(1) A person holding a special project designation shall, before engaging in any activity on or in a well that is part of the project, submit to the Ministry, (a) an application for each licence under subsection 10 (1) of the Act that the person requires to drill, operate, deepen, alter or enter any wells, or to engage in any other activity on or in any wells, that will be used in association with the project; and (b) an application for one or more permits under section 11 of the Act that the person requires to inject a substance into an underground geological formation through the wells referred to in clause (a). O. Reg. 425/23, s. 10 (1). (2) The holder of a licence related to a special project may, at any time in the course of carrying on the project, submit to the Ministry, (a) an application for a licence under subsection 10 (1) of the Act that the person requires to drill, operate, deepen, alter or enter one or more additional wells, or to engage in any other activity on or in one or more additional wells, that will be used in association with the project; and (b) an application for one or more permits under section 11 of the Act that the person requires to inject a substance into an underground geological formation through one or more of the additional wells referred to in clause (a) of this subsection. O. Reg. 425/23, s. 10 (2); O. Reg. 126/24, s. 3 (1). (3) An application for a licence or permit for a special project must be consistent with, (a) the information submitted to the Ministry in support of the request to designate the project as a special project; (b) the special project designation, including any term under subsection 11.1 (2) or (3) of the Act and any exemption under section 11.4 of the Act; and (c) any custom application plan approved by the Minister for the special project at the time the special project was designated. O. Reg. 425/23, s. 10 (3). (4) An application for a licence or permit submitted under subsection (1) or (2) shall be accompanied by, (a) if the applicant is a corporation, confirmation that the corporation profile report submitted as a part of the request for a special project designation is still current, or if any of the information has changed since the designation was made, a current corporation profile report that includes, (i) the current status of the corporation, (ii) the corporation’s legal name, corporation number and registered address, and (iii) a list of the names of the corporation’s current officers and directors; (b) confirmation from the applicant that all surface and subsurface rights needed to carry out the special project have been acquired by the applicant, whether through ownership or lease, for all lands within the project area or, if the special project is for temporary or permanent storage, the proposed surface area; (c) confirmation from the applicant that all persons from whom rights or interests have been acquired for the special project have been made aware of the proposed project and the applications being made for the project; and (d) a report that is prepared by an independent party with expertise in insurance matters related to environmental and other risks associated with subsurface geological exploration, development and storage operations in Ontario and that, (i) recommends the types and amount of insurance coverage necessary for the proposed special project, including but not limited to liability and pollution coverage, and (ii) identifies the information that was relied on to develop the recommendation described in subclause (i). O. Reg. 425/23, s. 10 (4); O. Reg. 126/24, s. 3 (2). (5) An application for a licence or permit submitted under subsection (1) or (2) shall contain the following information: 1. The applicant’s name and contact information. 2. A description of the special project that includes the information required under subsection (6). 3. Plans, technical reports, analyses and other documentation relating to the special project that demonstrate the following: i. All works have been designed with consideration of the expected operating conditions including temperatures, pressures and fluid compositions. ii. The suitability of the proposed special project with respect to the site-specific surface conditions and the site-specific subsurface conditions. iii. Suitable integrity testing and preventative maintenance programs and procedures for any wells, caverns, reservoirs or other associated works will be established and followed throughout the life of the project. iv. Remedial actions or measures will be taken to address any existing wells and other drilled or dug conduits, that may impact, or be impacted by, the special project, whether those wells or conduits are known prior to the commencement of the project or are identified in the future. v. The special project will be designed, constructed, operated, maintained, decommissioned and abandoned in a manner that, A. permanently isolates and protects all potable water formations from potential contamination, B. protects existing and potential hydrocarbon-bearing formations from cross-contamination, C. prevents the migration of fluids between permeable zones, D. promotes, where applicable, the conservation and efficient recovery of hydrocarbons with minimal use of flaring, E. ensures containment of fluids after plugging, abandonment and decommissioning, F. ensures that the plugging, abandonment and decommissioning of wells, caverns, reservoirs and other associated works will leave them in a stable state that permanently protects the public and the environment, G. ensures all necessary measures are taken to ensure public safety and protection of the environment, and H. if the special project is a carbon storage special project, is in accordance with the CSA Z741 Standard. O. Reg. 425/23, s. 10 (5). (6) An application for a licence or permit submitted under subsection (1) or (2) shall include a description of the special project that includes the following information: 1. An overview of the special project and its purpose. 2. A description of the location of the special project, including any local and upper-tier municipality and geographic township in which the lands where the surface and subsurface would be used in the special project are located, the lot and concession numbers and any applicable civic addresses. 3. A description of the special project, including the wells, caverns, reservoirs and other associated works and activities that are the subject of the licence or permit application. 4. A description of any other federal, provincial and municipal approvals that will be required for the special project. 5. A list of all documents and information that are being submitted in support of the application and, for each document listed, i. the title of the document, ii. its general subject matter, iii. the date the document was prepared, and iv. the author’s name and qualifications. 6. One or more maps showing the following: i. The general location of the lands that are subject to the application. ii. The project area and, if applicable, proposed surface area of the special project. iii. The project assessment area for the special project. iv. The locations of all existing and proposed wells, caverns, reservoirs and other associated works that will be used for the special project, and the setback distances between the wells and other works, on the one hand, and the project area or, where applicable, the proposed surface area, on the other hand. v. Existing surface uses, significant natural and human-made features, populated areas and relevant land uses that have the potential to impact or to be impacted by the special project and are located within the project assessment area for the project, as well as any other significant surface uses or features identified in the applicant’s plans, technical reports, analyses and other documentation submitted as part of the application. vi. Existing subsurface uses that have the potential to impact or to be impacted by the special project, including, A. existing wells or abandoned wells located within the project assessment area for the project, B. currently or previously active subsurface operations located within the project assessment area for the project, and C. any other subsurface activity identified in the applicant’s plans, technical reports, analyses and other documentation submitted as part of the application. vii. A North arrow. viii. A scale. ix. A legend. O. Reg. 425/23, s. 10 (6); O. Reg. 126/24, s. 3 (3). (7) Subject to any requirements in a custom application plan approved by the Minister at the time the special project was designated under section 11.1 of the Act, an application for a licence or permit submitted under subsection (1) or (2) of this section shall include plans that address the full lifecycle of the special project, including the design, construction, operation, maintenance, monitoring, plugging, abandonment, decommissioning and safety of the wells, caverns, reservoirs and other associated works used during the lifecycle of the project. O. Reg. 425/23, s. 10 (7). (8) For greater clarity, the plans referred to in subsection (7) shall include plans for emergency management and response and plans for spill response. O. Reg. 425/23, s. 10 (8). (9) The plans referred to in subsection (7) shall include well location plans that meet all the requirements described in Part I of the Provincial Standards for Oil Gas and Salt Resources. O. Reg. 425/23, s. 10 (9). (10) For the purposes of determining the amount of security to be provided under section 24, the plans relating to plugging, abandonment, decommissioning and site rehabilitation referred to in subsection (7) of this section shall include a detailed schedule for these activities and an estimate made by the applicant of the costs of carrying out these activities, including an itemized list of the costs of, (a) plugging, abandonment and decommissioning of all wells, caverns, reservoirs and other associated works that are part of the special project; (b) carrying out all necessary site rehabilitation work; and (c) any ongoing maintenance or monitoring work that is required after plugging, abandonment, decommissioning and site rehabilitation have been completed. O. Reg. 425/23, s. 10 (10). (11) All plans referred to in subsection (7) shall, (a) identify any standards or specifications that will be used or relied on during all stages of the special project; (b) identify all materials that will be used in the design or construction of wells; (c) describe any proposed departures from the Provincial Standards for Oil, Gas and Salt Resources or the CSA Z741 Standard with which the operator of the special project is required to comply under sections 20 and 21, along with, (i) the rationale for the proposed departure, (ii) written certification from a qualified person that, (A) it is reasonable to depart from the standard or standards in the circumstances, and (B) measures to prevent or limit damage that provide an equal or higher standard of protection are being proposed, and (iii) the name and qualifications of the qualified person who certified the proposed departure; and (d) describe any monitoring, recordkeeping, and reporting requirements related to the special project. O. Reg. 425/23, s. 10 (11). (12) The qualified person referred to in subclause (11) (c) (ii) shall hold a licence or temporary licence in good standing under the Professional Engineers Act or possess such other qualifications as may be permitted under the Provincial Standards for Oil Gas and Salt Resources. O. Reg. 425/23, s. 10 (12). (13) Subject to any requirements in a custom application plan approved by the Minister at the time the special project was designated under section 11.1 of the Act, the following technical reports, analyses and other documentation shall be included in an application for a licence or permit submitted under subsection (1) or (2) of this section: 1. An assessment of the potential impacts that the special project may have on surface features, activities and uses that are not part of the project and are located within the project assessment area. 2. An assessment of the potential impacts that the surface features, activities and uses referred to in paragraph 1 may have on the special project. 3. An assessment of the potential impacts that the special project may have on subsurface features, activities and uses that are not part of the project and are located within the project assessment area. 4. An assessment of the potential impacts that any of the subsurface features, activities and uses referred to in paragraph 3 may have on the special project. 5. With respect to all wells or other drilled or dug conduits that may impact the special project, an assessment of their age, history and condition, and any remedial actions or measures needed to confirm that they will not affect the integrity of any wells, caverns or reservoirs used in association with the project. 6. One or more risk assessments that consider the full lifecycle of the special project, including recommendations and plans to be implemented to prevent or mitigate risks. 7. Any additional technical reports, analyses and other documentation required to demonstrate that a carbon storage special project will be designed, constructed, operated, maintained, abandoned and decommissioned in accordance with the CSA Z741 Standard. O. Reg. 425/23, s. 10 (13). (14) The subsurface features, activities and uses referred to in paragraph 3 of subsection (13) include geological features, any storage, mining or other similar operations, plugged or unplugged wells, oil, gas and salt resources, and any geological evaluation wells, geothermal wells and water wells. O. Reg. 425/23, s. 10 (14); O. Reg. 126/24, s. 3 (4). (15) All plans referred to in subsection (7) and technical reports, analyses and other documentation referred to in subsection (13) shall, (a) clearly set out any measures or actions that are to be carried out as part of the special project in order to prevent or mitigate any possible adverse effects that the project may have; (b) identify the individuals who prepared each plan, technical report, analysis or other document, including their qualifications and relevant experience; (c) be signed by the individuals who prepared the plan, technical report, analysis or other document and include, where appropriate, their seal or stamp; and (d) include the date the plan, technical report, analysis or other document was completed. O. Reg. 425/23, s. 10 (15); O. Reg. 126/24, s. 3 (5, 6). (16) Plans, technical reports, analyses and other documentation submitted in support of an application for a licence or permit necessary for a well used in association with a special project may be used in support of another application for a licence or permit for another well used in association with the same special project that is submitted, (a) at the same time as the first-mentioned application is submitted; or (b) after the first-mentioned application is submitted, so long as the information in the plans, technical reports, analyses and other documentation remains accurate and relevant to the application. O. Reg. 425/23, s. 10 (16). (17) In the case of an application for a licence or permit for a special project that is subject to a custom application plan, an application submitted under subsection (1) or (2) shall include any additional plans, technical reports, analyses and other documentation required by the approved custom plan in addition to any requirements set out in subsections (4) to (15). O. Reg. 425/23, s. 10 (17). (18) For greater certainty, an application under this section must be submitted by the person who holds a special project designation. O. Reg. 425/23, s. 10 (18).
Read the SPECIAL PROJECTS on e-Laws ↗

Made under Oil, Gas and Salt Resources Act, R.S.O. 1990, c. P.12.