MINES AND MINING PLANTS, R.R.O. 1990, Reg. 854
Section 5
Cite as MINES AND MINING PLANTS, R.R.O. 1990, Reg. 854, s. 5 · current to November 11, 2026 · consolidated from July 1, 2025 · read from e-Laws on November 16, 2026
The text
(1) Before proceeding with a change listed in subsection (2), the owner of a mine or mining plant shall ensure that,
(a) any drawings, plans or specifications that involve the practice of professional engineering within the meaning of the Professional Engineers Act are prepared or checked by an engineer and signed, dated and sealed by that engineer before they are issued; and
(b) a written management of change procedure that sets out the information required under subsection (3) has been developed. O. Reg. 69/23, s. 3.
(2) For the purposes of subsection (1), the following are the listed changes:
1. The construction or design of a mine or mining plant.
2. The construction of a major structure or system at a mine or mining plant.
3. The introduction or use of a new mining technique, method, technology or process.
4. The introduction or use of new equipment.
5. A major addition to, or major alteration of, a matter referred to in paragraphs 1 to 4. O. Reg. 69/23, s. 3.
(3) A written management of change procedure required under clause (1) (b) must set out how,
(a) the hazards or potential hazards associated with the changes described in subsection (2) will be evaluated and reviewed to ensure the protection of worker health and safety;
(b) the joint health and safety committee or health and safety representative, if any, will be notified of the proposed changes; and
(c) the changes will be authorized, and how that authorization will be communicated to workers prior to implementation. O. Reg. 69/23, s. 3.
(4) The owner of a mine or mining plant shall ensure that any drawings, plans and specifications that are prepared in respect of a change listed in subsection (2), including but not limited to those described in clause (1) (a), are kept readily available at the mine site. O. Reg. 69/23, s. 3.
(5) The employer shall notify an inspector,
(a) when portable crushing, screening or associated washing equipment is installed in or about a surface mine; and
(b) before a test drill is operated at the surface to prove mineral bearing substances, rock, earth, clay, sand or gravel. O. Reg. 69/23, s. 3.
Read the MINES AND MINING PLANTS on e-Laws ↗
Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.