WELLS, R.R.O. 1990, Reg. 903

Section 16.4

Cite as WELLS, R.R.O. 1990, Reg. 903, s. 16.4 · current to November 11, 2026 · consolidated from January 1, 2020 · read from e-Laws on November 16, 2026

The text

(1) Despite clause 16.3 (1) (a), a person constructing wells may complete one well record for a group of wells instead of a separate well record for each individual well if all the following circumstances exist: 1. Every well in the group is a test hole or dewatering well. 2. Every well in the group is located, i. on the same property as another well in the group, ii. on a property that is adjacent to a property on which another well in the group is located, or that would be adjacent but for a road between the two properties, or iii. on a property that has only one or two intervening properties between it and a property on which another well in the group is located. 3. The structural stage of every well in the group is complete or, if the wells are being constructed in phases, the structural stage of every well in the relevant phase of construction is complete. 4. Each owner of land on which a well in the group is situated has given written consent to the use of a single well record for the group and the well record states that all the required consents have been given. O. Reg. 372/07, s. 17. (2) For the purpose of subparagraph 2 iii of subsection (1), the following rules apply to the determination of the number of intervening properties between two properties on which wells are located: 1. The number of intervening properties shall be determined along a straight line joining the two wells. 2. If the straight line mentioned in paragraph 1 crosses a road, the road shall not be counted as an intervening property, unless one or both of the two wells is located on or inside the boundaries of the road. 3. If part of the straight line mentioned in paragraph 1 is on or within the boundaries of a road, the number of intervening properties shall be determined with reference to the properties adjacent to that portion of the road, on the side of the road that has fewer properties. O. Reg. 372/07, s. 17. (3) A person constructing wells who completes one well record for a well cluster under subsection (1) shall, (a) indicate in the well record, in a convenient, concise and comprehensive manner, which of the wells share common features, such as diameter, construction technique, casing, venting, pumps and method of abandonment; (b) include in the well record a statement that the person constructing the well will promptly submit to the Director, on request, any additional information in the person’s custody or control related to any well in the well cluster that the person has constructed; (c) despite clause 16.3 (1) (b), deliver to the well purchaser and each owner of land on which a well in the well cluster is situated a copy of the well record for the well cluster within 60 days after the commencement of construction of the first well or, if the wells are being constructed in phases, within 60 days after the commencement of construction of the first well in the relevant phase of construction; and (d) despite clause 16.3 (1) (c), forward a copy of the well record for the well cluster to the Director within 75 days after the commencement of construction of the first well or, if the wells are being constructed in phases, within 75 days after the commencement of construction of the first well in the relevant phase of construction. O. Reg. 372/07, s. 17. (4) If one well record is completed for a well cluster under subsection (1) and an alteration, other than a minor alteration, is made to a well in the well cluster, (a) this section ceases to apply to that well; and (b) the person making the alteration shall obtain and affix a well tag in accordance with subsection 14.11 (2) and comply with section 16.3. O. Reg. 372/07, s. 17. (5) A person constructing a well who completes a new well record under subsection (4) shall, (a) despite clause 16.3 (1) (b), deliver to the well purchaser and each owner of the land on which the well in the well cluster is affected by the subsequent construction a copy of the well record within 60 days after the commencement of the subsequent construction or, if the subsequent construction is done in phases, within 60 days after the commencement of the relevant phase of the subsequent construction; and (b) despite clause 16.3 (1) (c), forward a copy of the well record to the Director within 75 days after the commencement of the subsequent construction or, if the subsequent construction is done in phases, within 75 days after the commencement of the relevant phase of the subsequent construction. O. Reg. 372/07, s. 17.
Read the WELLS on e-Laws ↗

Made under Ontario Water Resources Act, R.S.O. 1990, c. O.40.