ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19

Section 19

Operation of reuse site

Cite as ON-SITE AND EXCESS SOIL MANAGEMENT, O. Reg. 406/19, s. 19 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026

The text

(1) Subject to subsections (1.1) and (2), this section applies to the owner or operator of a reuse site at which at least 10,000 m3 of excess soil is expected to be deposited for final placement in respect of an undertaking. O. Reg. 406/19, s. 19 (1); O. Reg. 775/20, s. 13 (1). (1.1) This section only applies to a reuse site that is in operation on the day this section comes into force if at least 10,000 m3 of excess soil is expected to be deposited for final placement in respect of the undertaking at the reuse site after this section comes into force. O. Reg. 775/20, s. 13 (2). (2) This section does not apply to a reuse site that is part of an infrastructure undertaking. O. Reg. 406/19, s. 19 (2); O. Reg. 775/20, s. 13 (3); O. Reg. 235/25, s. 15 (1). (3) Before excess soil for final placement in respect of an undertaking may be deposited at the reuse site, the owner or operator of the reuse site shall ensure that the following steps are taken: 1. A notice described in subsection (4) is filed in the Registry. 2. Written procedures are developed and applied to account for every load of excess soil to be deposited at the reuse site for final placement in respect of an undertaking. 3. Written procedures are developed and applied to ensure that the storage of excess soil for final placement in respect of an undertaking at the reuse site does not cause an adverse effect. O. Reg. 406/19, s. 19 (3); O. Reg. 235/25, s. 15 (2, 3). (4) For the purposes of paragraph 1 of subsection (3), the notice must include the following information: 1. A description of the reuse site, including, i. the location of each property that is located, in whole or in part, within the reuse site, and ii. the geographic coordinates of the centroid of the reuse site measured using a global positioning system receiver and projected on the Universal Transverse Mercator coordinate system. 2. A description of the undertaking at the reuse site in respect of which the excess soil is to be deposited for final placement. 3. The name, mailing address, postal code, telephone number and email address of the operator of the reuse site. 4. If the operator of the reuse site is not the owner of the site, the name, mailing address, postal code, telephone number and email address of the owner. 5. An estimate of the quantity of excess soil for final placement in respect of an undertaking that will be deposited at the reuse site. 6. The applicable excess soil quality standards for the reuse site, as determined in accordance with the Excess Soil Standards. 7. If site-specific excess soil quality standards have been developed for the reuse site by a qualified person, including by using the Beneficial Reuse Assessment Tool, an indication that this is the case and the name and contact information of the qualified person who developed the site-specific excess soil quality standards. 8. If an instrument mentioned in paragraph 5 of subsection 3.1 (1) has been issued governing the reuse site, identification of the body that issued the instrument, the date the instrument was issued and to whom the instrument is issued, and if there is an instrument identification number, that number. 9. An estimate of when the first and final loads of excess soil for final placement in respect of an undertaking will be deposited at the reuse site. 10. A declaration by the owner or operator of the reuse site, stating that the steps described in paragraphs 2 and 3 of subsection (3) have been and will continue to be taken. O. Reg. 406/19, s. 19 (4); O. Reg. 775/20, s. 13 (4); O. Reg. 174/24, s. 11; O. Reg. 235/25, s. 15 (4). (5) For the purposes of paragraph 2 of subsection (3), the procedures must provide for the following: 1. For each load deposited, identification of the project area, Class 1 soil management site or Class 2 soil management site from which the excess soil was transported. 2. Ensuring that all relevant reports and information in respect of the excess soil to be deposited at the reuse site are obtained by the owner or operator of the reuse site before the excess soil is deposited at the reuse site. 3. Ensuring that before the owner or operator of the reuse site permits a load of excess soil to be deposited at the reuse site, the load is inspected by the owner or operator of the reuse site or a person acting on the owner or operator’s behalf to ensure the load is appropriate for depositing at the site and that it is consistent with any reports and information referred to in paragraph 2. O. Reg. 406/19, s. 19 (5). (6) The owner or operator of the reuse site shall ensure that within 30 days after the final load of excess soil for final placement in respect of an undertaking has been deposited at the reuse site, the notice filed in the Registry includes the following information: 1. Confirmation that all excess soil for final placement in respect of an undertaking has been deposited at the reuse site. 2. The total amount of excess soil for final placement in respect of an undertaking deposited at the reuse site. 3. The date on which the final load of excess soil for final placement in respect of an undertaking was deposited at the reuse site. O. Reg. 406/19, s. 19 (6). (7) If the owner or operator of the reuse site becomes aware that the notice filed in the Registry in respect of the reuse site is no longer complete or accurate, the owner or operator shall ensure that the notice is updated within 30 days after the day the owner or operator becomes aware that the information is no longer complete or accurate. O. Reg. 775/20, s. 13 (5).
Read the ON-SITE AND EXCESS SOIL MANAGEMENT on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.