Building Transit Faster Act, 2020, S.O. 2020, c. 12

Section 12

Need for obstruction removal

Cite as Building Transit Faster Act, 2020, S.O. 2020, c. 12, s. 12 · current to November 11, 2026 · consolidated from November 27, 2025 · read from e-Laws on November 17, 2026

The text

The Minister may determine that the construction, operation or maintenance of a provincial transit project requires the alteration or removal of any of the following things, whether or not they are there in violation of section 3: 1. A structure on or under, i. transit corridor land, or ii. land within 30 metres of transit corridor land. This does not include the removal of a building, road or utility infrastructure, but does include the removal of part of a building. 2. A tree, shrub or hedge on or under, i. transit corridor land, or ii. land within 30 metres of transit corridor land. 3. A prescribed thing.
Read the Building Transit Faster Act, 2020 on e-Laws ↗