AIR POLLUTION — DISCHARGE OF BENZENE FROM INEOS STYROLUTION, O. Reg. 206/24
Schedule 1
Cite as AIR POLLUTION — DISCHARGE OF BENZENE FROM INEOS STYROLUTION, O. Reg. 206/24, Schedule 1 · current to November 11, 2026 · consolidated from August 29, 2024 · read from e-Laws on November 16, 2026
The text
Schedule 1 Information in monitoring plan
General
1. A description of the INEOS Styrolution facility, including the location and height of each source of benzene at the facility.
2. A description of the area surrounding the INEOS site.
3. The methodology that will be used to collect meteorological data and post it on a publicly accessible website.
4. The following implementation dates:
i. The date by which the fenceline monitoring system will begin operating.
ii. The date by which the open path monitoring system will begin operating.
iii. The date by which the leak detection monitoring system will begin operating.
iv. The date by which the back-up measurement methods will be available to be used, which shall not be later than the date set out under subparagraph i.
v. The date by which the plan will be fully implemented, which shall not be later than the latest date set out under subparagraphs i to iv.
Fenceline Monitoring System
5. A map showing the number and locations of analyzers and air samplers in the fenceline monitoring system.
6. A description of the locations and nature of the sources of benzene at the INEOS Styrolution facility and the local meteorological conditions at the facility.
7. An explanation of how, having regard to the information mentioned in paragraph 6, the configuration mentioned in paragraph 5 will accurately measure the concentration of BTEX and styrene at a sufficient number of points of impingement at or near the property boundary of the INEOS site to reflect the discharges of benzene from the INEOS Styrolution facility.
8. For each monitor in the fenceline monitoring system,
i. an indication of whether it is a fixed-point monitor or a multi-point monitor,
ii. a description of the monitor, including its make and model number,
iii. if the monitor is a multi-point monitor, a description of each analyzer and each air sampler, including its make and model number,
iv. an indication of whether the monitor uses gas chromatography or mass spectroscopy,
v. an indication of how often an analyzer will determine the concentration of BTEX and styrene in the air at each air sampler, and
vi. the sampling and analytical protocols to be used with the monitor.
Open Path Monitoring System
9. A map showing the number of detectors, the location of each detector and the paths of gas detection in the open path monitoring system.
10. An explanation of how, having regard to the information mentioned in paragraph 6, the configuration mentioned in paragraph 9 will accurately measure the concentration of BTEX and styrene along the southern property boundary of the Styrene II site to reflect the discharges of benzene from the Styrene II facility.
11. For each detector in the open path monitoring system,
i. a description of the detector, including its make and model number,
ii. confirmation that the detector uses ultraviolet differential optical absorption spectroscopy technology,
iii. an indication of how often the detector will determine the concentration of BTEX and styrene in the air, and
iv. the sampling and analytical protocols to be used with the detector.
Leak Detection Monitoring System
12. A map showing the number, locations and elevations of analyzers, air samplers and sensors in the leak detection monitoring system.
13. A list of the components at the INEOS Styrolution facility that are required to be recorded under subsection 38 (1) of the Petrochemical Industry Standard and, for each component, the information required under subsection 38 (3) of the Petrochemical Industry Standard.
14. The location and elevation of each component mentioned in paragraph 13.
15. A list of which components mentioned in paragraph 13 are specified to be assessed by the leak detection monitoring system and, for any component that is not specified, the rationale for not specifying the component.
16. An explanation of how, having regard to the information mentioned in paragraph 6, the configuration mentioned in paragraph 12 will accurately measure the concentration of the selected contaminant mentioned in paragraph 18 in the air to identify gaseous leaks from specified components.
17. For the leak detection monitoring system,
i. a description of each analyzer, air sampler and sensor, including its make and model number,
ii. an indication of whether the system uses gas chromatography, mass spectroscopy or, if the system uses a different technology, an indication of that technology and evidence that it has been approved for use by the United States Environmental Protection Agency in respect of leak detection,
iii. an indication of how often the system will determine the concentration of the selected contaminant in the air at each air sampler or sensor in the system,
iv. the sampling and analytical protocols to be used with the system, and
v. procedures for assessing whether the system is failing to identify leaking components.
18. The contaminant selected for leak detection purposes, the concentration or other level of the selected contaminant in the air that, if exceeded, indicates that a component may be leaking and a rationale for selecting the contaminant and the concentration or other level.
19. If the leak detection monitoring system measures a concentration or other level that exceeds the concentration or other level specified under paragraph 18,
i. the steps that will be taken to identify which particular component is leaking,
ii. if no component is leaking, the steps that will be taken to determine the source of the leak, such as a ruptured pipe, or if there is no leak, the steps that will be taken to determine the source of the discharge,
iii. the steps that will be taken to repair the leak, or, if it is unsafe to repair the leak or if the component or other source is inaccessible, steps that will be taken to reduce the leak,
iv. who is responsible for taking each step,
v. the equipment to be used in each step,
vi. when each step is to be completed, and
vii. the records to be made in respect of the steps taken.
Back-up Measurement Methods
20. A map showing the number and locations of the air samplers that will be used if one or more of the monitors in the fenceline monitoring system fails to accurately measure the concentration of benzene in the air for a period of 24 hours or more.
21. A description of the steps that will be taken to ensure the continuity of benzene measurements if one or more of the monitors in the fenceline monitoring system fails to accurately measure the concentration of benzene in the air for a period of 24 hours or more.
22. Having regard to the information mentioned in paragraph 6, an explanation of how, during any period when a monitor in the fenceline monitoring system fails to accurately measure the concentration of benzene in the air for a period of 24 hours or more, the configuration mentioned in paragraph 20 will accurately measure the concentration of benzene or, if applicable, BTEX and styrene, in the air at the location of the failed fenceline monitor.
23. For each back-up measurement method,
i. a description of the method,
ii. if the method uses a monitor, a description of the monitor, including its make and model number,
iii. confirmation that the method is capable of accurately measuring the concentration of benzene in the air over a period of 24 hours or shorter, and
iv. the sampling and analytical protocols to be used with the method.
Data Quality, Management and Reporting
24. Specifications, including method detection levels, for the fenceline monitoring system, open path monitoring system, leak detection monitoring system and back-up measurement methods that demonstrate that measurements will be taken in a representative and reliable manner.
25. A description of the calibration and maintenance procedures for the fenceline monitoring system, the open path monitoring system, the leak detection monitoring system and, as applicable, the back-up measurement methods.
26. An indication of how and with what frequency the performance of the fenceline monitoring system, the open path monitoring system and the leak detection monitoring system will be evaluated and a description of any quality control processes to be used in respect of those systems or back-up measurement methods.
27. An explanation of how the measurements taken by the fenceline monitoring system, the open path monitoring system, the leak detection monitoring system and the back-up measurement methods will be stored in a data storage and management system that is integrated into the facility’s operations, and, as applicable, information with respect to how the measurements will be transmitted, analyzed and posted on a publicly accessible website.
28. A description of the process for validating the measurements taken by the fenceline monitoring system, the open path monitoring system, the leak detection monitoring system and the back-up measurement methods, including how often measurements will be validated and, if applicable, how invalid measurements will be highlighted on a publicly accessible website.
29. An explanation of the calculations that will be performed using the measurements taken by the fenceline monitoring system, the open path monitoring system and the back-up measurement methods to determine the concentration of BTEX and styrene averaged over one-hour, 24-hour and 365-day periods.
30. An indication of how frequently the calculations mentioned in paragraph 29 will be performed and how soon after each calculation is performed the resulting concentration will be posted on a publicly accessible website in order to ensure the public is made aware of the concentration in a timely manner.
31. A description of the publicly accessible website to be used to post information that is required to be posted under this Regulation, including,
i. a list of the information to be made available on the website,
ii. an illustration of the format in which the information will appear on the website, and
iii. a draft design of the website, including a draft sitemap.
Read the AIR POLLUTION — DISCHARGE OF BENZENE FROM INEOS STYROLUTION on e-Laws ↗
Made under Environmental Protection Act, R.S.O. 1990, c. E.19.