PART II.3 PROJECTS - DESIGNATIONS AND EXEMPTIONS, O. Reg. 50/24

Section 29

Establishing — waterfront projects

Cite as PART II.3 PROJECTS - DESIGNATIONS AND EXEMPTIONS, O. Reg. 50/24, s. 29 · current to November 11, 2026 · consolidated from November 3, 2026 · read from e-Laws on November 16, 2026

The text

(1) A project designated as a Part II.3 project under section 26 is exempt from Part II.3 of the Act, if, (a) before the Part II.3 transition date, a process of public consultation was commenced in respect of the project in accordance with an approved class environmental assessment; (b) construction of any of the works that are part of the project commenced before the Part II.3 transition date and, when the construction of the works commenced, the Act did not apply in respect of the project; or (c) before March 10, 2023, an application under the Planning Act was made in respect of the any works that are part of the project. (2) For greater certainty, a reference to a project in clause (1) (a) is a reference to a project that was an undertaking or a part of an undertaking before the Part II.3 transition date. (3) The exemption in clause (1) (b) ceases to apply on the fifth anniversary of the Part II.3 transition date unless the construction of the thing is substantially completed before that date. Part VI Drinking Water Projects Interpretation 30. In this Part, “comparator rated capacity” means, in respect of a drinking water treatment plant, the greater of, (a) the lowest rated capacity of the plant during the previous 10-year period, and (b) the rated capacity of the plant used for the purposes of an environmental assessment most recently completed in respect of the plant; (“capacité nominale de comparaison”) “rated capacity” means, in respect of a drinking water system or drinking water treatment plant, (a) the rated capacity set out in the approval, permit or licence issued under the Safe Drinking Water Act, 2002 in respect of the system or plant, or (b) if the permit or licence issued under the Safe Drinking Water Act, 2002 in respect of the system or plant does not set out a rated capacity, the rated capacity set out in the plans or specification submitted in the application in respect of the permit or licence; (“capacité nominale”) “subject drinking water system” means a drinking water system for which, (a) a permit under the Safe Drinking Water Act, 2002 is required to establish the system, and (b) a licence under the Safe Drinking Water Act, 2002 is required to use or operate the system; (“réseau d’eau potable concerné”) “surface water” means water in lakes, ponds, rivers or other bodies of water or watercourses. (“eaux de surface”) O. Reg. 257/26, s. 4. Part II.4 drinking water projects 31. (1) The following activities are designated as a project to which Part II.4 of the Act applies, if the activity is carried out by a municipality or a water and wastewater public corporation: 1. Establishing a subject drinking water system that has a rated capacity of greater than 100,000 litres per day. 2. Making a change to a drinking water system described in paragraph 1, if making the change would result in the system using a surface water source that is not currently being used by the system. 3. Establishing a drinking water treatment plant that has a rated capacity of greater than 100,000 litres per day and is part of a subject drinking water system. 4. Making a change to a drinking water treatment plant described in paragraph 3, if making the change would result in, i. the rated capacity of the plant increasing by at least 50 per cent of the comparator rated capacity, or ii. the rated capacity of the plant being at least 2,275,000 litres per day more than the comparator rated capacity. 5. Making a change to a drinking water treatment plant that is part of a subject drinking water system if, i. the plant has a rated capacity of less than or equal to 100,000 litres per day, and ii. making the change would result in the plant having a rated capacity of greater than 100,000 litres per day. 6. Establishing infrastructure for the purpose of artificially recharging an aquifer from a surface water source for the purposes of using the aquifer as a source of drinking water. O. Reg. 257/26, s. 4. (2) An activity described in paragraph 1 or 3 of subsection (1) is designated as a project to which Part II.4 of the Act applies, if the activity is carried out by a private sector developer. O. Reg. 257/26, s. 4. (3) For the purposes of paragraph 1 of subsection (1), constructing only part of a drinking water system, for example a distribution system, is not establishing a drinking water system. O. Reg. 257/26, s. 4. (4) A change to a drinking water treatment plant that involves only improvements to the operations of the plant or improvements to the maintenance activities carried out at the plant is not a change for the purposes of paragraphs 4 and 5 of subsection (1). O. Reg. 257/26, s. 4. (5) In this section, “aquifer” has the same meaning as in Regulation 903 of the Revised Regulations of Ontario, 1990 (Wells) made under the Ontario Water Resources Act. O. Reg. 257/26, s. 4. Part II.4 drinking water projects, archaeological focus 32. (1) The following activities are designated as projects to which Part II.4 of the Act applies, if section 31 does not apply in respect of the activity and the activity is carried out by a municipality or a water and wastewater public corporation: 1. Establishing a subject drinking water system that has a rated capacity of less than or equal to 100,000 litres per day. 2. Making a change to a subject drinking water system if, i. making the change would result in the system using a surface water source that is not currently being used by the system, or ii. the change involves adding or changing an intake pipe for an existing surface water source. 3. Establishing a drinking water treatment plant that has a rated capacity of less than or equal to 100,000 litres per day and is part of a subject drinking water system. 4. Making a change to a drinking water treatment plant that is part of a subject drinking water system, if making the change would, i. increase the rated capacity of the plant and making the change involves construction outside of an existing building or structure, ii. involve acquiring additional land for the plant, or iii. require making new sewer connections or establishing a new works for disposal of process wastewater from the plant. 5. Establishing a distribution system if, i. a permit under the Safe Drinking Water Act, 2002 is required to establish the system, and ii. a licence under the Safe Drinking Water Act, 2002 is required to use or operate the system. 6. Making a change to a distribution system referred to in paragraph 5 by, i. extending the distribution system, ii. establishing a drinking water pumping station, or iii. establishing a drinking water storage facility. 7. Making a change to a drinking water pumping station that is part of a distribution system referred to in paragraph 5, if making the change involves the construction of a new building or structure. 8. Making a change to a drinking water storage facility that is part of a distribution system referred to in paragraph 5, if making the change would involve acquiring additional land for the facility. 9. Establishing a well to supply water to a subject drinking water system. O. Reg. 257/26, s. 4. (2) An activity described in paragraph 1, 2, or 3 or subparagraph 4 i of subsection (1) is designated as a project to which Part II.4 of the Act applies, if the activity is carried out by a private sector developer. O. Reg. 257/26, s. 4. (3) Paragraph 5 and subparagraph 6 i of subsection (1) do not apply in respect of, (a) establishing or extending a distribution system, if the establishment or extension is required as a condition of approval under the Planning Act for a site plan, consent, plan of subdivision or plan of condominium; or (b) establishing temporary overland water supplies. O. Reg. 257/26, s. 4. (4) A project designated under paragraph 5 or subparagraph 6 i of subsection (1) does not include any part of the distribution system that is being established in a previously disturbed portion of an existing road allowance or utility corridor. O. Reg. 257/26, s. 4.
Read the PART II.3 PROJECTS - DESIGNATIONS AND EXEMPTIONS on e-Laws ↗

Made under Environmental Assessment Act, R.S.O. 1990, c. E.18.