PART II.3 PROJECTS - DESIGNATIONS AND EXEMPTIONS, O. Reg. 50/24

Section 6

Interpretation

Cite as PART II.3 PROJECTS - DESIGNATIONS AND EXEMPTIONS, O. Reg. 50/24, s. 6 · current to November 11, 2026 · consolidated from November 3, 2026 · read from e-Laws on November 16, 2026

The text

(1) In this Part, “biogas” means gas collected from the decomposition of organic materials in sewage sludge; (“biogaz) “Environmental Screening Process for Electricity Projects” means Part B of the Ministry publication entitled “Guide to Environmental Assessment Requirements for Electricity Projects” dated January 2011, as amended from time to time, and available on a website of the Government of Ontario; (“processus d’examen environnemental pour les projets de production d’électricité”) “significant modification” means a change described in subsection (3); (“modification importante”) “waste biomass” means agricultural waste, sewage, woodwaste and gases generated from the decomposition of organic materials, but does not include biogas or landfill gas. (“biomasse résiduelle”) (2) In this Part, a reference to municipal waste is a reference to municipal waste that does not include waste biomass. (3) Each of the following changes constitutes a significant modification: 1. With respect to a generation facility that does not use coal, hazardous waste, liquid industrial waste, municipal waste or oil as a power source, a change that would result in the facility using coal, hazardous waste, liquid industrial waste, municipal waste or oil as a power source. 2. With respect to a generation facility that uses coal as its primary power source, a change that would increase the name plate capacity of the facility. 3. With respect to a generation facility that uses oil as its primary power source, a change that would increase the name plate capacity of the facility by one megawatt or more. 4. With respect to a generation facility that uses hazardous waste, liquid industrial waste, municipal waste or wind energy as its primary power source, a change that would increase the name plate capacity of the facility by two megawatts or more. 5. With respect to a generation facility that uses biomass or natural gas as its primary power source, a change that would increase the name plate capacity of the facility by five megawatts or more. 6. With respect to a generation facility that uses waste biomass as its primary power source, a change that would increase the name plate capacity of the facility by 10 megawatts or more. 7. With respect to a generation facility that uses biogas or landfill gas as its primary power source, a change that would increase the name plate capacity of the facility by 25 megawatts or more. 8. With respect to a generation facility that uses municipal waste as its primary power source, a change that would, i. increase the name plate capacity of the facility, and ii. increase the capacity of the facility to burn municipal waste by five tonnes or more on any day. 9. With respect to a generation facility that uses water power as its primary power source, a change that would increase the name plate capacity of the facility by greater than or equal to 25 per cent. 10. With respect to a transmission line that has a nominal operating voltage of greater than or equal to 115 kilovolts, a change in the line that would include one or more of the following if, after the change in the line, the line would have a nominal operating voltage of greater than or equal to 115 kilovolts: i. The replacement of a pole or tower. ii. A change in a right of way for the line. 11. With respect to a transmission station, a change in the station that would include the installation of additional transmission equipment, if, i. the installation of the additional equipment requires an extension of the site where the station is located, and ii. after the installation of the additional equipment, the station would have a nominal operating voltage of greater than or equal to 115 kilovolts. 12. With respect to a transmission station that has a nominal operating voltage of less than or equal to 230 kilovolts, a change in the station that would include the installation of additional transmission equipment, if the installation of the additional equipment would increase the nominal operating voltage to be greater than 230 kilovolts. (4) For the purposes of subsection 3 (3) of the Act, activities that are ancillary to a project described in sections 7, 8, 9 or 10 include the following activities: 1. Establishing or changing a transmission line or transmission station as part of establishing a generation facility. 2. Establishing or changing a transmission line or transmission station as part of changing a generation facility.
Read the PART II.3 PROJECTS - DESIGNATIONS AND EXEMPTIONS on e-Laws ↗

Made under Environmental Assessment Act, R.S.O. 1990, c. E.18.