GENERAL — WASTE MANAGEMENT, R.R.O. 1990, Reg. 347

Schedule 9

Cite as GENERAL — WASTE MANAGEMENT, R.R.O. 1990, Reg. 347, Schedule 9 · current to November 11, 2026 · consolidated from September 1, 2026 · read from e-Laws on November 16, 2026

The text

Schedule 9 TEST METHOD FOR THE DETERMINATION OF “LIQUID WASTE” (SLUMP TEST)* (1) Sampling Obtain a representative sample of the waste to be tested. (2) Equipment 2.1 Mould — the representative waste sample shall be formed in a mould, in the form of the frustum of a cone with the base 200 mm in diameter, the top 100 mm in diameter, and the height 300 mm. The base and the top shall be open and parallel to each other and at right angles to the axis of the cone. The mould shall be made of a metal that is chemically resistant to the wastes to be tested and that has a thickness that is at least 1.5 mm. It shall be provided with foot pieces and handles as shown in Figure 1. 2.2 Tamping Rod — the rod shall be round, straight and steel with a diameter of 16 mm and a length of 600 mm. One end shall be rounded to a hemispherical tip with a diameter of 16 mm. (3) Procedure 3.1 Dampen the mould and place it on a flat, moist, non-absorbent (rigid) surface. Hold the mould firmly in place during filling by standing on the two foot pieces. From the sample of the material obtained, immediately fill the mould in three layers, each approximately one-third the volume of the mould. Notes: 1) The test must be carried out at a temperature of not less than 10°C. 2) One-third of the volume of the slump mould fills it to a depth of 70 mm. Two-thirds of the volume fills it to a depth of 160 mm. 3.2 Rod each layer with 25 strokes of the tamping rod. Uniformly distribute the strokes over the cross-section of each layer. For the bottom layer this will necessitate inclining the rod slightly and making approximately half of the strokes near the perimeter, and then progressing with vertical strokes spirally toward the center. Rod layers throughout their depth. For the second layer and the top layer, the strokes must just penetrate into the underlying layers. 3.3 When filling and rodding the top layer, heap the material above the mould before rodding is started. If the rodding operation results in subsidence of the material below the top edge of the mould, add additional material to maintain an excess of material above the top of the mould. After the top layer has been rodded, the excess material shall be screeded off to the level of the top of the mould. Remove the spilled material from the base of the mould. 3.4 Withdraw the mould immediately from the material by raising it carefully in a vertical direction. The operation of raising the mould shall be performed in approximately 5 seconds by a steady upward lift with no lateral or torsional motion. The entire operation from the start of the filling through removal of the mould shall be carried out without interruption and shall be completed within 2 minutes. 3.5 Determine the slump immediately after by measuring the difference between the height of the mould and the average height of the top surface of the material after subsidence. Notes: 1) Waste samples that break or slump laterally give incorrect results. When this condition occurs, the test shall be repeated with a new sample. 2) If two consecutive tests on a sample of material show a falling away or shearing off of a portion of the material from the mass of the specimen, the material probably lacks necessary plasticity and cohesiveness for the slump test to be applicable. 3) Duplicate tests on two different portions of the sample should not vary more than 10 mm. (4) Report 4.1 Record the slump in millimeters to the nearest 10 mm of subsidence of the sample during the test. * The method is based on the Canadian Standards Association test method for determining the slump of concrete (A23.2-5C)
Read the GENERAL — WASTE MANAGEMENT on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.