GENERAL AND TRANSITIONAL MATTERS, O. Reg. 53/24

Section 4

Preparation of environmental assessment, contents

Cite as GENERAL AND TRANSITIONAL MATTERS, O. Reg. 53/24, s. 4 · current to November 11, 2026 · consolidated from July 28, 2026 · read from e-Laws on November 16, 2026

The text

(1) An environmental assessment prepared for a Part II.3 project must consist of, in addition to the information required under subsection 17.6 (2) of the Act, (a) a brief summary of the environmental assessment organized in accordance with the matters set out in subsection 17.6 (2) of the Act; (b) a list of studies and reports which are under the control of the proponent and which were done in connection with the Part II.3 project or matters related to the project; (c) a list of studies and reports done in connection with the Part II.3 project or matters related to the project of which the proponent is aware and that are not under the control of the proponent; and (d) if the environmental assessment is for a Part II.3 project with a fixed location, at least two well-marked, legible and reproducible maps showing the location of the project and the area to be affected by it. (2) Of the maps referred to in clause (1) (d), one shall be a simplified base map suitable for reproduction in any notices that may be published and the other may include more detail such as a 1:10,000 scale Ontario Base Map. (3) The maps referred to in clause (1) (d) may show alternative proposals.
Read the GENERAL AND TRANSITIONAL MATTERS on e-Laws ↗

Made under Environmental Assessment Act, R.S.O. 1990, c. E.18.