MINES AND MINING PLANTS, R.R.O. 1990, Reg. 854
Section 248
Cite as MINES AND MINING PLANTS, R.R.O. 1990, Reg. 854, s. 248 · current to November 11, 2026 · consolidated from July 1, 2025 · read from e-Laws on November 16, 2026
The text
(1) A competent person or persons shall be appointed to examine the mechanical parts of a mine hoisting plant in accordance with subsections (2), (2.1) and (2.2). R.R.O. 1990, Reg. 854, s. 248 (1); O. Reg. 68/96, s. 8 (1).
(2) An examination shall be made,
(a) immediately before the hoisting plant is used if it was not examined the previous day, and at least once each day thereafter that it is in use,
(i) of the exterior of each hoisting and tail rope to detect the presence of kinks or other damage and to note the appearance of the rope dressing, and
(ii) of the safety catches and mechanisms of the shaft conveyance for any defects;
(b) Revoked: O. Reg. 68/96, s. 8 (2).
(c) if the hoist is being used, at least once every month of,
(i) the shaft ropes to determine,
(A) the amount of wear, distortion and corrosion,
(B) the need for lubrication,
(C) the need for changing the wear patterns,
(ii) the hoisting ropes for the number and location of broken wires, and
(iii) the friction treads of a friction hoist;
(d) at least once every six months of service of,
(i) the hoisting rope of a drum hoist at the drum spout and at the attachments to the drum, and
(ii) the hoisting rope of a friction hoist within attachments at the shaft conveyance or counterweight in accordance with an established procedure; and
(e) at least once every twelve months of,
(i) bolt locking devices, foundation bolts and all bolts critical to hoist safety, and
(ii) the bails, suspension gear and structure of the shaft conveyance and counterweight. R.R.O. 1990, Reg. 854, s. 248 (2); O. Reg. 68/96, s. 8 (2); O. Reg. 272/97, s. 44 (1); O. Reg. 486/99, s. 15 (1); O. Reg. 296/11, s. 19 (1); O. Reg. 69/23, s. 32 (1).
(2.0.1) If any of the equipment described in clause (2) (c) was not examined in accordance with that clause during the month before the hoist is to be used, the examination shall be done immediately before the hoist is to be used. O. Reg. 486/99, s. 15 (2); O. Reg. 34/14, s. 17.
(2.1) The following parts shall be examined at least once a week when they are in use:
1. Any conveyance safety mechanisms for proper adjustment and freedom of movement.
2. Any head, deflection or idler sheaves, their shafting and bearer and sole plates.
3. The attachments of each shaft rope.
4. The attachments on any shaft conveyance or counterweight.
5. Any shaft conveyance, counterweight and work platform.
6. The hoist parts, brakes, clutch, brake-clutch interlocks and depth indicators.
7. Any hoisting equipment being used for shaft sinking.
8. Any auxiliary brake operating weights, to assure their freedom of movement and holding capacity. O. Reg. 68/96, s. 8 (3); O. Reg. 236/99, s. 10 (1).
(2.2) If the parts listed in subsection (2.1) were not examined during the week before they are to be used, the examination shall be done immediately before they are used. O. Reg. 68/96, s. 8 (3).
(2.3) An examination of the clutch and brake-clutch interlocks under subsection (2.1) shall include an operational check to ensure their performance. O. Reg. 236/99, s. 10 (2).
(3) At least once every three months, the safety catches and mechanisms of the cage or other shaft conveyance shall be tested and such tests shall consist of releasing the empty conveyance suddenly in some suitable manner from rest, so that the safety catches and mechanisms have the opportunity to grip the guides and, where the safety catches and mechanisms do not act satisfactorily, the cage or other shaft conveyance shall not be used for lowering or raising workers until the safety catches and mechanisms have been repaired and tested and shown to act satisfactorily. O. Reg. 69/23, s. 32 (2).
(4) Hoisting ropes in use on a drum hoist shall be cleaned when necessary and shall be dressed with lubricant at least once each month so as to maintain a good coating and a record of the cleaning and dressing shall be entered in the Hoisting Machinery Record Book and the entry shall be dated and signed by the supervisor in charge of the work. R.R.O. 1990, Reg. 854, s. 248 (4).
(5) Revoked: O. Reg. 779/94, s. 11.
(6) The portion of the hoisting rope and tail rope that is within a wedge attachment of a friction hoist shall be examined at least once after every 18 months of service and shall be cut off when an examination reveals that,
(a) there are one or more broken wires;
(b) there is advanced corrosion;
(c) there is excessive pitting; or
(d) there is excessive deformation of one or more wires. O. Reg. 296/11, s. 19 (2).
(6.1) The portion of the hoisting rope and tail rope that is within a socket attachment of a friction hoist shall be cut off,
(a) after 24 months of service, in the case of tail rope within a resin socket attachment;
(b) after 18 months of service, in all other cases. O. Reg. 296/11, s. 19 (2).
(7) An examination shall be made using the appropriate non-destructive test or tests to determine that the following parts are in sound condition before the parts are first used and at a regular frequency at least equal to that recommended by a person certified in accordance with section 1.1 or by an engineer:
1. The mine hoist shafting, brake pins and linkages.
2. Structural parts, attachment pins and draw bars of a shaft conveyance and counterweight. O. Reg. 187/19, s. 18; O. Reg. 373/22, s. 20.
(7.1) Revoked: O. Reg. 187/19, s. 18.
(8) Drawings of the parts to be examined under subsection (7) shall be made available, upon request, to the person performing the examination. R.R.O. 1990, Reg. 854, s. 248 (8).
(9) A record of the examinations required by this section and any servicing and repairs shall be entered in the Hoisting Machinery Record Book and the entries in the Record Book shall be dated and signed by the person performing the examination, servicing or repairs. R.R.O. 1990, Reg. 854, s. 248 (9).
(10) A record of a failure or accident involving a mechanical part of a mine hoisting plant shall be made in the Hoisting Machinery Record Book by the supervisor in charge of the mechanical hoisting equipment. R.R.O. 1990, Reg. 854, s. 248 (10); O. Reg. 167/16, s. 14.
(11) The supervisor in charge of the mechanical parts of the mine hoisting plant shall countersign each entry made in the Hoisting Machinery Record Book with respect to examinations made under subsection (7). R.R.O. 1990, Reg. 854, s. 248 (11).
(12) The supervisor in charge of the mine hoisting plant shall,
(a) review the entries made in the Hoisting Machinery Record Book within one week after each entry is made;
(b) ascertain that the examinations required by this section have been made and all necessary work done; and
(c) upon completion of the review required by clause (a), certify in the Hoisting Machinery Record Book that he or she has complied with clauses (a) and (b). R.R.O. 1990, Reg. 854, s. 248 (12); O. Reg. 68/96, s. 8 (4).
Read the MINES AND MINING PLANTS on e-Laws ↗
Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.