ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19

Section 6.1

Soil additives

Cite as ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19, s. 6.1 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026

The text

(1) This section applies in respect of soil or crushed rock that satisfies one of the following descriptions: 1. It is dewatered or solidified and was excavated and processed at its excavation project area by mixing it with a substance or other material that was not waste and that was intended to dewater or solidify it. 2. It was excavated from a project area through use of an earth pressure balance tunnel boring machine, a slurry tunnel boring machine or a micro-tunnel boring machine and had a substance or other material added to it to facilitate tunnelling. O. Reg. 235/25, s. 9. (2) If the substance or other material mentioned in paragraph 1 or 2 of subsection (1) contains a natural or synthetic polymer or a foaming agent, the soil or crushed rock mentioned in subsection (1) is designated as waste unless, (a) the conditions set out in subsection (3) are satisfied; and (b) in the case of soil or crushed rock mentioned in paragraph 1 of subsection (1), the conditions set out in subsection (4) were satisfied before it became dewatered or solidified. O. Reg. 235/25, s. 9. (3) For the purposes of clause (2) (a), the project leader for the project or the operator of the project area shall retain a qualified person to do the following or to supervise a supervisee to do the following and the qualified person or supervisee must do the following: 1. Collect the following: i. Any information supplied by the manufacturer of the substance or other material, including any relevant safety data sheets and technical data sheets. ii. Any analytical results from the manufacturer that demonstrate whether the substance or other material affects the concentration of contaminants in the soil or crushed rock. iii. Information about whether the substance or other material may affect the sampling and analysis of the soil or crushed rock. iv. The results of any sampling and analysis undertaken by the qualified person or supervisee for the purpose of determining the effect of the substance or material on the concentration of contaminants in the soil or crushed rock. v. Any other information that, in the opinion of the qualified person or supervisee, is relevant to the use of the substance or other material or reuse of the soil or crushed rock. 2. Ensure that any sampling and analysis undertaken by the qualified person or the supervisee for the purpose of determining the effect of the substance or material on the concentration of contaminants in the soil or crushed rock is undertaken in accordance with the Soil Rules. 3. If the project leader or operator of the project area indicates that the soil or crushed rock will become excess soil and will be deposited for final placement at a reuse site, determine whether, having regard to the information collected under paragraph 1, there is any basis to conclude that the storage or final placement of the excess soil at a reuse site would cause an adverse effect. 4. If the determination under paragraph 3 is that there is a basis for the conclusion mentioned in that paragraph, determine whether the qualified person or supervisee can develop instructions, including any restrictions, relating to the storage and final placement of the excess soil at the reuse site that, if followed, would prevent any adverse effect mentioned in paragraph 3. 5. If the determination under paragraph 3 is that there is no basis for the conclusion mentioned in that paragraph or if the determination under paragraph 4 is that the instructions mentioned in that paragraph can be developed, prepare and give to the project leader or operator of the project area a document that sets out the following: i. Identification of the substance or other material and, in respect of dewatered or solidified soil or crushed rock, the mixing rates used to dewater or solidify the soil or crushed rock and the amount of liquid soil that was dewatered or solidified. ii. A description of the way in which the substance or other material may have altered the physical characteristics of the excess soil, if any. iii. Having regard to the information collected under paragraph 1, instructions, including any restrictions, relating to the storage and final placement at the reuse site of the excess soil, including to prevent any adverse effect mentioned in paragraph 3. iv. A summary of the information collected under paragraph 1 and the reasoning for the determinations made under paragraphs 3 and 4. 6. If the determination under paragraph 4 is that any adverse effect cannot be prevented by instructions mentioned in that paragraph, provide written notification to the project leader or operator of the project area that the excess soil should not be deposited for final placement at a reuse site, including a summary of the information collected under paragraph 1 and the reasoning for the determination. O. Reg. 235/25, s. 9. (4) For the purposes of clause (2) (b), the project leader for the project or the operator of the project area must have retained a qualified person to do the following or to supervise a supervisee to do the following and the qualified person or supervisee must have done the following: 1. Develop written procedures for the appropriate and safe use of the substance or other material within the project area during the dewatering or solidification process, having regard to any relevant information collected under paragraph 1 of subsection (3). 2. Give a copy of the written procedures mentioned in paragraph 1 to the project leader or operator of the project area. O. Reg. 235/25, s. 9. (5) If paragraph 5 of subsection (3) applies and the excess soil will be deposited for final placement at a reuse site, (a) the project leader or operator of the project area shall ensure that a copy of the document mentioned in paragraph 5 of subsection (3) is given to the owner or operator of the reuse site; and (b) the owner or operator of the reuse site shall ensure that the instructions set out in the document are followed. O. Reg. 235/25, s. 9. (6) If paragraph 6 of subsection (3) applies, the project leader or operator of the project area shall ensure that the excess soil is disposed of at a waste disposal site that is authorized under the environmental compliance approval governing the waste disposal site to accept the waste. O. Reg. 235/25, s. 9.
Read the ON-SITE AND EXCESS SOIL MANAGEMENT on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.