BRADFORD BYPASS PROJECT, O. Reg. 697/21
Section 7
Early works Stormwater Management Plan
Cite as BRADFORD BYPASS PROJECT, O. Reg. 697/21, s. 7 · current to November 11, 2026 · consolidated from March 30, 2026 · read from e-Laws on November 16, 2026
The text
(1) The proponent shall prepare a Stormwater Management Plan for the early works in accordance with this section. O. Reg. 697/21, s. 7 (1).
(2) The Stormwater Management Plan shall, at a minimum, include,
(a) plans and descriptions showing the type of stormwater management to be provided for the early works, including the portions not being drained to a stormwater management wet pond;
(b) a description of the receiving water features that would receive stormwater from the early works, including the characteristics, flow and ecological conditions and whether species listed on the Protected Species in Ontario List under the Species Conservation Act, 2025 are known to be present;
(c) an operation and maintenance plan for the proposed stormwater management facilities; and
(d) a monitoring plan to evaluate the performance of stormwater management facilities against the design criteria and objectives and to verify receiving surface waters are protected. O. Reg. 697/21, s. 7 (2); O. Reg. 67/26, s. 2.
(3) The proponent shall develop the Stormwater Management Plan in accordance with,
(a) the proponent’s guidelines; and
(b) the document entitled “Stormwater Management Planning and Design Manual, 2003”, dated March 2003, published by the Ministry and available on a Government of Ontario website. O. Reg. 697/21, s. 7 (3).
(4) The proponent shall submit the Stormwater Management Plan to the following for review and comment:
1. The Ministry of Northern Development, Mines, Natural Resources and Forestry.
2. The Lake Simcoe Region Conservation Authority.
3. Fisheries and Oceans Canada.
4. The Ministry of the Environment, Conservation and Parks. O. Reg. 697/21, s. 7 (4).
(5) The proponent shall consider any comments provided on the Stormwater Management Plan. O. Reg. 697/21, s. 7 (5).
(6) The proponent shall provide the final Stormwater Management Plan to the Director of the Ministry’s Environmental Assessment Branch. O. Reg. 697/21, s. 7 (6).
(7) The proponent shall publish the final Stormwater Management Plan on the Project website. O. Reg. 697/21, s. 7 (7).
Read the BRADFORD BYPASS PROJECT on e-Laws ↗
Made under Environmental Assessment Act, R.S.O. 1990, c. E.18.