ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19

Section 5.5

Reuse site, infrastructure undertaking

Cite as ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19, s. 5.5 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026

The text

(1) Subject to subsection (3), excess soil is not designated as waste upon its final placement at a reuse site for an infrastructure undertaking if the excess soil’s excavation project area is in respect of an infrastructure project and the following criteria are satisfied: 1. Any storage of the excess soil after it is removed from its excavation project area and before it is deposited for final placement is at a Class 2 soil management site or a local waste transfer facility. 2. After it was removed from its excavation project area and before it is finally placed, the excess soil was segregated and if stored, stored in accordance with the Soil Rules. 3. Both the excavation project area and the reuse site at which the final placement occurs are related to each other as described in subsection (2). 4. After making reasonable efforts to take into consideration any past reports and any other information available about past uses and activities respecting the excavation project area, the project leader must, i. determine that the excess soil is not affected by a potentially contaminating activity within the meaning of Ontario Regulation 153/04, and ii. prepare a written document setting out that determination and the rationale, including a description of the reasonable efforts made and the project leader’s consideration of any reports and available information. 5. The excess soil is finally placed in accordance with any requirements set out in the Soil Rules. O. Reg. 235/25, s. 7. (2) For the purposes of paragraph 3 of subsection (1), a project area and a reuse site are related to each other if the following criteria are satisfied: 1. Either the project leader for the project carried out at the project area and the owner or operator of the reuse site are the same person or the owner or operator of the reuse site is a public body. 2. The infrastructure project and the infrastructure undertaking are both in respect of the same type of infrastructure, as determined in accordance with the Soil Rules. O. Reg. 235/25, s. 7. (3) This section does not apply to excess soil if, at any time before the excess soil is finally placed at the reuse site, any person managing the excess soil makes an observation, including any visual or olfactory observation, that suggests that the excess soil may be affected by the discharge of a contaminant, until such time as it is confirmed that the excess soil can be finally placed at the reuse site without causing an adverse effect. O. Reg. 235/25, s. 7.
Read the ON-SITE AND EXCESS SOIL MANAGEMENT on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.