GREENHOUSE GAS EMISSIONS PERFORMANCE STANDARDS, O. Reg. 241/19
Section 2
Required registration
Cite as GREENHOUSE GAS EMISSIONS PERFORMANCE STANDARDS, O. Reg. 241/19, s. 2 · current to November 11, 2026 · consolidated from August 14, 2025 · read from e-Laws on November 16, 2026
The text
(1) The owner or operator of an EPS facility that meets the criteria set out in subsection (2) shall,
(a) if the facility has never been registered under this Regulation, register the facility with the Director in the first year in which the criteria are met; or
(b) if the facility has previously been registered under this Regulation but its most recent registration has been cancelled, register the facility with the Director in the first year in which the criteria are met after the year of that cancellation as specified in the confirmation of cancellation given under clause 8.1 (7) (a). O. Reg. 562/22, s. 5.
(2) The following are the criteria mentioned in subsection (1):
1. The primary activity engaged in at the facility is an industrial activity listed in paragraphs 1 to 38 of Schedule 2.
2. As a result of greenhouse gas emissions related to the facility in 2014 or any subsequent year, the owner or operator of the facility was required, or a previous owner or operator of the facility was required, to report under a regulation set out in Column 1 of the Table to this subsection and the amount described opposite the regulation in Column 2 of the Table that was set out in the report in respect of the facility was at least 50,000 tonnes of CO2e.
Table
Item | Column 1 Regulation | Column 2 Amount
1. | The Reporting Regulation | The reporting amount within the meaning of the Reporting Regulation.
2. | Ontario Regulation 452/09 | The result of the calculation under clause 7.3 (1) (c) of Ontario Regulation 452/09 as it read on July 31, 2018.
3. | Ontario Regulation 452/09 | The amount required to be set out in a report under paragraph 9 of section 6 of Ontario Regulation 452/09 as it read on December 9, 2015.
4. | Ontario Regulation 143/16 | The reporting amount within the meaning of Ontario Regulation 143/16.
(3) For greater certainty, a requirement mentioned in paragraph 2 of subsection (2) includes a requirement to report in respect of any site that,
(a) forms part of the facility that is the subject of the registration; and
(b) was a facility under any previous definition of “facility”. O. Reg. 562/22, s. 5.
(4) Despite clause (1) (b), if a facility’s most recent registration has been cancelled following an application made under paragraph 2 of subsection 8.1 (3), the requirement to register the facility does not apply during the period that commences on the date that the registration is cancelled and ends on the first day of the cessation period specified in the application. O. Reg. 562/22, s. 5.
Read the GREENHOUSE GAS EMISSIONS PERFORMANCE STANDARDS on e-Laws ↗