fishing area | section 5.17.1 468. | Water covered area — fail to remove structure within 30 days of end of drilling or plugging | section 5.17.2 469. | Water covered area — Use a platform not approved by the Ministry | section 5.17.3 470. | Well in water covered area — fail to mark each well and pipeline junction | clause 5.17.4 (a) 471. | Well in water covered area — fail to identify operator and junction designation | clause 5.17.4 (b) 472. | Well in water covered area — fail to maintain markers | clause 5.17.4 (c) 472.1 | Offshore pipeline gathering system not designed, constructed or maintained in accordance with CSA Z662-99 | section 5.17.5 473. | Fail to install metering equipment to measure tubing and casing pressure | clause 6.1 (a) 474. | Fail to install metering equipment to measure flow rate | clause 6.1 (b) 475. | Fail to install metering equipment to permit oil, gas or water sampling | clause 6.1 (c) 476. | Fail to keep records of quantities of oil, gas and water produced | clause 6.2 (a) 477. | Fail to keep records of average separator pressure | clause 6.2 (b) 478. | Fail to keep records of product disposition | clause 6.2 (c) 479. | Fail to keep records of purchaser and amount realized | clause 6.2 (d) 480. | Fail to prevent waste of hydrocarbon resources | clause 6.3 (a) 481. | Fail to prevent the waste of reservoir energy | clause 6.3 (b) 482. | Fail to maximize ultimate recovery of oil and gas | clause 6.3 (c) 483. | Fail to minimize flaring or venting of gas | clause 6.3 (d) 484. | Fail to obtain information to optimize production and evaluate conservation | section 6.4 485. | Fail to maintain monthly records of production volumes, reservoir pressure and fluids injected | section 6.4.1 486. | Fail to properly meter for fluid and gas measurements | section 6.5 487. | Fail to ensure meter accuracy for fluid and gas measurements | clause 6.6 (a) 488. | Fail to ensure meter re-calibration | clause 6.6 (b) 489. | Fail to report bottom hole pressure to Ministry on Form 7 | section 6.7 490. | Fail to properly determine bottom-hole pressure | section 6.8 491. | Fail to take a gas or oil sample for each new oil pool | section 6.9 492. | Initial production testing period report — fail to include daily production volumes on report | clause 6.10 (a) 493. | Initial production testing period report — fail to include estimate of well’s potential | clause 6.10 (b) 494. | Initial production testing period report — fail to include plans for gas conservation | clause 6.10 (c) 495. | Initial production testing period report — fail to include evaluation, estimate and pool boundary | clause 6.10 (d) 496. | Initial production testing period report — fail to include bottom hole pressure | clause 6.10 (e) 497. | Fail to flare gas | section 6.11 498. | Permit flaring in excess of permitted monthly volumes | section 6.11.1 498.1 | Fail to produce well evenly throughout the month | section 6.11.3 499. | Fail to contain flaring within permitted monthly volumes — same pool, 2 or more wells | section 6.11.4 500. | Fail to take an annual shut-in pressure measurement | clause 6.12 (a) 500.1 | Fail to report measurements | clause 6.12 (b) 501. | Fail to report observed field data re deliverability of well to Ministry on Form 7 | clause 6.12 (c) 502. | Fail to take annual shut-in pressure with dead-weight gauge | clause 6.12.1 (a) 503. | Fail to take annual shut-in pressure within proper time | clause 6.12.1 (b) 504. | Fail to report annual shut-in pressure on Form 8 | clause 6.12.1 (c) 505. | Design — fail to permanently protect water formations from contamination | clause 7 (a) 506. | Design — fail to protect existing formations from injected fluid | clause 7 (b) 507. | Design — fail to prevent migration of fluids between formations | clause 7 (c) 508. | Operation — fail to ensure that disposal fluids are compatible with disposal formation | clause 7 (d) 509. | Operation — fail to ensure that disposal fluids are retained within formation | clause 7 (e) 510. | Construction — fail to notify in writing landowners and operators within 750 metres | clause 7.1 (a) 511. | Construction — fail to notify in writing the local municipality | clause 7.1 (b) 512. | Construction — fail to notify Ministry in writing | clause 7.1 (c) 513. | Design — fail to provide for injection of oil field fluid through tubing | clause 7.2 (a) 514. | Design — fail to provide isolation of annular space between tubing and casing from injection zone | clause 7.2 (b) 515. | Design — fail to include corrosion inhibitor | clause 7.2 (c) 516. | Design — fail to provide for isolation of fresh water zones | clause 7.2 (d) 517. | Design — fail to provide for cementing the surface casing | clause 7.2 (e) 518. | Design — fail to provide for proper wellhead components | clause 7.2 (f) 519. | Water sampling — fail to collect samples for each penetrated aquifer and record depth | clause 7.3 (a) 520. | Water sampling — fail to provide a copy of the chemical analysis of water in penetrated aquifer to the Ministry | clause 7.3 (b) 521. | Convert existing well 20 years or older to a disposal well | section 7.4.1 522. | Fail to submit completed disposal report | section 7.5 523. | Disposal operations — inject oil field fluid from another source | clause 7.6 (a) 524. | Disposal operations — inject liquid industrial waste | clause 7.6 (b) 525. | Disposal operations — inject oil field fluid between outermost casing and well bore or annular space between strings of casing | clause 7.6 (c) 526. | Revoked: O. Reg. 359/10, s. 8 (14). 527. | Revoked: O. Reg. 359/10, s. 8 (14). 528. | Revoked: O. Reg. 359/10, s. 8 (14). 529. | Revoked: O. Reg. 359/10, s. 8 (14). 530. | Revoked: O. Reg. 359/10, s. 8 (14). 531. | Revoked: O. Reg. 359/10, s. 8 (14). 532. | Revoked: O. Reg. 359/10, s. 8 (14). 533. | Revoked: O. Reg. 359/10, s. 8 (14). 534. | Revoked: O. Reg. 359/10, s. 8 (14). 535. | Revoked: O. Reg. 359/10, s. 8 (14). 536. | Revoked: O. Reg. 359/10, s. 8 (14). 537. | Revoked: O. Reg. 359/10, s. 8 (14). 538. | Revoked: O. Reg. 359/10, s. 8 (14). 539. | Revoked: O. Reg. 359/10, s. 8 (14). 540. | Revoked: O. Reg. 359/10, s. 8 (14). 541. | Revoked: O. Reg. 359/10, s. 8 (14). 542. | Revoked: O. Reg. 359/10, s. 8 (14). 543. | Revoked: O. Reg. 359/10, s. 8 (14). 544. | Revoked: O. Reg. 359/10, s. 8 (14). 545. | Fail to inject oil field fluids by gravity feed | clause 7.7 (a) 546. | Fail to inject oil field fluids into formations as deep as practical | clause 7.7 (b) 547. | Pre-commissioning — fail to identify wells within 750 metres | clause 7.8 (a) 548. | Pre-commissioning — fail to confirm integrity of injection casing by pressure tests or cement logs | clause 7.8 (b) 548.1 | Pre-commissioning — fail to run a cement bond log to verify cement integrity | clause 7.8 (c) 549. | Pre-commissioning — fail to conduct injectivity test | clause 7.8 (d) 550. | Pre-commissioning — fail to submit a disposal report | clause7.8 (e) 551. | Pre-commissioning — fail to submit an operating procedure | clause 7.8 (f) 552. | Well within 750 metres of water well — fail to report depth of water well | clause 7.8.1 (a) 553. | Well within 750 metres of water well — fail to report the age of water well | clause 7.8.1 (b) 554. | Well within 750 metres of water well — fail to report volume of water taken from water well | clause 7.8.1 (c) 555. | Well within 750 metres of water well — fail to report static level of water in water well | clause 7.8.1 (d) 556. | Injection test — fail to submit initial test | section 7.9 557. | Injection test — fail to include the depths of the injection intervals | clause 7.9.1 (a) 558. | Injection test — fail to include the rates of injection | clause 7.9.1 (b) 559. | Injection test — fail to include the injection pressures | clause 7.9.1 (c) 560. | Injection test — fail to include the volume and source of fluids | clause 7.9.1 (d) 561. | Injection test — fail to ensure proper pressure during initial test | section 7.9.2 562. | Injection test — initial test more than 30 days in duration | clause 7.9.3 (a) 563. | Injection test — initial test exceeds 500 m³ of injected fluid | clause 7.9.3 (b) 563.1 | Commence disposal operations without written approval from the Ministry | section 7.10 564. | Fail to measure the volume of injected fluid and pressure | section 7.10.1 565. | Fail to verify presence of corrosion inhibiting fluid by certified Examiner | section 7.10.2 566. | Fail to ensure subsurface pressure does not exceed 75 per cent of fracture pressure | section 7.10.3 567. | Fail to keep plans and maps of disposal well | section 7.11 568. | Fail to have a spill contingency plan | section 7.12 569. | Fail to conduct a pressure test of annular space every 5 years | section 7.13 570. | Fail to stop injection of fluid where loss of fluid or increase in pressure | section 7.14 571. | Fail to maintain complete records for each disposal well | section 7.15 572. | Revoked: O. Reg. 359/10, s. 8 (17). 573. | Revoked: O. Reg. 359/10, s. 8 (17). 574. | Revoked: O. Reg. 359/10, s. 8 (17). 575. | Revoked: O. Reg. 359/10, s. 8 (17). 576. | Revoked: O. Reg. 359/10, s. 8 (17). 577. | Revoked: O. Reg. 359/10, s. 8 (17). 578. | Revoked: O. Reg. 359/10, s. 8 (17). 579. | Revoked: O. Reg. 359/10, s. 8 (17). 580. | Revoked: O. Reg. 359/10, s. 8 (17). 581. | Revoked: O. Reg. 359/10, s. 8 (17). 582. | Revoked: O. Reg. 359/10, s. 8 (17). 583. | Fail to provide for an Examiner to examine facilities semi-annually | section 7.16 584. | Well servicing — fail to install and maintain BOP | section 8.1 585. | Well servicing — fail to ensure proper rating on lubricator system | section 8.1.1 586. | Well servicing — fail to ensure proper spacing of equipment | section 8.2 587. | Well servicing — fail to install pressure gauge to determine well annulus pressure | section 8.3 588. | Well servicing — fail to maintain stabbing valve in open position | section 8.5 589. | Well servicing — fail to use a stub lubricator system | section 8.6 590. | Well servicing — fail to properly ground electrical system | section 8.7 591. | Well servicing — fail to keep a record of all servicing on well | section 8.10 591.1 | Fail to design and construct salt solution mine as required | section 9.1 592. | Fail to ensure mining operations are 150 metres from operator’s property boundary | clause 9.5 (b) 593. | Fail to ensure salt extraction is 50 metres from operator’s property boundary | clause 9.5 (c) 594. | Fail to ensure caverns and galleries have tight hydraulic control | section 9.5.1 595. | Fail to employ a blanketing material for roof control | section 9.6 596. | Drilling — fail to cement to surface all casings | clause 9.7 (a) 597. | Drilling — fail to set production casing 3 metres into salt formation | clause 9.7 (b) 598. | Drilling — fail to include a cement bond log and casing evaluation log | subclause 9.7 (c) (i) 599. | Drilling — fail to conduct pressure test on production casing and seat | subclause 9.7 (c) (ii) 600. | Drilling — fail to conduct pressure test of the formation below production casing seat | subclause 9.7 (c) (iii) 601. | Drilling — hanging tubing string does not comply with API standard | clause 9.7 (d) 601.1 | Fail to carry out solution mining operations in accordance with written mining plan | section 9.8 602. | Operation and monitoring — no operating and maintenance procedures | subclause 9.8.1 (a) (i) 603. | Operation and monitoring — no emergency response procedures | subclause 9.8.1 (a) (ii) 604. | Operation and monitoring — no procedures re performance of maintenance functions | subclause 9.8.1 (a) (iii) 605. | Operation and monitoring — fail to comply with operating and maintenance procedures | clause 9.8.1 (b) 606. | Operation and monitoring — fail to keep records necessary to administer operating and maintenance procedures | clause 9.8.1 (c) 607. | Operation and monitoring — fail to ensure staff are trained | clause 9.8.1 (d) 608. | Operation and monitoring — fail to update operating and maintenance procedures as required | clause 9.8.1 (e) 609. | Operating and monitoring — fail to limit the maximum injection and withdrawal rates | clause 9.8.1 (f) 610. | Operating and monitoring — fail to maintain documents for activities on wells and pipelines | subclause 9.8.1 (g) (i) 611. | Operating and monitoring — fail to maintain documents for downhole activities and copies of all logs | subclause 9.8.1 (g) (ii) 612. | Operating and monitoring — fail to keep daily records of water injected and brine recovered | subclause 9.8.1 (h) (i) 613. | Operating and monitoring — fail to keep daily records of volume and pressure of blanketing material | subclause 9.8.1 (h) (ii) 613.1 | Fail to conduct mechanical integrity testing as required | clause 9.8.2 (a) 614. | Fail to provide for an Examiner to certify the mechanical integrity of each well | clause 9.8.2 (b) 615. | Fail to monitor hydraulic closure and provide Examiner certification annually | section 9.8.3 615.1 | Fail to conduct sonar survey | clause 9.8.4 (a) 616. | Fail to plot the results of the sonar survey | clause 9.8.4 (b) 616.1 | Fail to use sonar survey to ensure solution mining is in accordance with mining plan | clause 9.8.4 (c) 617. | Fail to conduct subsidence monitoring annually using a qualified surveyor | clause 9.8.5 (a) 618. | Fail to properly record the subsidence data and submit to Ministry | clause 9.8.5 (b) 619. | Fail to comply with well servicing requirements | section 9.8.6 620. | Abandonment — fail to include a sonar survey on the cavern | clause 9.9 (a) 621. | Abandonment — fail to include a mechanical test on the casing | clause 9.9 (b) 621.1 | Fail to plug solution mining well | clause 9.9 (c) 621.2 | Fail to comply with CSA Standard Z341-98 Storage of Hydrocarbons in Underground Formations | section 10 622. | Hydrocarbon storage — fail to have Examiner validate mechanical integrity test | section 10.1 623. | Hydrocarbon storage — fail to conduct annual examination of surface works certified by Examiner | section 10.2 624. | Fail to notify the Ministry of well overhauls | subclause 10.3 (a) (i) 625. | Fail to notify the Ministry of a change of service in a cavern | subclause 10.3 (a) (ii) 626. | Fail to notify the Ministry of damage or leak at well head or casing | subclause 10.3 (a) (iii) 627. | Fail to notify the Ministry of emergency | clause 10.3 (b) 628. | Fail to ensure protection of oil or gas producing horizons | clause 11 (a) 629. | Fail to prevent the migration of oil, gas or water | clause 11 (b) 630. | Fail to seal off and isolate all porous formations | clause 11 (c) 631. | Fail to ensure plugging does not constitute a hazard to surface users | clause 11 (d) 632. | Fail to plug hydrocarbon storage wells in accordance with CSA Z341-98 | clause 11.1 (a) 633. | Fail to plug in accordance with section 9.9 of the Standards | clause 11.1 (b) 634. | Fail to properly remove casing, tubing and material from well | section 11.2. 635. | Fail to use neat cement | subclause 11.3 (a) (i) 636. | Fail to mix cement in accordance with API Specifications | subclause 11.3 (a) (ii) 637. | Fail to make cement plug in the form of a water base slurry | subclause 11.3 (a) (iii) 638. | Fail to make cement plug sulphate resistant | subclause 11.3 (a) (iv) 639. | Fail to make bridges of wood, stone, gravel or lead | clause 11.3 (b) 640. | Fail to deposit cement plug by displacement or dump bailer | section 11.4 641. | Fail to ensure pumped cement plugs have sufficient slurry volume | clause 11.5 (a) 642. | Fail to ensure dump-bailed plugs have sufficient volume | clause11.5 (b) 643. | Fail to locate plug at top of each zone or salt cavern and certify location | clause 11.6 (a) 644. | Fail to locate the top most plug set in the well and certify location | clause11.6 (b) 645. | Fail to fill area between plugs with water or drilling mud | section 11.7 646. | Fail to set cement plugs above and below each oil, gas and fluid bearing zone | clause 11.8 (a) 647. | Fail to set cement plugs at top of formations | clause11.8 (b) 648. | Fail to extend plugs 8 metres in the well | section 11.9 649. | Fail to properly recover casing when surface casing is left in hole | clause 11.10 (a) 650. | Fail to properly recover casing when surface casing is removed | clause 11.10 (b) 651. | Fail to place a cement plug 15 metres below zone and 15 metres above top of zone | clause 11.10 (c) 652. | Fail to set plug across shoe of surface casing | clause 11.11 (a) 653. | Fail to place plug inside the surface casing | clause 11.11 (b) 654. | Fail to place plug inside casing below the base where intermediate casing cemented | clause 11.11 (c) 655. | Fail to place plug across the shoe where intermediate casing to be left | clause 11.11 (d) 656. | Fail to recover casing to allow placement of plugs where intermediate casing not cemented | clause 11.11 (e) 657. | Fail to place plug inside casing below the base where production casing cemented | clause 11.11 (f) 658. | Fail to recover casing to allow placement of plug where production casing not cemented | clause 11.11 (g) 659. | Fail to set 8 metre plug at top of productive zone | clause 11.11 (h) 660. | Rehabilitation — onshore well — fail to dispose of all waste | clause 11.13 (a) 661. | Rehabilitation — onshore well — fail to clear the area of all debris | clause 11.13 (b) 662. | Rehabilitation — onshore well — fail to drain and fill excavations | clause 11.13 (c) 663. | Rehabilitation — onshore well — fail to remove all surface works | clause 11.13 (d) 664. | Rehabilitation — onshore well — fail to level and restore original grade of the site | clause 11.13 (e) 665. | Rehabilitation — water covered area — fail to cut off any casing in water covered site | section 11.13.1 666. | Rehabilitation — fail to record and submit Form 10 for every plugged well | section 11.14 667. | Fail to calculate using proper rates | clause 12 (a) 668. | Fail to make fee payment | clause 12 (b) 669. | Fail to submit Form 7 with fee payment | clause 12 (c) 670. | Drilling activity notice — fail to notify Ministry 48 hours prior to drilling | clause 13.2 (a) 671. | Drilling activity notice — fail to notify Ministry of drilling suspension date within 48 hours | subclause 13.2 (b) (i) 672. | Drilling activity notice — fail to notify Ministry of well depth within 48 hours | subclause 13.2 (b) (ii) 673. | Drilling activity notice — fail to notify Ministry of well condition within 48 hours | subclause 13.2 (b) (iii) 674. | Drilling activity notice — fail to notify Ministry of total depth and status of well within 48 hours of TD date | clause 13.2 (c) 675. | Drilling activity notice — fail to notify Ministry of completion date and well status within 48 hours | clause 13.2 (d) 676. | Drilling activity notice — fail to notify the Ministry 48 hours prior to plugging a well | clause13.2 (e) 676.1 | Fail to report emergency notification in writing | section 13.3 677. | Fail to complete a Drilling and Completion Report in Form 7 within 60 days of end of operation | section 13.4 678. | Fail to deliver drilling samples within 30 days | section 13.5 679. | Fail to properly pack and label drill cores | clause 13.6 (a) 680. | Fail to submit core or other analysis to Ministry within 30 days of completion | section 13.6.1 681. | Fail to ensure no core is destroyed | clause 13.7 (a) 682. | Fail to ensure cores are delivered to library within 1 year of TD date | clause 13.7 (b) 683. | Fail to supply logs or surveys to the Ministry within 30 days | section 13.8 684. | Fail to complete Form 7 within 30 days of any well activities other than drilling or deepening | section 13.9 685. | Fail to submit connate water determinations within 30 days | clause 13.10 (a) 686. | Fail to submit copies of drill stem and production test within 30 days | clause 13.10 (b) 687. | Fail to submit static hole pressure measurements within 30 days | clause 13.10 (c) 688. | Fail to submit pressure measurements and back pressure tests within 30 days | clause 13.10 (d) 689. | Fail to submit gas ratios within 30 days | subclause 13.10 (e) (i) 690. | Fail to submit liquid phase volumes within 30 days | subclause 13.10 (e) (ii) 691. | Fail to submit formation volume factors within 30 days | subclause 13.10 (e) (iii) 692. | Fail to submit tank oil gravities within 30 days | subclause 13.10 (e) (iv) 693. | Fail to submit separator and stock tank gas-oil ratios within 30 days | subclause 13.10 (e) (v) 694. | Fail to submit bubble point pressure of reservoir fluid within 30 days | subclause 13.10 (e) (vi) 695. | Fail to submit compressibility of saturated reservoir oil within 30 days | subclause 13.10 (e) (vii) 696. | Fail to submit viscosity of reservoir oil within 30 days | subclause 13.10 (e) (viii) 697. | Fail to submit fractional analysis of casing head gas and reservoir fluid within 30 days | subclause 13.10 (e) (ix) 698. | Fail to submit Annual Production Report of Monthly Well or Field/Pool Production by February 15 | section 13.11 699. | Fail to submit an Annual Report on Monthly Injection by February 15 | section 13.12 700. | Disposal well — fail to submit records of pressure measurements and tests within 30 days | subclause 13.13 (a) (i) 701. | Disposal well — fail to submit copies of chemical analysis from water wells within 30 days | subclause 13.13 (a) (ii) 702. | Disposal well — fail to submit the mechanical integrity test within 30 days | subclause 13.13 (a) (iii) 703. | Disposal well — fail to submit an Annual Subsurface Fluid Disposal Report by February 15 | clause 13.13 (b) 704. | Disposal well — fail to submit a Plugging of a Well Report within 30 days | section 13.14 705. | Disposal well — fail to submit an Annual Report of Geophysical/Agrochemical Activity by February 15 | section 13.15 706. | Annual well status report — fail to show all the wells | clause 13.16 (a) 707. | Annual well status report — fail to show the status of each well | clause 13.16 (b) 708. | Annual well status report — fail to show calculation of well licence fee | clause 13.16 (c) 709. | Annual well status report — not accompanied by licence fee | clause 13.16 (d) 710. | Third party gas report — fail to submit by February 15 | section 13.16 711. | Fail to submit completed third party gas report | section 13.17 712. | Fail to submit completed third party oil report | section 13.18 713. | Revoked: O. Reg. 359/10, s. 8 (25). 714. | Revoked: O. Reg. 359/10, s. 8 (25). 715. | Revoked: O. Reg. 359/10, s. 8 (25). 716. | Revoked: O. Reg. 359/10, s. 8 (25). 717. | Revoked: O. Reg. 359/10, s. 8 (25). 718. | Revoked: O. Reg. 359/10, s. 8 (25). 719. | Revoked: O. Reg. 359/10, s. 8 (25). 720. | Revoked: O. Reg. 359/10, s. 8 (25). 721. | Revoked: O. Reg. 359/10, s. 8 (25). 722. | Fail to submit the Initial Production Test Period Report within 10 days | section 13.19 723. | Fail to report voluntarily unitized unit area and required information | section 13.20 724. | Fail to report voluntarily amended unit area required information | section 13.21 725. | Revoked: O. Reg. 359/10, s. 8 (26). 726. | Revoked: O. Reg. 359/10, s. 8 (26). 727. | Revoked: O. Reg. 359/10, s. 8 (26). 728. | Revoked: O. Reg. 359/10, s. 8 (26). 729. | Revoked: O. Reg. 359/10, s. 8 (26). 730. | Revoked: O. Reg. 359/10, s. 8 (26). 731. | Revoked: O. Reg. 359/10, s. 8 (26). 732. | Revoked: O. Reg. 359/10, s. 8 (26). 733. | Revoked: O. Reg. 359/10, s. 8 (26). 734. | Revoked: O. Reg. 359/10, s. 8 (26). 735. | Revoked: O. Reg. 359/10, s. 8 (26). 736. | Fail to submit an Annual Report of Solution Mined Salt Production by February 15 | section 13.22 737. | Salt solution mining — fail to submit results of all tests within 30 days | section 13.23 737.1 | Fail to immediately contact Ministry in case of spill or subsidence occurrence | section 13.24 738. | Underground storage tanks — fail to construct a dike surrounding the tank | clause 14.2 (a) 739. | Underground storage tanks — fail to construct cover to prevent access | subclause 14.2 (b) (i) 740. | Underground storage tanks — fail to construct chain link fence to prevent access | subclause 14.2 (b) (ii) 741. | Underground storage tanks — fail to install a ladder inside the tank | clause 14.2 (c) 742. | Underground storage tanks — fail to install a warning sign on the fence or cover | clause 14.2 (d) 743. | Oil field fluid storage — fail to ensure fluid cannot create a hazard | clause 14.3 (a) 744. | Oil field fluid storage — fail to ensure the storage area does not leak | clause 14.3 (b) 745. | Oil field fluid storage — fail to construct a chain link fence around storage area | clause 14.3 (c) 746. | Oil field fluid storage — fail to ensure all gates on fence are closed and locked | clause 14.3 (d) 747. | Oil field fluid storage — fail to install prominent warning signs | clause 14.3 (e) 748. | Oil field fluid storage — fail to install a ladder | clause 14.3 (f) 749. | Oil field fluid storage — fail to install life-saving rescue equipment | clause 14.3 (g) 750. | Fail to install a valve and piping on well before being serviced | section 14.4 751. | Fail to cap a suspended well | clause 14.5 (a) 752. | Fail to mark the site with well name | clause 14.5 (b) 753. | Fail to plug the well when capable of flow to surface | clause 14.5 (c)
Read the PROCEEDINGS COMMENCED BY CERTIFICATE OF OFFENCE on e-Laws ↗

Made under Provincial Offences Act, R.S.O. 1990, c. P.33.