REGISTRATIONS UNDER PART II.2 OF THE ACT - SMALL SCALE BREWERIES, O. Reg. 102/23

Section 6

Activity requirements

Cite as REGISTRATIONS UNDER PART II.2 OF THE ACT - SMALL SCALE BREWERIES, O. Reg. 102/23, s. 6 · current to November 11, 2026 · consolidated from July 1, 2023 · read from e-Laws on November 16, 2026

The text

For the purposes of clause 20.21 (1) (c) of the Act, a person who engages in an activity prescribed by section 2 of this Regulation shall ensure that the following requirements are complied with: 1. Any structure, equipment, apparatus, mechanism or thing that is used for beer or secondary products production at the small scale brewery facility shall be used, operated and maintained in a manner that satisfies the recommendations of the manufacturers of the structure, equipment, apparatus, mechanism or thing. 2. The following procedures shall be developed and implemented at the small scale brewery facility: i. Procedures to ensure that the best management practices plan required by section 7 is implemented in accordance with its contents. ii. Procedures setting out the frequency of inspections and scheduled preventative maintenance of sources of contaminants at the facility and equipment related to the sources of contaminants. iii. Procedures for recording and responding to complaints that relate to the facility and the natural environment. 3. A dust collector shall be used for any process that includes the milling of grain where the grain is discharged into the air. 4. Heat from the kettles shall be recovered by condensing vapours. 5. Fermentation vessels shall be vented into a water trap. 6. Diesel, waste or spent grain shall not be used as a fuel source for the purposes of beer production, secondary products production or comfort heat. 7. Brewer’s spent grain and waste yeast shall be, i. stored in an enclosed storage vessel and removed from the small scale brewery facility within 14 days of initial storage, or ii. stored in equipment used for the storage of brewer’s spent grain and waste yeast and removed within a time period necessary to prevent the transmission of offensive odours. 8. Use of pneumatic equipment and any truck-related activities, including idling, movements and loading or unloading operations, shall only be engaged in between 7:00 a.m. and 7:00 p.m. 9. The engine and refrigeration units of any delivery or shipping trucks shall be turned off while parked, loading or unloading at the small scale brewery facility. 10. The ventilation and air exhaust equipment used for beer production or secondary products production in the small scale brewery facility must meet the following requirements: i. The static pressure of each fan associated with the equipment, except for the dust collector, must not exceed 38.1 millimetres of water column. ii. The volumetric air flow rate of individual process equipment exhausts must not exceed 11.8 cubic metres per second as specified at a standard temperature of 20 degrees Celsius and pressure of 101.3 kilopascals. 11. Dust collectors shall be located in areas that take advantage of distance and shielding to mitigate noise impacts on points of noise reception. 12. Doors and windows shall remain closed, except for ingress and egress, while production operations are underway. 13. A copy of the best management practices plan referred to in section 7 shall be provided in paper or electronic format for inspection upon request.
Read the REGISTRATIONS UNDER PART II.2 OF THE ACT - SMALL SCALE BREWERIES on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.