ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19
Section 9
Updating of information on Registry
Cite as ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19, s. 9 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026
The text
(1) A project leader for a project who is required to file a notice under section 8 in respect of the project shall ensure that, before depositing excess soil at a Class 1 soil management site, Class 2 soil management site, reuse site, local waste transfer facility, landfilling site or dump, the information required to be included in the notice filed in the Registry under sections 10, 12 and 14 of Schedule 1 is information in respect of the applicable location. O. Reg. 406/19, s. 9 (1).
(2) A project leader mentioned in subsection (1) shall ensure that within 30 days after all soil that will become excess soil once removed has been removed from a project area, local waste transfer facility or Class 2 soil management site, the notice filed in the registry in respect of the project is updated with the following information:
1. The amount of excess soil removed from the project area as part of the project that was deposited at each of the following:
i. A Class 1 soil management site.
ii. A Class 2 soil management site.
iii. A reuse site.
iv. A local waste transfer facility.
v. A landfilling site or dump.
2. The date on which the last load of excess soil was removed from the project area, local waste transfer facility or Class 2 soil management site, as the case may be. O. Reg. 406/19, s. 9 (2); O. Reg. 775/20, s. 8.
(3) If a project leader or a person authorized to file a notice in the Registry on behalf of a project leader becomes aware that the notice filed in the Registry in respect of the project is no longer complete or accurate, the project leader or authorized person shall ensure that the notice is updated within 30 days after the day the person becomes aware that the information is no longer complete or accurate. O. Reg. 406/19, s. 9 (3).
Read the ON-SITE AND EXCESS SOIL MANAGEMENT on e-Laws ↗
Made under Environmental Protection Act, R.S.O. 1990, c. E.19.