GENERAL MATTERS UNDER THE AUTHORITY OF THE MINISTER, O. Reg. 12/26
Section 1
Interpretation
Cite as GENERAL MATTERS UNDER THE AUTHORITY OF THE MINISTER, O. Reg. 12/26, s. 1 · current to November 11, 2026 · consolidated from February 1, 2026 · read from e-Laws on November 16, 2026
The text
(1) In this Regulation,
“approved plan” means any plan with which the permit holder is required to comply under the terms and conditions of their permit; (“plan approuvé”)
“carbon storage protection area” means, with respect to a carbon storage site, the area identified as such on a map attached to the permit issued with respect to the carbon storage site; (“zone de protection du stockage de carbone”)
“CSA TS-226” means the most recent version of CSA TS-226 published by the CSA Group and entitled “Geological storage of carbon dioxide — Measurement, monitoring, and verification plans”; (“norme CSA TS-226”)
“CSA Z741” means the most recent version of CSA Z741 published by the CSA Group and entitled “Geological storage of carbon dioxide”; (“norme CSA Z741”)
“licence” means a research and evaluation licence or a storage licence; (“licence”)
“Ministry” means the Ministry of the Minister; (“ministère”)
“permit” means a research and evaluation permit or a storage permit; (“permis”)
“project” means a project involving the performance of research and evaluation activities or carbon storage activities, or both, for the purposes of a carbon storage site; (“travaux”)
“protected groundwater” means groundwater that,
(a) may discharge to surface water bodies, or
(b) is used or could reasonably be used for water supply purposes, including for drinking water or for an agricultural, commercial or industrial purpose; (“eaux souterraines protégées”)
“Provincial Standards” means the most recent version of the standards published by the Ministry entitled “Oil, Gas and Salt Resources of Ontario, Provincial Operating Standards” and available on a website of the Government of Ontario; (“normes provinciales”)
“unacceptable risk” means an unacceptable risk to public safety, the environment, or other land and resource uses. (“risque inacceptable”)
(2) Any reference in this Regulation to the construction or drilling of a well also includes reference to the deepening and sidetracking of a well.
(3) For the purposes of this Regulation, CSA Z741 shall be read as if the term “protected groundwater” were defined in the standard in the same way as the term is defined in subsection (1).
Read the GENERAL MATTERS UNDER THE AUTHORITY OF THE MINISTER on e-Laws ↗
Made under Geologic Carbon Storage Act, 2025, S.O. 2025, c. 17, Sched. 2.