REGISTRATIONS UNDER PART II.2 OF THE ACT — STORM WATER MANAGEMENT WORKS, O. Reg. 137/25

Section 17

Spill contingency plan

Cite as REGISTRATIONS UNDER PART II.2 OF THE ACT — STORM WATER MANAGEMENT WORKS, O. Reg. 137/25, s. 17 · current to November 11, 2026 · consolidated from September 1, 2026 · read from e-Laws on November 16, 2026

The text

(1) For the purposes of clause 20.21 (1) (c) of the Act, a person who engages in an activity prescribed by section 2 of this Regulation in respect of a storm water management works, other than a storm water management works addressed by a spill contingency plan under subsection 12 (3), shall ensure that a spill contingency plan is prepared and maintained in accordance with this section if, (a) at the property on which the works is or is proposed to be located, there is outdoor storage or handling of soil, raw material, intermediate products, finished products or by-products; or (b) any of the activities engaged in or proposed to be engaged in that are prescribed by section 2 is a significant drinking water threat. O. Reg. 137/25, s. 17 (1); O. Reg. 234/26, s. 13 (1). (2) A spill contingency plan shall contain, at a minimum, the following procedures respecting spills of pollutants that may occur at the property on which the works is or is proposed to be located resulting in pollutants potentially entering the works or discharging from the works into the natural environment: 1. Procedures to prevent or reduce the risk of the spills. 2. Procedures to prevent, eliminate or ameliorate any adverse effects that result or may result from the spills. 3. Procedures that require the provision of annual spill response training to persons who operate the works. O. Reg. 137/25, s. 17 (2). (3) A person engaging in the activity prescribed by section 2 in respect of the storm water management works that is required to ensure the preparation of a spill contingency plan under subsection (1) shall ensure that, (a) an inventory of response and clean-up equipment, including a description of the location of the equipment and any dates of maintenance or replacement of the equipment, is available to any person engaging in the activity at the works; and (b) the spill contingency plan is implemented, including in the event of a spill of pollutants at the property on which the works is located resulting in pollutants entering the works or discharging from the works into the natural environment. O. Reg. 234/26, s. 13 (2). (4) Revoked: O. Reg. 234/26, s. 13 (2).
Read the REGISTRATIONS UNDER PART II.2 OF THE ACT — STORM WATER MANAGEMENT WORKS on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.