ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19

Section 23

Procedure required

Cite as ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19, s. 23 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026

The text

(1) The project leader or the operator of a project area shall ensure that a written procedure is developed and applied with respect to what must occur if any person working in the project area makes an observation during soil excavation within the project area, including any visual or olfactory observation, that suggests that the soil being excavated may be affected by the discharge of a contaminant. O. Reg. 406/19, s. 23 (1); O. Reg. 235/25, s. 23. (2) At a minimum, the project leader or the operator of the project area shall ensure that the procedure mentioned in subsection (1) sets out the following: 1. All soil excavations in the project area must immediately cease upon the observation being made, until such time as the project leader directs that soil excavations may be resumed. 2. The project leader or the operator of the project area must immediately be notified of the observation. 3. The project leader or the operator of the project area, upon being notified of the observation, must, before directing that soil excavations may be resumed, ensure that all necessary steps are taken to ensure that, i. all excavated soil or excavated crushed rock that is affected by the discharge of a contaminant is identified and is segregated from other excavated soil or excavated crushed rock in the project area, ii. the portion of the project area that is affected by the discharge of a contaminant is determined, and iii. any excess soil from that portion of the project area is disposed of in accordance with this Regulation. 4. If a project leader was required to ensure that a qualified person prepared or oversaw the preparation of documents under this Regulation, the project leader shall, before authorizing any soil to be removed from the project area where the observation was made, i. obtain the advice of a qualified person regarding what steps are necessary in order to ensure the outcomes mentioned in subparagraphs 3 i, ii and iii, and ii. request that the qualified person advise on whether any of the documents required under this Regulation require revision as a result of the observation. O. Reg. 406/19, s. 23 (2); O. Reg. 775/20, s. 15.
Read the ON-SITE AND EXCESS SOIL MANAGEMENT on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.