OCCUPATION OF PUBLIC LANDS UNDER SECTION 21.1 OF THE ACT, O. Reg. 161/17

Section 17.1

Bridges

Cite as OCCUPATION OF PUBLIC LANDS UNDER SECTION 21.1 OF THE ACT, O. Reg. 161/17, s. 17.1 · current to November 11, 2026 · consolidated from May 1, 2026 · read from e-Laws on November 16, 2026

The text

(1) A person is authorized to occupy public lands under section 21.1 of the Act for the purpose of erecting, placing or using a bridge only if one of the following conditions are met: 1. The person is constructing or using a bridge as part of forest operations and the construction or use is authorized under a forest management plan approved under the Crown Forest Sustainability Act, 1994. 2. The person, i. is constructing or using a bridge for any purpose other than as part of forest operations, and ii. has entered into an agreement with the Minister under the Act respecting the maintenance of or repairs to the bridge or its inspection or decommissioning. O. Reg. 123/26, s. 5. (2) A person is authorized to occupy public lands under section 21.1 of the Act for the purpose of erecting, placing or using a short-term bridge, if the following conditions are met: 1. The person shall, in accordance with section 26, submit for registration the geographic point of the location of the public lands to be occupied by the short-term bridge and submit to the Ministry all information required under subsection 26 (4). 2. The person shall not commence any work related to the occupation until 10 days after the date of the confirmation from the Ministry indicating that the geographic point and the required information have been received by the Ministry. 3. If the public lands to be occupied are subject to an energy procurement contract entered into by the Independent Electricity System Operator, the person satisfies the Ministry that they have the consent of the person with whom the Independent Electricity System Operator has entered into a contract, unless the person proposing the occupation is that person. 4. If the public lands to be occupied are in an area for which the Ministry has recognized a person’s exclusive eligibility to apply for authorizations related to waterpower or onshore wind development, the person satisfies the Ministry that they have the consent of the person with exclusive eligibility, unless the person proposing the occupation is that person. 5. Prior to the submission of the geographic point for registration as described in paragraph 1, the person shall ensure that the following is prepared: i. bridge design drawings sealed and signed by a professional engineer licensed under the Professional Engineers Act, and ii. dated photographs of the location where the short-term bridge will be constructed. 6. The documentation required to be prepared under paragraph 5 shall be retained for a period of no less than one year following the date of termination of the occupation by the person and be made available to the Ministry upon request. 7. The occupation shall not exceed a period of two years and 10 days starting on the date of the confirmation from the Ministry indicating that the geographic point and the required information have been received by the Ministry as described under paragraph 2. 8. The short-term bridge is, i. designed by a professional engineer, licensed under the Professional Engineers Act to, A. span any watercourse channel with no disturbance or in-filling below the high-water mark or to span any other valley feature with no disturbance below the top of bank, B. have sufficient height to safely pass the 25-year flood which is a flood event that has a 4% probability of being equalled or exceeded in any single year, C. maintain a minimum freeboard of 0.5 m, which is an area measured vertically between the lowest part of the short-term bridge’s soffit and the design flood flow water elevation of the 25-year flood, and D. meet any applicable safety requirements and be safe for use for the duration of the occupation, ii. constructed in accordance with the design specifications set out in subparagraph i, iii. inspected and evaluated as safe for use by a professional engineer, licensed under the Professional Engineers Act, immediately after its construction, and iv. is kept in a state of good repair and maintained by the person for continued safe usage for the duration of the occupation. 9. Within 10 days of the completion of the construction of the short-term bridge, the person shall ensure that the following is prepared: i. dated photographs of the short-term bridge as constructed, ii. a written report sealed and signed by a professional engineer, licensed under the Professional Engineers Act, that confirms that the conditions in subparagraphs 8 i to iii have been satisfied and that the short-term bridge is safe for use for the duration of the occupation, iii. a decommissioning plan sealed and signed by a professional engineer, licensed under the Professional Engineers Act that sets out: A. the steps for removal of the short-term bridge in a manner that ensures public safety and considers how the removal of the short-term bridge will impact any roads or access points, B. the steps for restoring the lands to a clean and safe condition, and to the extent possible, to the condition the lands were in prior to the erection or placement of the short-term bridge, C. the signage to be installed in relation to the removal of the short-term bridge, and iv. any updates to the decommissioning plan, sealed and signed by a professional engineer licensed under the Professional Engineers Act, necessary as a result of any new roads or access points being constructed after the short-term bridge is constructed. 10. The documentation required to be prepared under paragraph 9 shall be retained for a period of no less than one year following the date of termination of the occupation by the person and be made available to the Ministry upon request. 11. After 13 months following the completion of the erection or placement of the short-term bridge, the person shall ensure that a written report, sealed and signed by a professional engineer licensed under the Professional Engineers Act, is prepared that confirms that, after at least one year of use, the short-term bridge has been inspected and evaluated as safe for continued use. 12. The report required to be prepared under paragraph 11 shall be retained for a period of no less than one year following the date of termination of the occupation by the person and be made available to the Ministry upon request. 13. During the period of the occupation, the person shall post signage, i. indicating that the bridge is a temporary short-term bridge and the targeted date of its removal, which shall be consistent with the date of termination of the occupation and, if there is a change to that date, made in accordance with this Regulation, the sign shall be updated promptly to reflect the change, and ii. in the following circumstances, indicating that the short-term bridge is not available for use, A. before the short-term bridge is inspected and evaluated as safe under subparagraph 8 iii, B. if the inspection and evaluation required under subparagraph 8 iii are not completed or if the short-term bridge is inspected and found to be unsafe for continued use, C. if the short-term bridge becomes unsafe for use at any point during the period of time described in paragraph 7. 14. If the short-term bridge becomes unsafe for use at any point during the period of time described in paragraph 7, the person shall immediately notify the Ministry by email at an address identified for the purposes of such a notice on a website of the Government of Ontario and provide details of how the person will address the unsafe condition, post the necessary signage or remove the short-term bridge. 15. In the course of the erection, placement and decommissioning of the short-term bridge and restoration of the occupied public lands, i. no watercourse shall be realigned, ii. no bed or banks below the high-water mark of any watercourse or lands below the top of bank of a valley feature spanned by the short-term bridge shall be dredged, filled, graded or excavated, iii. no blasting or pile driving shall occur, iv. only clean and non-erodible materials are used and, if concrete is used, only pre-cast concrete is used, v. erosion and sediment controls shall be put in place for the erection, placement and decommissioning of the short-term bridge and for restoration of the occupied public lands, and vi. any machinery with tracks or wheels is operated above the high-water mark or on ice in a manner that does not disturb any vegetation below the high-water mark of any watercourse or below the top of bank of a valley feature or in a manner that minimally disturbs any vegetation above the high-water mark of any watercourse or the top of bank of a valley feature. 16. The short-term bridge shall not be constructed on top of an existing bridge, or to supplement any part of an existing bridge. 17. If the occupation of the public lands by the short-term bridge is to end on a date before the termination date submitted under subsection 26 (4), the person shall notify the Ministry by email at an address identified for the purposes of such a notice on a website of the Government of Ontario, at least 30 days in advance, of the new termination date of the occupation. 18. The person shall remove the short-term bridge in accordance with the decommissioning plan prepared under paragraph 9 and the termination date submitted under subsection 26 (4) or, if applicable, the new termination date of the occupation set out in a notice to the Ministry under paragraph 17, unless, i. a document has been issued under the Act that authorizes the person to occupy the public lands for the purposes of the continued use of the bridge that was previously authorized as a short-term bridge, or ii. the requirements of subsection (1) have been satisfied. 19. Within 10 days after the implementation of the decommissioning plan, the person shall ensure that a report is prepared that describes and contains photographs documenting the work done to implement the decommissioning plan, including the restoration of the lands where the short-term bridge was constructed, the installation of any barriers or signs and any other steps that were taken. 20. The report required to be prepared under paragraph 19 shall be retained for a period of no less than one year following the date of termination of the occupation by the person and be made available to the Ministry upon request. 21. Within 15 days of the date of termination of the occupation, the person shall, in accordance with section 26, submit to the Ministry all things required to be prepared and retained under this subsection. O. Reg. 123/26, s. 5. (3) No person is authorized under subsection (2) to construct a short-term bridge at a geographic point if there was a prior registration of a geographic point for the same short-term bridge. O. Reg. 123/26, s. 5.
Read the OCCUPATION OF PUBLIC LANDS UNDER SECTION 21.1 OF THE ACT on e-Laws ↗

Made under Public Lands Act, R.S.O. 1990, c. P.43.