ASSESSMENT WORK, O. Reg. 65/18

Section 2

Types of assessment work and related expenses

Cite as ASSESSMENT WORK, O. Reg. 65/18, s. 2 · current to November 11, 2026 · consolidated from April 10, 2018 · read from e-Laws on November 16, 2026

The text

(1) For the purposes of this Regulation, the following types of work constitute assessment work: 1. Grass roots prospecting. 2. Bedrock trenching, bedrock pitting, overburden stripping and related manual work including outcrop mapping, outcrop washing and brushing and sampling associated with this work such as channel sampling and plugger sampling. 3. Taking samples for purposes of geoscience work. 4. Remote sensing imagery. 5. Geological survey work. 6. Geochemical survey work. 7. Ground geophysical survey work. 8. Airborne geophysical survey work. 9. Modelling or reprocessing of existing data in order to identify a new mineral exploration target. 10. Line cutting associated with geoscience work. 11. Exploratory drilling by core or non-core method, including diamond or core drilling, and other drilling such as percussion, reverse circulation and auger drilling. 12. Drill core or drill sample submissions. 13. Petrographic work, including microscopy, scanning electron microscopy and electron microprobe studies. 14. Environmental baseline studies. 15. Rehabilitation required or permitted to be done under the Act, if done in accordance with the requirements in the Act or the regulations. (2) Since annual units of assessment work required under section 65 of the Act and assessment work credits are measured by the amount of money spent on the assessment work, the following costs and expenses shall be included when determining the amount of assessment work performed on mining lands and the amount of assessment work credits to assign to the work: 1. Labour costs and field supervision costs. 2. Fees for contractors and consultants. 3. Cost of supplies consumed and equipment rental. 4. Cost of food and lodging. 5. Costs for the transportation of supplies, equipment and persons within Ontario to and from the mining lands. 6. Cost of shipping samples. 7. Cost of assays and chemical analysis of samples. 8. Cost of building a trail to and on the mining lands where the work is performed. 9. Cost of industrial mineral marketing. 10. Cost of consultations with Aboriginal communities carried out with respect to exploration activities that are being carried out or are proposed to be carried out on mining lands.
Read the ASSESSMENT WORK on e-Laws ↗

Made under Mining Act, R.S.O. 1990, c. M.14.