restricted areas — County of Ontario (now The Regional Municipality of durham), Township of pickering (now the City of pickering), O. Reg. 102/72
Section 96
Cite as restricted areas — County of Ontario (now The Regional Municipality of durham), Township of pickering (now the City of pickering), O. Reg. 102/72, s. 96 · current to November 11, 2026 · consolidated from January 8, 2026 · read from e-Laws on November 16, 2026
The text
(1) Despite section 5, a storage barn and three car garage may be erected, located and used on the lands described in subsection (5), if the following requirements are met:
Minimum lot frontage | 144 metres
Minimum lot area | 4 hectares
Minimum front yard | 15 metres
Minimum rear yard | 15 metres
Minimum side yard | 6 metres
Minimum floor area | 139 square metres
(2) Despite paragraph 3 of section 6.1, no accessory building or structure shall be less than 1.0 metre from any lot line. O. Reg. 361/96, s. 1.
(3) Despite paragraph 4 of section 6.1, no accessory building or structure shall exceed a height of 9.63 metres. O. Reg. 361/96, s. 1.
(4) Despite paragraph 5 of section 6.1, the total area covered by all accessory buildings and structures, excluding the garage, shall not exceed 5 per cent of the area of the lot upon which they are constructed. O. Reg. 361/96, s. 1.
(5) Subsections (1), (2), (3) and (4) apply to that parcel of land in the Town of Pickering in The Regional Municipality of Durham, being part of Lot 3 in Concession VII, described as follows:
In the Town of Pickering, in The Regional Municipality of Durham (formerly known as the Township of Pickering in the County of Ontario) and Province of Ontario containing by admeasurement an area of 27.350 acres be the same more or less and being composed of part of Lot 3, in Concession 7 of the said Town, the limits of which said parcel of land may be more particularly described as follows:
Premising that the westerly limit of the said Lot 3 has a bearing of north 18 degrees 19 minutes 00 seconds west in accordance with a plan of survey prepared by G.T. Horton, O.L.S. and relating all bearings herein thereto.
Commencing at a survey monument at the southwest angle of Lot 3 in Concession 7;
Thence north 18 degrees 19 minutes 00 seconds west, along the westerly limit of the said Lot 3 a distance of 1,841.95 feet to a survey monument at its intersection with a line of a rail fence running in an easterly direction;
Thence north 71 degrees 53 minutes 00 seconds east along the last mentioned rail fence 661.80 feet to a survey monument at its intersection with the existing limit between the east and west halves of Lot 3;
Thence south 18 degrees 19 minutes 50 seconds east along the last mentioned limit 1,842.21 feet to a survey monument in the southerly limit of the said Lot 3;
Thence south 71 degrees 55 minutes 00 seconds west along the said southerly limit of Lot 3, 90.87 feet to a survey monument at its intersection with a post and wire fence running in a northwesterly direction;
Thence north 17 degrees 41 minutes 00 seconds west along the last mentioned post and wire fence 150.00 feet to a survey monument;
Thence south 71 degrees 55 minutes 00 seconds west, 187.67 feet to a survey monument;
Thence south 17 degrees 41 minutes 00 seconds east, 150.00 feet to a survey monument in the southerly limit of the said Lot 3;
Thence south 71 degrees 55 minutes 00 seconds west along the said southerly limit of Lot 3, a distance of 383.57 feet to the point of commencement.
As previously described in Instrument No. 253868.
Read the restricted areas — County of Ontario (now The Regional Municipality of durham), Township of pickering (now the City of pickering) on e-Laws ↗
Made under Planning Act, R.S.O. 1990, c. P.13.