NOTICES AND REPORTS UNDER SECTIONS 51 TO 53.1 OF THE ACT — FATALITIES, CRITICAL INJURIES, OCCUPATIONAL ILLNESSES AND OTHER INCIDENTS, O. Reg. 420/21

Section 5

Section 53.1 notices — additional notices

Cite as NOTICES AND REPORTS UNDER SECTIONS 51 TO 53.1 OF THE ACT — FATALITIES, CRITICAL INJURIES, OCCUPATIONAL ILLNESSES AND OTHER INCIDENTS, O. Reg. 420/21, s. 5 · current to November 11, 2026 · consolidated from January 1, 2024 · read from e-Laws on November 16, 2026

The text

(1) A constructor or employer who submits a written report to a Director under subsection 51 (1) of the Act or gives a written notice under section 52 or 53 of the Act shall also supplement the report or notice with an engineer’s written opinion stating the cause of the occurrence if, (a) the incident occurs at a workplace where Ontario Regulation 213/91 (Construction Projects) made under the Act applies and involves a failure of all or part of, (i) temporary or permanent works, (ii) a structure, (iii) a wall of an excavation or of similar earthwork for which an engineer has given written opinion that the stability of the wall is such that no worker will be endangered by it, or (iv) a crane or similar hoisting device; (a.1) the incident occurs at a workplace where Ontario Regulation 213/91 (Construction Projects) made under the Act applies and involves a failure to control a crane or a load, including any rigging failure, except where permitted under section 162 of that Regulation; (b) the incident occurs at a workplace where Ontario Regulation 67/93 (Health Care and Residential Facilities) made under the Act applies and involves the collapse or failure of a temporary or permanent structure that was designed by an engineer or architect; or (c) the incident occurs at a workplace where Regulation 859 of the Revised Regulations of Ontario, 1990 (Window Cleaning) made under the Act applies and involves the collapse or failure of a temporary or permanent support or structure that was designed by an engineer. O. Reg. 420/21, s. 5 (1); O. Reg. 376/22, s. 2 (1); O. Reg. 242/23, s. 2. (2) The engineer’s written opinion shall be provided within 14 days after the occurrence. O. Reg. 420/21, s. 5 (2); O. Reg. 376/22, s. 2 (2).
Read the NOTICES AND REPORTS UNDER SECTIONS 51 TO 53.1 OF THE ACT — FATALITIES, CRITICAL INJURIES, OCCUPATIONAL ILLNESSES AND OTHER INCIDENTS on e-Laws ↗

Made under Occupational Health and Safety Act, R.S.O. 1990, c. O.1.