CORE EDUCATION FUNDING — LEGISLATIVE GRANTS FOR THE 2025-2026 SCHOOL BOARD FISCAL YEAR, O. Reg. 190/25

Section 141

Base school renewal component

Cite as CORE EDUCATION FUNDING — LEGISLATIVE GRANTS FOR THE 2025-2026 SCHOOL BOARD FISCAL YEAR, O. Reg. 190/25, s. 141 · current to November 11, 2026 · consolidated from August 31, 2026 · read from e-Laws on November 16, 2026

The text

The base school renewal component is determined as follows: 1. Take the geographic adjustment factor specified for the board in Table 38. 2. Take the percentage of the total elementary school area that relates to buildings that are less than 20 years old, as specified for the board in Column 2 of Table 39. 3. Apply the percentage referred to in paragraph 2 to the benchmark renewal cost per metre squared of $7.89. 4. Take the percentage of the total elementary school area that relates to buildings that are 20 years old or older, as specified for the board in Column 3 of Table 39. 5. Apply the percentage referred to in paragraph 4 to the benchmark renewal cost per metre squared of $11.83. 6. Add the amounts obtained under paragraphs 3 and 5 to obtain a weighted average benchmark elementary school renewal cost per metre squared. 7. Determine the adjusted elementary school area requirement for the board in metres squared by applying, to the amount determined under paragraph 2 of section 132, the supplementary elementary school area factor specified for the board in Column 2 of Table 35. 8. Multiply the amount obtained under paragraph 6 by the amount determined under paragraph 7. 9. Take the percentage of the total secondary school area that relates to buildings that are less than 20 years old, as specified for the board in Column 4 of Table 39. 10. Apply the percentage referred to in paragraph 9 to the benchmark renewal cost per metre squared of $7.89. 11. Take the percentage of the total secondary school area that relates to buildings that are 20 years old or older, as specified for the board in Column 5 of Table 39. 12. Apply the percentage referred to in paragraph 11 to the benchmark renewal cost per metre squared of $11.83. 13. Add the amounts obtained under paragraphs 10 and 12 to obtain a weighted average benchmark secondary school renewal cost per metre squared. 14. Determine the adjusted secondary school area requirement for the board in metres squared by applying, to the amount determined under paragraph 12 of section 132, the supplementary secondary school and continuing education area factor specified for the board in Column 3 of Table 35. 15. Multiply the amount obtained under paragraph 13 by the amount obtained under paragraph 14. 16. Multiply the amount obtained under paragraph 13 by the adjusted continuing education and other programs area requirement for the board determined under paragraph 10 of section 132. 17. Total the amounts determined under paragraphs 8, 15 and 16. 18. Multiply the sum determined under paragraph 17 by the geographic adjustment factor taken under paragraph 1.
Read the CORE EDUCATION FUNDING — LEGISLATIVE GRANTS FOR THE 2025-2026 SCHOOL BOARD FISCAL YEAR on e-Laws ↗

Made under Education Act, R.S.O. 1990, c. E.2.