BROADER PUBLIC SECTOR: ENERGY REPORTING AND CONSERVATION AND DEMAND MANAGEMENT PLANS, O. Reg. 25/23
Section 7
Summary, prescribed requirements
Cite as BROADER PUBLIC SECTOR: ENERGY REPORTING AND CONSERVATION AND DEMAND MANAGEMENT PLANS, O. Reg. 25/23, s. 7 · current to November 11, 2026 · consolidated from February 23, 2023 · read from e-Laws on November 16, 2026
The text
(1) The summary of annual energy consumption required under paragraph 1 of subsection 25.35.2 (3) of the Act and the summary of annual greenhouse gas emissions required under paragraph 1 of subsection 5 (1) of this Regulation shall be for the year that ends on December 31 immediately preceding the day the summary is required to be submitted.
(2) The summary for a year must include the following information for each of the public agency’s prescribed operations:
1. The name of the building or facility.
2. The address of the building or facility.
3. The total floor area of the indoor space of the building or facility.
4. The type of the building or facility, as set out in a paragraph in Column 2 of Table 1.
5. If the building or facility has more than one use, the type of the building or facility for the purpose of paragraph 4 shall be determined based on the use that occupies the largest amount of total floor area of the indoor space or, if more than one use occupies the same amount of total floor area of the indoor space, based on one of those uses chosen by the public agency.
6. A description of the days and hours in the year during which the building or facility is operated and, if the building or facility is operated on a seasonal basis, the period or periods during the year when it is operated.
7. The total amount of each type of energy that was consumed in the year to operate the building or facility and that was purchased by the public agency, regardless of when it was purchased.
8. The total amount of greenhouse gas emissions that were emitted in the year with respect to each type of energy, calculated from the total amount of each type of energy included under paragraph 7.
(3) The summary for a year must also include the following information, if applicable:
1. If the public agency is a school board whose operation of a school is prescribed,
i. whether the school had classrooms in temporary accommodations and the number of such classrooms, and
ii. whether the school had an indoor swimming pool.
2. If the public agency is a public hospital whose operation of a facility used for hospital purposes is prescribed, whether the facility was operated as a chronic or acute care facility, or both.
3. If the public agency is a municipality or municipal service board whose operation of a building or facility related to the treatment of water or sewage is prescribed,
i. the volumetric flow rate of water treated, if the building or facility treats water, or
ii. the volumetric flow rate of sewage treated, if the building or facility treats sewage.
(4) A public agency may exclude, from the summary, any amount of energy consumed or greenhouse gas emitted related to the temporary use of an emergency or back-up generator to continue the operation of the building or facility.
(5) In this section,
“volumetric flow rate” means a rate that sets out the flow of water or sewage in units of volume over time.
Read the BROADER PUBLIC SECTOR: ENERGY REPORTING AND CONSERVATION AND DEMAND MANAGEMENT PLANS on e-Laws ↗
Made under Electricity Act, 1998, S.O. 1998, c. 15, Sched. A.