REHABILITATION OF LANDS, O. Reg. 35/24

Section 25

Reporting requirements

Cite as REHABILITATION OF LANDS, O. Reg. 35/24, s. 25 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026

The text

(1) The proponent of the project to which a filed closure plan relates shall prepare and maintain each year, (a) surface site plans required in the closure plan; (b) plans on a horizontal plane, with separate drawings for each mining level, showing all underground workings, including shafts, tunnels, dams and bulkheads; and (c) plans on a vertical plane of all mine sections at suitable intervals and azimuths, showing all shafts, tunnels, drifts, stopes and other mine workings in relation to the surface, including the location of the top of the bedrock and the surface of any known body of water. (2) Copies of the plans must be prepared to a legible scale and be digitized or microfilmed or made suitable for digitization or microfilming. (3) The proponent shall, (a) promptly submit copies of the plans to the Minister on request; and (b) make copies of the plans available for inspection at the project site or another mutually agreed on location in Ontario. (4) If the project is placed in a state of inactivity or is closed out, the proponent shall promptly revise the plans to the date of inactivity or close out and submit them to the appropriate office of the Resident Geologist of the Ministry.
Read the REHABILITATION OF LANDS on e-Laws ↗

Made under Mining Act, R.S.O. 1990, c. M.14.