(1) The COVID-19 resilience infrastructure stream amount is the total of the amounts determined as follows for the projects set out for the board in Column 3 of the Table to this section:
1. Determine the amount of eligible expenditures for the project that the board incurred during the period beginning on the date specified in Column 4 of the Table to this section and ending on August 31, 2021, as set out in the document entitled “Memorandum 2021 B12: COVID-19 Resilience Infrastructure Stream: Education Related (CVRIS-EDU) Projects - Approvals,” dated May 7, 2021.
2. Take the lesser of the amount determined under paragraph 1 and the amount specified for the project in Column 5 of the Table to this section. O. Reg. 474/21, s. 3.
(2) It is a condition of the payment of a grant to a board under this Regulation that the board comply with the requirements set out in the document entitled “Memorandum 2021 B12: COVID-19 Resilience Infrastructure Stream: Education Related (CVRIS-EDU) Projects - Approvals,” dated May 7, 2021. O. Reg. 474/21, s. 3.
TABLE
Item | Column 1 Name of Board | Column 2 Project Identification Number | Column 3 Project title | Column 4 Project start date | Column 5 COVID-19 resilience infrastructure stream amount, in dollars
1. | Algoma District School Board | N2-4 | Touchless Water Bottle Filling Stations; Handwashing Features | February 18, 2021 | 140,000
2. | Algoma District School Board | N2-3 | Ventilation and/or HVAC Upgrades; Touchless Water Bottle Filling Stations and Flush Valves | February 19, 2021 | 1,055,000
3. | Algoma District School Board | N2-2 | Ventilation Upgrades - Mountain View, Windows | February 18, 2021 | 565,000
4. | Algoma District School Board | N2-1 | Ventilation Upgrades and Childcare Space Retrofits, Windows | February 18, 2021 | 2,675,000
5. | Algonquin and Lakeshore Catholic District School Board | N55-1 | Ductwork and Classroom Unit Ventilation Installation | February 18, 2021 | 950,000
6. | Algonquin and Lakeshore Catholic District School Board | N55-4 | Ductwork Installation; HVAC Installation; Water Bottle Fill Station | February 18, 2021 | 722,500
7. | Algonquin and Lakeshore Catholic District School Board | N55-3 | HVAC/Ductwork/BAS Installation; Automatic Door Operators; Handwashing Stations; Water Bottle Filling Stations | February 19, 2021 | 2,603,000
8. | Algonquin and Lakeshore Catholic District School Board | N55-2 | Installation of Classroom Unit Ventilation | February 18, 2021 | 200,000
9. | Avon Maitland District School Board | N8-3 | HVAC Upgrades (Improve Air Quality); Water Bottle Filling Station; Hands Free Bathroom Fixtures (Sinks) | February 18, 2021 | 1,836,000
10. | Avon Maitland District School Board | N8-4 | HVAC Upgrades (Improve Air Quality); Water Bottle Filling Station; Hands Free Bathroom Fixtures (Sinks) | February 18, 2021 | 1,027,000
11. | Avon Maitland District School Board | N8-1 | Wireless Infrastructure | February 18, 2021 | 109,666
12. | Avon Maitland District School Board | N8-2 | Wireless Infrastructure | February 18, 2021 | 1,843
13. | Bluewater District School Board | N7-3 | HVAC Upgrades (Air Quality Optimization); Touchless Water Bottle Filling Station; Touchless Handwashing Station | February 18, 2021 | 2,449,000
14. | Bluewater District School Board | N7-2 | Network | February 18, 2021 | 28,000
15. | Bluewater District School Board | N7-1 | Network Switches | February 18, 2021 | 917,500
16. | Bluewater District School Board | N7-4 | Touchless Water Bottle Filling Station; Touchless Handwashing Station; Classroom Partitions | February 18, 2021 | 53,000
17. | Brant Haldimand Norfolk Catholic District School Board | N51-1 | HVAC Upgrades (Ventilation); Physically Distant Full-Day Kindergarten Classrooms; Bottle Water Filling Stations; Portable Replacement; Open Concept Schools | February 18, 2021 | 1,600,000
18. | Brant Haldimand Norfolk Catholic District School Board | N51-2 | Wi-Fi Access Points; Touchless Door Handles; Daycare Improvements (Installation/Replacement t of Sinks, Exterior Door, Washrooms, Vestibule) | February 18, 2021 | 436,235
19. | Bruce-Grey Catholic District School Board | N35-1 | Water Bottle Filling Stations; External Wi-Fi Access Points | February 19, 2021 | 305,531.9
20. | Catholic District School Board of Eastern Ontario | N52-2 | HVAC; Other Improvements to Air Quality & Duct Sealing; Water Bottle Filling Station; Fence | February 18, 2021 | 4,328,820
21. | Catholic District School Board of Eastern Ontario | N52-1 | Mechanical Upgrade to RTUs and VAV | February 18, 2021 | 30,000
22. | Catholic District School Board of Eastern Ontario | N52-3 | Water Bottle Filling Station | February 18, 2021 | 3,000
23. | Conseil des écoles publiques de l’Est de l’Ontario | N59-1 | HVAC Upgrades; Water Bottle Filling Stations; Washroom Faucet Replacements | February 18, 2021 | 3,914,000
24. | Conseil des écoles publiques de l’Est de l’Ontario | N59-3-MR | Water Bottle Filling Stations Project Group | March 18, 2021 | 66,000
25. | Conseil des écoles publiques de l’Est de l’Ontario | N59-2 | Water Bottle Filling Stations; Washroom Faucet Replacements | February 18, 2021 | 55,000
26. | Conseil scolaire catholique MonAvenir | N64-1 | Washrooms Renovations; A/C; Automatic Bottle Water Filling Station; Hold Open Fire Doors | February 18, 2021 | 8,782,425
27. | Conseil scolaire catholique Providence | N63-1 | Water Bottle Filling Station; Secured Access | February 18, 2021 | 415,800
28. | Conseil scolaire de district catholique de l’Est ontarien | N65-1 | Retrofits to reconfigure space | February 18, 2021 | 40,000
29. | Conseil scolaire de district catholique de l’Est ontarien | N65-2 | Touchless Water Fountain; Renovations to reconfigure space; Replacement of MERV 13 HVAC Unit; Other Improvements to Air Quality and duct sealing | February 18, 2021 | 4,422,029
30. | Conseil scolaire de district catholique de l’Est ontarien | N65-3 | Touchless Water Fountain; Replacement of MERV 13 HVAC Unit; Other Improvements to Air Quality and duct sealing | February 18, 2021 | 621,777
31. | Conseil scolaire de district catholique des Aurores boréales | N62-1 | Improvements to HVAC Systems; Touchless Faucets | February 18, 2021 | 321,000
32. | Conseil scolaire de district catholique des Aurores boréales | N62-2 | Improvements to HVAC Systems; Touchless Faucets | February 18, 2021 | 53,500
33. | Conseil scolaire de district catholique des Grandes Rivières | N60.1-1 | Boiler Replacement | February 18, 2021 | 800,000
34. | Conseil scolaire de district catholique des Grandes Rivières | N60.1-2 | Boiler Replacement | February 18, 2021 | 750,000
35. | Conseil scolaire de district catholique des Grandes Rivières | N60.1-3 | Water Bottle Filling Station; HVAC System; Windows; Vestibule; Interior/Exterior Doors; Heating, Ventilation, A/C; Washrooms Renovations; Secured Access; Handwashing Stations with Touchless Faucet | February 18, 2021 | 3,129,200
36. | Conseil scolaire de district catholique des Grandes Rivières | N60.1-4 | Water Bottle Filling Station; Window and Siding; Heating, Ventilation, A/C; Secured Access; Handwashing Station | February 18, 2021 | 990,700
37. | Conseil scolaire de district catholique du Centre-Est de l’Ontario | N66-3-MR | Bottle Water Filling Stations Project Group | March 18, 2021 | 4,000
38. | Conseil scolaire de district catholique du Centre-Est de l’Ontario | N66-2 | Bottle Water Filling Stations; Ventilation Improvements Group | February 18, 2021 | 120,000
39. | Conseil scolaire de district catholique du Centre-Est de l’Ontario | N66-1 | Ventilation Improvement | February 18, 2021 | 8,800,000
40. | Conseil scolaire de district catholique du Nouvel-Ontario | N61-3 | Bottle Water Filling Station; Improving Child Care Entrance | February 19, 2021 | 185,000
41. | Conseil scolaire de district catholique du Nouvel-Ontario | N61-4 | Drinking Water Bottle Filling Station | February 18, 2021 | 51,000
42. | Conseil scolaire de district catholique du Nouvel-Ontario | N61-1 | Optimizing Air Quality | February 18, 2021 | 595,000
43. | Conseil scolaire de district catholique du Nouvel-Ontario | N61-2 | Optimizing Air Quality | February 18, 2021 | 560,000
44. | Conseil scolaire de district catholique Franco-Nord | N60.2-1 | Touchless Plumbing & Child Care Main Entrance Projects | February 18, 2021 | 27,000
45. | Conseil scolaire de district catholique Franco-Nord | N60.2-2 | Window Replacement & Installation of Mechanical Ventilation | February 18, 2021 | 1,850,000
46. | Conseil scolaire de district du Nord-Est de l’Ontario | N56-1 | HVAC; Installation of Touchless Faucets | February 18, 2021 | 475,000
47. | Conseil scolaire de district du Nord-Est de l’Ontario | N56-2 | Modernizing HVAC Control System | February 18, 2021 | 75,000
48. | Conseil scolaire de district du Nord-Est de l’Ontario | N56-4 | Replacement of a Drinking Water Fountain with a H2O Station | February 18, 2021 | 5,000
49. | Conseil scolaire de district du Nord-Est de l’Ontario | N56-3 | Washroom Renovation; HVAC; H2O/Drinking Station | February 18, 2021 | 200,500
50. | Conseil scolaire public du Grand Nord de l’Ontario | N57-1 | Ventilation; Reducing Points of Contact | February 18, 2021 | 1,685,000
51. | Conseil scolaire public du Grand Nord de l’Ontario | N57-2 | Ventilation; Reducing Points of Contact | February 19, 2021 | 925,000
52. | Conseil scolaire Viamonde | N58-3 | Bottle Water Filling Station | February 18, 2021 | 39,000
53. | Conseil scolaire Viamonde | N58-1 | HVAC Upgrades | February 19, 2021 | 8,905,000
54. | Conseil scolaire Viamonde | N58-2 | Window Replacement; HVAC | February 18, 2021 | 2,080,000
55. | District School Board of Niagara | N22-2 | Automatic Door Openers; Door Hold Open Devices; Water Bottle Filling Stations | February 18, 2021 | 3,252,225
56. | District School Board of Niagara | N22-1 | HVAC Upgrades; Handwashing and Washroom Improvements; Online Learning Support; New Portables; Building Ventilation Controls - Optimizing Air Quality; Creating New Classroom Spaces | February 18, 2021 | 9,789,000
57. | District School Board Ontario North East | N1-3 | In-duct Air Purification System and/or HVAC Upgrade; Water Bottle Filling Stations; Handwashing Stations | February 18, 2021 | 1,923,172
58. | District School Board Ontario North East | N1-1 | Ventilation Upgrades | February 18, 2021 | 2,870,000
59. | District School Board Ontario North East | N1-4 | Ventilation Upgrades; Water Bottle Filling Stations; Entrance Vestibules, Washrooms | February 18, 2021 | 816,453
60. | District School Board Ontario North East | N1-2 | Ventilation Upgrades; Window Replacement | February 18, 2021 | 2,040,000
61. | Dufferin-Peel Catholic District School Board | N43-1 | Air Handling Replacement Project Group 1 | February 18, 2021 | 9,820,000
62. | Dufferin-Peel Catholic District School Board | N43-2 | Air Handling Replacement; Water Bottle Filling Stations; Exhaust Fan and Boiler Replacement | February 18, 2021 | 5,710,000
63. | Dufferin-Peel Catholic District School Board | N43-3 | Security Access (Video Entry System); Wi-Fi Access Points and Network Infrastructure; Portable Replacement; Handwashing Stations; FDK (exterior access, outdoor playground) | February 18, 2021 | 9,076,595
64. | Durham Catholic District School Board | N45-2 | Gym Partitions; Accessible Door Operators; Expand Shared Kindergarten and Childcare Outdoor Space | February 18, 2021 | 390,000
65. | Durham Catholic District School Board | N45-1 | Wi-Fi Access Points; Window replacement; HVAC Upgrades; Water Bottle Filling Stations; Sink Replacements | February 18, 2021 | 7,052,675
66. | Durham District School Board | N13-3 | Outdoor Classrooms; Replacement of Portable Classrooms | February 18, 2021 | 4,750,000
67. | Durham District School Board | N13-2 | Ventilation Upgrades; Window Replacements; Exterior Door Fobs Access; Water Bottle Filling and Hand Sanitizing Stations; Childcare Vestibules; Plexiglass Partitions; Fencing | February 18, 2021 | 9,522,700
68. | Durham District School Board | N13-1 | Wireless Infrastructure Upgrade Project Group – Wi-Fi Access Points | February 18, 2021 | 3,317,660
69. | Grand Erie District School Board | N23-2 | Enclosing Open Concept Classrooms; HVAC; Water Bottle Filling Station; Hallway Door Hold Open Devices; Entrance Door Security Access | February 18, 2021 | 8,869,500
70. | Grand Erie District School Board | N23-1 | Portable Replacement | February 18, 2021 | 1,200,000
71. | Greater Essex County District School Board | N9-2 | HVAC upgrades (Mechanical Ventilation) | February 18, 2021 | 8,898,313
72. | Greater Essex County District School Board | N9-1 | Ventilation Renewal Project; Create Cooling Centre | February 18, 2021 | 2,960,917
73. | Greater Essex County District School Board | N9-3 | Water Bottle Filling Stations | February 18, 2021 | 8,453
74. | Greater Essex County District School Board | N9-4 | Wi-Fi Access Points; Hold Open Door Installations; Upgrades to Child Care Spaces; Water Bottle Filling Stations | February 18, 2021 | 3,695,275
75. | Halton Catholic District School Board | N46-2 | Child Care Centre Improvements | February 18, 2021 | 14,000
76. | Halton Catholic District School Board | N46-1 | HVAC Improvements; Window Replacements; Water Bottle Filling Stations; Washroom Upgrades; Power Door Operators; Entrance Door Security; Child Care Centre Improvements; Wi-Fi Access Points and Network Infrastructure | February 18, 2021 | 6,778,719
77. | Halton District School Board | N20-3 | Outdoor Seating/Learning Spaces; Childcare Retrofits | February 18, 2021 | 3,489,688
78. | Halton District School Board | N20-1 | Portable Classroom Ventilation Improvements; HVAC Improvements; Window Replacement | February 18, 2021 | 7,125,000
79. | Halton District School Board | N20-2 | Replacement of Access Points; Open Concept Schools; Building Automation Systems and Control Upgrades; Child Care Retrofits and Outdoor Spaces | February 18, 2021 | 8,794,194
80. | Hamilton-Wentworth Catholic District School Board | N47-2 | HVAC Upgrades; Water Bottle Filling Stations; Partition Classroom Spaces; Automatic Door Opener Installations; Playground Improvements; Entrance Partitions | February 18, 2021 | 4,514,400
81. | Hamilton-Wentworth Catholic District School Board | N47-1 | Replacement Unit Ventilators; Installation of Wi-Fi Access Points; Rooftop HVAC Unit Replacements; Provide Operable Windows; Install Building Automation Systems; Energy Recovery Ventilator Replacements | February 18, 2021 | 6,070,100
82. | Hamilton-Wentworth District School Board | N21-2 | HVAC Upgrades (Ventilation) | February 18, 2021 | 7,775,000
83. | Hamilton-Wentworth District School Board | N21-1 | HVAC Upgrades (Ventilation); Water Bottle Filling Stations; Infrared Water Faucets; Touchless Door Operators | February 18, 2021 | 9,445,500
84. | Hastings and Prince Edward District School Board | N29-1 | HVAC Upgrades | February 18, 2021 | 3,225,000
85. | Hastings and Prince Edward District School Board | N29-2 | HVAC Upgrades and Window Replacement | February 18, 2021 | 1,850,000
86. | Hastings and Prince Edward District School Board | N29-3 | Windows; Handwashing Stations | February 18, 2021 | 850,000
87. | Huron-Perth Catholic District School Board | N36-1 | HVAC Upgrades; Window Replacements | February 19, 2021 | 550,000
88. | Huron-Perth Catholic District School Board | N36-3 | Water Bottle Filling Stations | February 19, 2021 | 10,000
89. | Huron-Perth Catholic District School Board | N36-2 | Water Bottle Filling Stations; HVAC Installation for Cooling | February 19, 2021 | 1,140,000
90. | Huron-Superior Catholic District School Board | N31-1 | Optimizing Air Quality; Promoting Occupant Health and Safety | February 18, 2021 | 2,040,000
91. | Huron-Superior Catholic District School Board | N31-2 | Optimizing Air Quality; Promoting Occupant Health and Safety | February 18, 2021 | 640,000
92. | Kawartha Pine Ridge District School Board | N14-2 | HVAC Upgrades; Hands Free Bottle Filling Project Group | February 18, 2021 | 750,000
93. | Kawartha Pine Ridge District School Board | N14-1 | Optimize Air Quality Project Group; Hands Free Bottle Filling Project Group | February 18, 2021 | 9,400,000
94. | Kawartha Pine Ridge District School Board | N14-3 | Replace Portables Project Group | February 18, 2021 | 600,000
95. | Keewatin-Patricia District School Board | N5.1-4 | Childcare Expansion (Ventilation, Indoor/Outdoor Playground Spaces, Entrances) | February 18, 2021 | 150,000
96. | Keewatin-Patricia District School Board | N5.1-1 | HVAC Upgrade; Plumbing Fixture | February 18, 2021 | 570,000
97. | Keewatin-Patricia District School Board | N5.1-3 | Network Hardware Installation (Wi-Fi Access Points) | February 18, 2021 | 500,000
98. | Keewatin-Patricia District School Board | N5.1-2 | Plumbing Fixture | February 18, 2021 | 32,000
99. | Kenora Catholic District School Board | N33.2-1 | Handwashing Stations; Water Bottle Filling Stations; Touchless Paper Towel Dispensers; Improved Ventilation; HVAC Control System Upgrades | February 18, 2021 | 128,600
100. | Kenora Catholic District School Board | N33.2-2 | Water Bottle Filling Stations; Touchless Paper Towel Dispensers | February 19, 2021 | 8,540
101. | Lakehead District School Board | N6.1-1 | Replace Existing Drinking Fountains with Water Bottle Filling Stations; Retrofitting Open Concept Areas; HVAC Upgrades | February 18, 2021 | 1,465,000
102. | Lakehead District School Board | N6.1-2 | Replace Existing Drinking Fountains with Water Bottle Filling Stations; Retrofitting Open Concept Areas | February 18, 2021 | 410,000
103. | Lambton Kent District School Board | N10-3 | HVAC Upgrades and/or Window Replacements | February 18, 2021 | 2,900,000
104. | Lambton Kent District School Board | N10-4 | HVAC Upgrades and/or Window Replacements | February 18, 2021 | 545,000
105. | Lambton Kent District School Board | N10-2 | Water Bottle Filling Station Project Group; Wi-Fi Infrastructure Retrofits | February 18, 2021 | 142,404
106. | Lambton Kent District School Board | N10-1 | Wi-Fi Infrastructure Retrofit; Window Replacements; Water Bottle Filling Stations; Cooling Centres | February 18, 2021 | 2,700,781
107. | Limestone District School Board | N27-3 | Camera and Other Security Systems; Touchless Door Features; Portable Replacements; HVAC Upgrades; Wiring for Portables | February 18, 2021 | 3,331,500
108. | Limestone District School Board | N27-2 | HVAC Replacement | February 18, 2021 | 500,000
109. | Limestone District School Board | N27-1 | HVAC Upgrade and Replacement | February 18, 2021 | 1,030,000
110. | Limestone District School Board | N27-4 | Security Camera Supporting Physical Distancing and Mask Compliance; HVAC Upgrades | February 18, 2021 | 300,000
111. | London District Catholic School Board | N38-1 | HVAC/Ventilation Project; Windows Project Group; Daycare Retrofit Group | February 18, 2021 | 6,455,500
112. | Near North District School Board | N4-1 | Optimizing Air Quality in Schools | February 18, 2021 | 2,162,000
113. | Near North District School Board | N4-2 | Optimizing Air Quality in Schools | February 18, 2021 | 4,061,200
114. | Niagara Catholic District School Board | N50-1 | Building Automation Systems; Window Replacements; HVAC Upgrades | February 18, 2021 | 7,089,000
115. | Nipissing-Parry Sound Catholic District School Board | N30.2-1 | HVAC Upgrades and Water Bottle Filling Stations | February 19, 2021 | 4,583,000
116. | Northeastern Catholic District School Board | N30.1-3 | ERV Installation in Classrooms and BAS System | February 18, 2021 | 1,137,000
117. | Northeastern Catholic District School Board | N30.1-4 | ERV Installations in Classrooms and BAS System | February 18, 2021 | 817,000
118. | Northeastern Catholic District School Board | N30.1-1 | HVAC Upgrades, Water Bottle Filling Stations and Touchless Faucets | February 18, 2021 | 365,000
119. | Northeastern Catholic District School Board | N30.1-2 | Touchless Water Bottle Filling Stations and Touchless Faucets; HVAC Upgrades | February 18, 2021 | 206,000
120. | Northwest Catholic District School Board | N33.1-3 | Air Exchangers in Portables | February 18, 2021 | 20,000
121. | Northwest Catholic District School Board | N33.1-1 | HVAC Upgrades; Water Bottle Water Filling Stations; Touchless Faucets | February 18, 2021 | 112,000
122. | Northwest Catholic District School Board | N33.1-2 | Touchless Faucets Project Group | February 18, 2021 | 34,000
123. | Ottawa-Carleton District School Board | N25-1 | HVAC Unit Upgrade - Portables | February 18, 2021 | 4,095,000
124. | Ottawa-Carleton District School Board | N25-2 | HVAC Upgrades & Window Replacement | February 18, 2021 | 9,385,000
125. | Ottawa-Carleton District School Board | N25-3-MR | HVAC Upgrades and Window Replacements | March 18, 2021 | 3,095,000
126. | Ottawa-Carleton District School Board | N25-4 | Touchless Water Bottle Filling Station; Hold Open Device on Fire Doors; Air Purification System | February 18, 2021 | 7,727,000
127. | Ottawa-Carleton District School Board | N25-5-MR | Touchless Water Bottle Filling Stations; Hold Open Devices on Fire Doors; Air Purification Systems | March 18, 2021 | 1,298,000
128. | Ottawa Catholic District School Board | N53-3-MR | Gym Divider; Water Bottle Filling Stations; Unit Ventilators | March 18, 2021 | 1,155,000
129. | Ottawa Catholic District School Board | N53-2 | Heat Pumps; Water Bottle Filling Stations; HVAC RTUs; Air conditioning | February 18, 2021 | 1,505,000
130. | Ottawa Catholic District School Board | N53-1 | Unit Ventilator | February 18, 2021 | 9,950,000
131. | Ottawa Catholic District School Board | N53-4 | Washrooms Upgrade; Portables | February 18, 2021 | 1,295,000
132. | Peel District School Board | N19-5 | Door Hold-Open Magnets for Clear Hall Passage | February 18, 2021 | 7,369,500
133. | Peel District School Board | N19-1 | HVAC/Other improvements to Air Quality | February 18, 2021 | 9,994,000
134. | Peel District School Board | N19-2 | HVAC/Other improvements to Air Quality | February 18, 2021 | 9,938,000
135. | Peel District School Board | N19-4 | Touch Free Main Entrance Controls | February 18, 2021 | 7,259,900
136. | Peel District School Board | N19-3 | Water Bottle Filling Stations; HVAC/Other Improvements to Air Quality; Bandwidth Upgrades; Upgrade Public Address Systems; Wireless System Improvements | February 18, 2021 | 7,087,900
137. | Peterborough Victoria Northumberland Clarington Catholic District School Board | N41-1 | HVAC and Playground Upgrades; Touchless Handwashing Sinks, Doors and Washrooms; Portable Replacements; Wi-Fi Access Points and Network Infrastructure; Water Bottle Filling Stations; Window Replacements | February 19, 2021 | 8,295,337.8
138. | Peterborough Victoria Northumberland Clarington Catholic District School Board | N41-2 | Wi-Fi Upgrades; Touchless Doors, Sinks and Washrooms; Water Bottle Filling Stations | February 18, 2021 | 61,095.6
139. | Rainbow District School Board | N3-2 | Daycare Kitchen | February 18, 2021 | 200,000
140. | Rainbow District School Board | N3-4 | Ventilation Upgrades; Water Bottle Filling Stations | February 18, 2021 | 3,115,000
141. | Rainbow District School Board | N3-3 | Ventilation Upgrades; Water Bottle Filling Stations; Handwashing Stations | February 18, 2021 | 2,107,500
142. | Rainbow District School Board | N3-1 | Window Replacements | February 18, 2021 | 2,800,000
143. | Rainy River District School Board | N5.2-2 | ERV Ventilation Upgrades | February 18, 2021 | 950,000
144. | Rainy River District School Board | N5.2-1 | ERV Ventilation Upgrades; Windows | February 18, 2021 | 1,100,000
145. | Rainy River District School Board | N5.2-3 | Water Bottle Filling Station | February 18, 2021 | 6,000
146. | Rainy River District School Board | N5.2-4 | Water Bottle Filling Station | February 18, 2021 | 12,000
147. | Renfrew County Catholic District School Board | N54-1 | HVAC | February 18, 2021 | 1,115,000
148. | Renfrew County Catholic District School Board | N54-3 | HVAC Upgrades; Portable Replacement; Installation of Water Bottle Filling Stations | February 18, 2021 | 1,907,000
149. | Renfrew County Catholic District School Board | N54-4 | HVAC Upgrades; Portable Replacements; Install Water Bottle Filling Stations | February 19, 2021 | 1,539,000
150. | Renfrew County Catholic District School Board | N54-2 | Window Replacements | February 18, 2021 | 250,000
151. | Renfrew County District School Board | N28-2 | HVAC System UV Treatment; HVAC Duct Sealing | February 18, 2021 | 1,502,901
152. | Renfrew County District School Board | N28-1 | HVAC System UV Treatment; HVAC Duct Sealing; Ventilation | February 18, 2021 | 3,045,055
153. | Simcoe County District School Board | N17-1 | Installation of Mechanical Ventilation Systems; Ventilation Improvements; Portable Unit Ventilators; Portable Replacements; Portable Refurbishments | February 18, 2021 | 9,990,000
154. | Simcoe County District School Board | N17-2 | Ventilation Improvements; Sanitizing Stations | February 18, 2021 | 3,935,000
155. | Simcoe County District School Board | N17-3 | Water Bottle Filling Stations; Touchless Door Open Devices | February 18, 2021 | 3,310,000
156. | Simcoe Muskoka Catholic District School Board | N44-1 | HVAC Upgrades for Schools and Portables; Purchase of New Portables; Window Replacements | February 26, 2021 | 9,939,706
157. | Simcoe Muskoka Catholic District School Board | N44-2 | Water Bottle Filling Stations | February 18, 2021 | 66,700
158. | St. Clair Catholic District School Board | N39-1 | HVAC Upgrades for Schools and Childcare; Water Bottle Filling Stations; Window Replacements | February 18, 2021 | 3,718,627.7
159. | Sudbury Catholic District School Board | N32-2 | Handwashing Upgrades and Water Bottle Fill Station Installation | February 18, 2021 | 94,000
160. | Sudbury Catholic District School Board | N32-3 | Handwashing Upgrades and Water Bottle Filling Stations | February 18, 2021 | 1,000
161. | Sudbury Catholic District School Board | N32-1 | HVAC Upgrades | February 18, 2021 | 1,555,000
162. | Superior-Greenstone District School Board | N6.2-3 | Handwashing Station & Water Bottle Filling Station; HVAC - Ventilation, Filtration & UV Disinfecting; Safety Retrofits - Isolation Room Ventilation; Window Replacement | February 18, 2021 | 3,292,000
163. | Superior North Catholic District School Board | N34.2-1 | Ventilation System Upgrades; Ultraviolet Germicidal Irradiation Systems; Water Bottle Filling Stations | February 18, 2021 | 1,810,500
164. | Thames Valley District School Board | N11-2 | Secured Access; Wi-Fi Access Point Enhancements (Outdoor); Fixed Water Bottle Filling Stations | February 18, 2021 | 5,846,000
165. | Thames Valley District School Board | N11-3 | Secured Access; Wi-Fi Access Point Enhancements (Outdoor); Fixed Water Bottle Filling Stations | February 18, 2021 | 217,500
166. | Thames Valley District School Board | N11-1 | Wi-Fi Access Point Enhancements (Interior); Building Automation Upgrades; Ventilation Upgrades | February 18, 2021 | 4,210,500
167. | Thunder Bay Catholic District School Board | N34.1-1 | Water Bottle Filling Stations; Handwashing Stations; New Boiler/Heating System | February 19, 2021 | 980,000
168. | Toronto Catholic District School Board | N40-1 | HVAC Replacements and Portable Ventilation Upgrades | February 18, 2021 | 4,809,585
169. | Toronto Catholic District School Board | N40-3 | Outdoor Classrooms/Playgrounds; Wi-Fi Access points and Network Infrastructure; Child Care Space (install separate entrance, upgrades to washrooms and outdoor playground) | February 19, 2021 | 9,295,581.8
170. | Toronto Catholic District School Board | N40-2 | Upgrade Handwashing Equipment; Window Replacements | February 18, 2021 | 6,566,752
171. | Toronto Catholic District School Board | N40-4 | Water Bottle Filling Stations; Cooling Centres; New Mechanical Ventilation Systems | February 18, 2021 | 5,089,500
172. | Toronto District School Board | N12-10 | Classroom Enclosures | February 18, 2021 | 6,457,000
173. | Toronto District School Board | N12-1 | Early Learning Child Care Centres; Kindergarten Outdoor Areas | February 18, 2021 | 955,000
174. | Toronto District School Board | N12-6 | Handwashing Upgrades; Outdoor Learning Features; HVAC Upgrades; New Portables; Water Bottle Filling Stations | February 18, 2021 | 9,440,327
175. | Toronto District School Board | N12-5 | HVAC (BAS) Upgrades | February 18, 2021 | 9,912,508
176. | Toronto District School Board | N12-2 | HVAC Upgrades | February 18, 2021 | 9,900,000
177. | Toronto District School Board | N12-3 | HVAC Upgrades | February 18, 2021 | 9,900,000
178. | Toronto District School Board | N12-4 | HVAC Upgrades (Schools and Portables); Touchless Door Operators | February 18, 2021 | 8,837,000
179. | Toronto District School Board | N12-8 | Hybrid Learning Classroom Implementation Project – Wi-Fi Access Points | February 18, 2021 | 9,495,327
180. | Toronto District School Board | N12-9 | Hybrid Learning Classroom Implementation Project – Wi-Fi Access Points | February 18, 2021 | 6,863,210
181. | Toronto District School Board | N12-7 | Outdoor Playground Upgrades (Armour Stone and Accessible Pathways), Windows | February 18, 2021 | 9,880,000
182. | Trillium Lakelands District School Board | N15-2 | Air Handling Upgrades; Ventilation Systems and Cooling Centres | February 18, 2021 | 75,000
183. | Trillium Lakelands District School Board | N15-1 | Air Handling Upgrades; Ventilation Systems and Cooling Centres, Windows | February 18, 2021 | 6,685,000
184. | Trillium Lakelands District School Board | N15-3 | Hydration / Handwashing Project Group; Remote Learning Group (Portable Replacement) | February 26, 2021 | 600,000
185. | Trillium Lakelands District School Board | N15-4 | Installation of Water Bottle Filling Stations and Handwashing Upgrades (Faucets and/or Sinks) | February 18, 2021 | 125,000
186. | Upper Canada District School Board | N26-4 | Automatic Door Opener Project Group | February 18, 2021 | 273,000
187. | Upper Canada District School Board | N26-3 | Automatic Door Opener; Video Camera Childcare Project Group; Washroom Project Group; Site Project Group | February 18, 2021 | 3,335,315
188. | Upper Canada District School Board | N26-1 | HVAC Upgrade, Water Bottle Filling Station Installation, Portable Replacement, Retrofits, Wi-Fi Installation, Window Replacement | February 18, 2021 | 6,454,900
189. | Upper Canada District School Board | N26-2 | Water Bottle Filling Station Project Group | February 18, 2021 | 217,000
190. | Upper Grand District School Board | N18-3 | Portable Replacements; Ventilation Upgrades; Hand Hygiene Project Group | February 18, 2021 | 3,532,000
191. | Upper Grand District School Board | N18-2 | Touchpoint Reduction Project Group | February 18, 2021 | 24,000
192. | Upper Grand District School Board | N18-1 | Touchpoint Reductions; HVAC Upgrades; Portable Unit Ventilator Replacements | February 18, 2021 | 7,413,000
193. | Waterloo Catholic District School Board | N49-2 | Automatic Door Openers; HVAC Upgrades; Handwashing Stations; Separation Barriers | February 18, 2021 | 212,000
194. | Waterloo Catholic District School Board | N49-1 | Portable Replacement; HVAC Upgrades in Schools and Portables; Window Replacements | February 26, 2021 | 7,950,000
195. | Waterloo Region District School Board | N24-1 | HVAC Upgrades; Upgrading Wireless Access Points; Window Replacement; Washroom Upgrades; Installing Cooling / Air Conditioning Units; Room Partition Replacement | February 18, 2021 | 9,997,600
196. | Waterloo Region District School Board | N24-2 | Installing Mechanical Ventilation in Buildings Where None Currently Exist; Window Repair or Replacement for Fresh Air Intake | February 18, 2021 | 9,830,000
197. | Waterloo Region District School Board | N24-3 | Installing Mechanical Ventilation in Buildings Where None Currently Exist | February 18, 2021 | 6,185,000
198. | Waterloo Region District School Board | N24-4 | New Playground Space to Separate Groups; Safety Barriers; Water Bottle Filling stations | February 19, 2021 | 219,000
199. | Wellington Catholic District School Board | N48-1 | Touchless Washroom Faucets and Flush Valves; Water Bottle Filling Stations; HVAC Upgrades | February 18, 2021 | 1,999,490
200. | Windsor-Essex Catholic District School Board | N37-2 | HVAC Upgrades, Window Replacements; Purchase of New Portables; Water Bottle Filling Stations; PA System, Vestibules, Interior Retrofits | February 26, 2021 | 4,036,000
201. | Windsor-Essex Catholic District School Board | N37-1 | Portable Classroom HVAC Replacements; Wall Updates for Open Concept Sites. | February 18, 2021 | 1,845,000
202. | York Catholic District School Board | N42-2 | HVAC Upgrades in Schools and Portables; Window Replacements; Portable Replacements | February 18, 2021 | 8,021,000
203. | York Catholic District School Board | N42-1 | HVAC Upgrades; Water Bottle Filling Stations; Gym Divider Walls | February 18, 2021 | 9,561,500
204. | York Region District School Board | N16-1 | Cooling Centres; Window Replacements | February 18, 2021 | 5,150,000
205. | York Region District School Board | N16-2 | HVAC System in Portable Classrooms | February 18, 2021 | 5,200,000
206. | York Region District School Board | N16-3 | HVAC Upgrades (Schools); Wi-Fi Access Points and Network Switches; Security Access (Communication/Paging system) | February 18, 2021 | 4,769,007