AIR POLLUTION — DISCHARGE OF BENZENE FROM INEOS STYROLUTION, O. Reg. 206/24
Section 5
Monitoring plan, contents
Cite as AIR POLLUTION — DISCHARGE OF BENZENE FROM INEOS STYROLUTION, O. Reg. 206/24, s. 5 · current to November 11, 2026 · consolidated from August 29, 2024 · read from e-Laws on November 16, 2026
The text
(1) No later than 12 months after the day this section comes into force, the owner and operator of the INEOS Styrolution facility shall submit a plan to the Director that contains the following requirements:
1. A requirement to install and operate a fenceline monitoring system that,
i. is comprised of fixed-point monitors, multi-point monitors or a combination of both types of monitors,
ii. uses gas chromatography or mass spectroscopy to measure the concentration of BTEX and styrene in the air, and
iii. takes measurements of BTEX and styrene in the air at least every 10 minutes at each air sampler in the system.
2. A requirement to install and operate an open path monitoring system that is comprised of open path gas detectors that use ultraviolet differential optical absorption spectroscopy technology to measure the concentration of BTEX and styrene in the air at least every 10 minutes at each detector in the system.
3. A requirement to install a leak detection monitoring system that,
i. is comprised of one or more multi-point monitors that uses gas chromatography or mass spectroscopy to measure the concentration of a selected contaminant in the air at least every 10 minutes at each air sampler in the system, or
ii. uses leak detection technology approved for use by the United States Environmental Protection Agency.
4. A requirement to operate the leak detection monitoring system to identify gaseous leaks from specified components and, if identified, repair or reduce the leaks.
5. A requirement to have one or more back-up measurement methods that are capable of accurately measuring the concentration of benzene in the air at least every 24 hours.
6. During any period when a monitor mentioned in paragraph 1 fails to accurately measure the concentration of benzene in the air for 24 hours or more,
i. a requirement to use a back-up measurement method at the location of the monitor during the period to measure the concentration of benzene in the air at least every 24 hours, and
ii. if the back-up measurement method is capable of measuring the concentration of toluene, ethylbenzene, xylene or styrene, a requirement to use a back-up measurement method at the location of the monitor during the period to measure the concentration of the measurable parameters at least every 24 hours.
7. A requirement to transmit, analyze and store the measurements taken by the monitoring systems mentioned in paragraphs 1, 2 and 3 in a data storage and management system that is integrated into the facility’s operations.
8. A requirement to store the measurements taken by the back-up measurement methods in accordance with paragraph 6 in the data storage and management system mentioned in paragraph 7.
9. A requirement to perform the following calculations at the following frequencies using measurements taken by the monitoring systems mentioned in paragraphs 1 and 2 and, as applicable, using measurements taken by the back-up measurement methods in accordance with paragraph 6:
i. At least once every hour, calculations to determine the concentration of BTEX and styrene averaged over the previous one-hour period.
ii. At least once every hour, calculations to determine the concentration of BTEX and styrene averaged over the previous 24-hour period.
iii. At least once every day, calculations to determine the concentration of BTEX and styrene averaged over the previous 365-day averaging period.
10. A requirement to post the following information in respect of the calculations mentioned in paragraph 9 on a publicly accessible website within 30 minutes after the end of the period over which the calculated concentration is averaged or within such shorter time period as will ensure the public is made aware of the concentration in a timely manner:
i. The result of the calculation.
ii. The location of the measurements underlying the calculation.
iii. The date and time that the averaging period for the calculation began and ended.
11. A requirement to validate the measurements taken by the monitoring systems mentioned in paragraphs 1, 2 and 3 and measurements taken by the back-up measurement methods in accordance with paragraph 6.
12. A requirement to calibrate and maintain the monitoring systems mentioned in paragraphs 1, 2 and 3 and, as applicable, the back-up measurement methods mentioned in paragraph 5.
13. A requirement to periodically evaluate the performance of the monitoring systems mentioned in paragraphs 1, 2 and 3.
14. A requirement to collect meteorological data that is representative of the meteorological conditions at the INEOS Styrolution facility, including wind direction and wind speed, at least every hour and to store the meteorological data in the data storage and management system mentioned in paragraph 7.
(2) No later than six months after the day this section comes into force, the owner and operator of the INEOS Styrolution facility shall submit a draft plan to the Director that contains,
(a) the requirements mentioned in paragraphs 2, 7, 9 to 14 of subsection (1) as the requirements relate to the open path monitoring system; and
(b) the information set out in paragraphs 1 to 4, 6, 9 to 11, and 24 to 31 of Schedule 1 as the information relates to the open path monitoring system.
Read the AIR POLLUTION — DISCHARGE OF BENZENE FROM INEOS STYROLUTION on e-Laws ↗
Made under Environmental Protection Act, R.S.O. 1990, c. E.19.