GENERAL MATTERS UNDER THE AUTHORITY OF THE MINISTER, O. Reg. 12/26
Section 43
Well bore surveys
Cite as GENERAL MATTERS UNDER THE AUTHORITY OF THE MINISTER, O. Reg. 12/26, s. 43 · current to November 11, 2026 · consolidated from February 1, 2026 · read from e-Laws on November 16, 2026
The text
(1) If a permit authorizes the drilling of a well, the permit holder shall ensure that deviation and directional surveys are conducted during drilling on all new deviated, horizontal and lateral wells.
(2) The surveys under subsection (1) must,
(a) be conducted at deviation test intervals not exceeding 30 metres from the surface casing flange top to the total depth of the well during drilling; and
(b) be accurate to plus or minus 1 per cent of the well depth.
(3) Within 60 days after a well described in subsection (1) has been drilled and completed in accordance with the approved plans, the permit holder shall submit to the Ministry the results of the survey completed in accordance with that subsection with respect to the well, which must include an indication of the bottomhole location of the well bore and a final cross-section plan and plan view of the well bore, as described in clause 11 (5) (a), and the actual survey data.
Read the GENERAL MATTERS UNDER THE AUTHORITY OF THE MINISTER on e-Laws ↗
Made under Geologic Carbon Storage Act, 2025, S.O. 2025, c. 17, Sched. 2.