ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19

Section 5

Excess soil, reuse site not governed by instrument

Cite as ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19, s. 5 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026

The text

(1) For the purposes of paragraph 6 of subsection 3.1 (1), the following conditions must be satisfied: 1. Except in the case of excess soil finally placed on the bed of a surface water body, the quality of the excess soil that has been finally placed or that is intended to be finally placed at the reuse site must not exceed the following: i. The applicable excess soil quality standards as determined in accordance with the Excess Soil Standards, unless subparagraph ii applies. ii. Subject to subsection (4), if the excess soil does not meet an applicable excess soil quality standard mentioned in subparagraph i in respect of a parameter, the site-specific excess soil quality standards developed for the reuse site in respect of that parameter in accordance with subsections (3) and (5). 2. Excess soil must not be deposited at the reuse site, whether to be stockpiled temporarily or for final placement, unless there is an identified beneficial purpose in connection with a specific undertaking for which the excess soil is to be used at the reuse site, including any of the following: i. Backfilling an excavation at the reuse site to implement the undertaking. ii. Achieving the grade necessary at the reuse site for, A. landscaping, B. a planned or existing infrastructure undertaking, or C. an undertaking related to existing or planned development. iii. The final placement of fill to assist in the rehabilitation of the reuse site. 3. Revoked: O. Reg. 174/24, s. 4 (1). 4. The quantity of excess soil deposited or to be deposited at the reuse site must not exceed the quantity necessary for the beneficial purpose identified. 5. Subject to subsections (6) and (7), the excess soil must be finally placed no later than two years after it is deposited at the reuse site. 6. The excess soil must be finally placed in accordance with subsection (8) and any requirements set out in the Soil Rules. O. Reg. 406/19, s. 5 (1); O. Reg. 775/20, s. 4 (1, 2); O. Reg. 174/24, s. 4 (1, 2); O. Reg. 235/25, s. 6 (1-3). (2) For the purposes of subparagraph 1 ii of subsection (1), only a qualified person shall develop and apply site-specific excess soil quality standards for the reuse site or supervise the development and application by a supervisee. O. Reg. 775/20, s. 4 (3). (3) The qualified person described in subsection (2) or the supervisee shall use the Beneficial Reuse Assessment Tool to develop and apply site-specific excess soil quality standards in accordance with the Soil Rules. O. Reg. 775/20, s. 4 (3). (4) The qualified person or supervisee shall not use the Beneficial Reuse Assessment Tool to develop and apply a site-specific excess soil quality standard for the purposes of subparagraph 1 ii of subsection (1) in circumstances that are identified in the Soil Rules as circumstances in which the Beneficial Reuse Assessment Tool can only be used under the authority of a site specific instrument mentioned in paragraph 5 of subsection 3.1 (1). O. Reg. 406/19, s. 5 (4); O. Reg. 235/25, s. 6 (4). (5) If the qualified person is retained by the operator of the reuse site, the qualified person shall, (a) complete a declaration attesting to the accuracy of the information and the assumptions provided as inputs for the Beneficial Reuse Assessment Tool; and (b) ensure that the operator of the reuse site is given a copy of the declaration and the output worksheet generated when using the Beneficial Reuse Assessment Tool. O. Reg. 775/20, s. 4 (4). (5.1) If the qualified person described in subsection (2) is retained by a person other than the operator of the reuse site, including by the project leader of the site from which the excess soil is excavated, then before the person responsible for the retaining permits any excess soil that is subject to a site-specific excess soil quality standard to be deposited at the reuse site, (a) the person who retained the qualified person or the qualified person shall ensure that the operator of the reuse site receives the declaration and output worksheet mentioned in clause (5) (b) and any other reports the qualified person prepares in respect of the reuse site to support the development of the site-specific excess soil quality standard; and (b) the qualified person shall ensure that the reuse site operator is authorized to rely on the documents mentioned in clause (a), with that reliance to be based on any assumptions, reuse site characteristics or other conditions that apply to the site-specific excess soil quality standard that the qualified person developed when using the Beneficial Reuse Assessment Tool. O. Reg. 775/20, s. 4 (4). (6) A Director may, by written notice provided to the operator of the reuse site, authorize an extension, not exceeding five years, of the two-year period mentioned in paragraph 5 of subsection (1), if the Director is satisfied that, (a) the extension is necessary in order for the excess soil to be used for a beneficial purpose; and (b) the extension will not result in an adverse effect. O. Reg. 406/19, s. 5 (6). (7) Paragraph 5 of subsection (1) does not apply if the excess soil is to be finally placed at a reuse site that is part of an infrastructure undertaking. O. Reg. 406/19, s. 5 (7); O. Reg. 235/25, s. 6 (5). (8) Subject to subsection (9), for the purposes of paragraph 6 of subsection (1), the operator of a reuse site with one of the following uses shall ensure that a landscape plan is prepared in accordance with the Soil Rules and by a person retained as mentioned in subsection (10) before salt-impacted excess soil is finally placed in one or more parts of the reuse site at which vegetation may be grown: 1. Community use. 2. Residential use. 3. Parkland use. 4. Institutional use. O. Reg. 174/24, s. 4 (3). (9) A landscape plan mentioned in subsection (8) is not required in either of the following circumstances: 1. The salt-impacted soil has been finally placed at the reuse site at a depth of at least 1.5 metres below the soil surface. 2. The reuse site is owned or controlled by a public body that has developed and implemented a policy governing the final placement of salt-impacted excess soil at a location where vegetation may be grown at reuse sites it owns or controls. O. Reg. 174/24, s. 4 (3). (10) The operator mentioned in subsection (8) shall retain one of the following to prepare a landscape plan mentioned in that subsection: 1. A person who is authorized to use the designation of “Landscape Architect” under the Ontario Association of Landscape Architects Act, 1984. 2. A person who is certified as a professional agrologist under the Ontario Institute of Professional Agrologists Act, 2013. 3. A person who meets the qualifications set out in section 6 of Ontario Regulation 153/04. O. Reg. 174/24, s. 4 (3).
Read the ON-SITE AND EXCESS SOIL MANAGEMENT on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.