ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19

Section 5.3

Temporary removal

Cite as ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19, s. 5.3 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026

The text

(1) Subject to subsection (2), excess soil that was removed temporarily from its excavation project area is not designated as waste upon its deposit at the excavation project area for final placement if, (a) any storage of the excess soil during the temporary removal was at a Class 2 soil management site or a local waste transfer facility that is owned or operated by the project leader of the project at the excavation project area; and (b) during the temporary removal, the excess soil was segregated and, if stored, stored in accordance with the Soil Rules. O. Reg. 235/25, s. 7. (2) This section does not apply to excess soil if, at any time before the excess soil is deposited at the excavation project area for final placement, any person managing the excess soil makes an observation, including any visual or olfactory observation, that suggests that the excess soil may be affected by the discharge of a contaminant, until such time as it is confirmed that the excess soil can be finally placed at the excavation project area without causing an adverse effect. O. Reg. 235/25, s. 7.
Read the ON-SITE AND EXCESS SOIL MANAGEMENT on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.