REGISTRATIONS UNDER PART II.2 OF THE ACT — WATER TAKING, O. Reg. 63/16

Section 8

Registration requirements, s. 20.21 (1) (a) of the Act

Cite as REGISTRATIONS UNDER PART II.2 OF THE ACT — WATER TAKING, O. Reg. 63/16, s. 8 · current to November 11, 2026 · consolidated from September 1, 2026 · read from e-Laws on November 16, 2026

The text

(1) A person who proposes to engage in an activity prescribed by section 7 shall not register the activity in the Registry until the person proposing to engage in the activity, (a) has received a copy of a water taking report that is prepared by a person who meets the qualifications set out in subsection (2) and includes the information set out in subsection (4); and (b) has received a copy of a discharge report that is prepared by a person who meets the qualifications set out in subsection (3) and includes the information and statements set out in subsection (5). O. Reg. 300/21, s. 10. (2) A person meets the qualifications referred to in clause (1) (a) if the person, (a) holds a certificate of registration under the Professional Geoscientists Act, 2000, and is a practising member, temporary member or limited member of the Association of Professional Geoscientists of Ontario; or (b) is a professional engineer who meets the requirements set out in paragraph 2 of subsection 3 (3) of the Professional Geoscientists Act, 2000. O. Reg. 300/21, s. 10. (3) A person meets the qualifications referred to in clause (1) (b) if the person holds, at a minimum, a bachelor’s degree with a specialization in hydrology, aquatic ecology, limnology, biology, physical geography or water resources management or engineering. O. Reg. 300/21, s. 10. (4) The following information must be included in a water taking report referred to in clause (1) (a): 1. A description of the water taking activity, including the rate at which the water will be taken and the volume that may be taken. 2. A description of the construction site. 3. An identification of the expected area of influence for each dewatered work area within the construction site, having regard to the amount of ground water that will be taken and all calculations and assumptions used to identify the expected area of influence. 4. An analysis of the potential sources of contamination in each expected area of influence identified under paragraph 3. 5. An analysis of the potential impact of contamination or movement of contaminants that could occur as a result of the proposed water taking, including an assessment of the impact of the movement of contaminants in each expected area of influence and all calculations used to assess the potential impact. 6. An analysis of the potential impact of the soil settlement and land subsidence that would occur as a result of the proposed water taking, including an assessment of the impact of the soil settlement and land subsidence on the integrity of infrastructure located in each expected area of influence and all calculations used to assess the potential impact. 7. An analysis of the potential impact of the proposed water taking on other water users in each expected area of influence, including calculations determining whether the volume of water to be taken during the proposed water taking would limit the availability of water for other water users in the area. 8. An analysis of the potential impact of the proposed water taking on conservation land, fish and wildlife habitat and natural functions of the ecosystem in each expected area of influence, as the case may be, including calculations determining whether the volume of water to be taken during the proposed water taking would likely cause any adverse effect. 9. An identification of the measures that will be implemented to monitor, prevent, mitigate or remedy all potential impacts of the proposed water taking activity identified as a result of the analyses completed in paragraphs 4 to 8. 10. A contingency plan that includes the following information: i. An outline of the measures that must be implemented if the water supply is affected for other water users, including a plan to, A. make available, to affected water users, a supply of water equivalent in quantity and quality to the users’ normal takings, or compensation for the users’ reasonable costs of obtaining a supply of water equivalent in quantity and quality to the users’ normal takings, and B. if necessary, reduce the rate and amount of taking to prevent or otherwise alleviate the negative impact on the water supply. ii. Identification of any measures that must be implemented and the circumstances in which they must be implemented to address the potential impact of the proposed water taking on other water users in each expected area of influence, including, at a minimum, the following impacts: A. The impacts of movement of contaminants. B. The impacts of soil settlement and land subsidence. C. The impacts on other water users. D. The impacts on conservation land, fish and wildlife habitat and the natural functions of the ecosystem. iii. An assessment of whether a shutdown protocol is required and, if required, a description of the shutdown protocol including the circumstances in which it would be implemented. 11. A protocol for providing notice to the Ministry immediately if the shutdown protocol, if any, or any of the measures in the contingency plan mentioned in paragraph 10 are implemented. 12. A protocol for providing written notice to any other water users who may be impacted by the water taking and to the applicable district office of the Ministry at least 48 hours before the commencement of the initial taking of water that includes, at a minimum, the following information: i. A description of where the water taking is to occur. ii. The dates on which the water is intended to be taken. iii. The approximate time and duration that each water taking will occur. iv. The registration number that appears on the confirmation of registration in respect of the activity that is provided under subsection 2 (4) of Ontario Regulation 245/11. v. The name and telephone number of a person who can be contacted to report any concerns about the water taking interfering with another water supply. 13. An analysis to determine whether a water monitoring plan is required to monitor the potential impacts of the water taking. 14. If the analysis referred to in paragraph 13 determines that a water monitoring plan is required, a detailed description of the plan and the circumstances in which it would need to be implemented. 15. A summary of the qualifications and experience of the person who prepared the water taking report, including the person’s name and licence number. 16. A statement, signed by the person who prepared the water taking report, that includes the following: i. Confirmation that all available information has been considered in accordance with the professional standards of the person who prepared the report. ii. Confirmation that, based on the information available, the information in the report is accurate as of the date the report is signed and sealed. iii. Confirmation that, based on the information available, all necessary measures have been recommended to monitor, prevent, mitigate or remedy any potential impacts of the proposed water taking activity. iv. Confirmation that, based on the opinion of the person who prepared the water taking report, the proposed water taking activity is unlikely to cause an adverse effect. 17. The date the water taking report was prepared. O. Reg. 66/25, s. 5 (1). (5) The following information and statements must be included in a discharge report referred to in clause (1) (b): 1. An assessment of the quality and quantity of the ground water and storm water being discharged 2. The location of the discharge, if applicable. 3. Subject to subsection (6), a recommendation of one of the following methods of transfer or discharge: i. Transfer to a waste management system that is subject to an environmental compliance approval or in respect of which an activity has been registered for the purposes of subsection 20.21 (1) of the Act. ii. Discharge into one of the following sewage works: A. A sewage works that is subject to an environmental compliance approval. B. A sewage works in respect of which an activity has been registered for the purposes of subsection 20.21 (1) of the Act. C. A sewage works in respect of which no environmental compliance approval is required or at which no activity prescribed for the purposes of subsection 20.21 (1) of the Act is engaged in. iii. Discharge into a municipal sanitary sewer or a municipal storm sewer. iv. Discharge into the natural environment as described in paragraph 4. 4. If the recommended method of discharge is discharge into the natural environment, i. Revoked: O. Reg. 66/25, s. 5 (6). ii. an identification of any treatment and control measures required to minimize erosion, flooding, scouring and sedimentation from occurring as a result of the discharge, ii.1 an identification of any additional treatment and control measures required to address the quality of the discharge if the analysis referred to in paragraph 5 of subsection (4) determines a potential for movement of contaminants, and iii. an identification of any treatment and control measures required to address the quality of the discharge to ensure that the discharge will not cause an adverse effect. 5. An analysis to determine whether a monitoring plan is required to monitor the potential impacts of the discharge. 6. If the analysis referred to in paragraph 5 determines that a monitoring plan would be needed, a description of the plan and the circumstances in which it would be needed. 7. A contingency plan that outlines measures that must be implemented, if any, and the circumstances in which they must be implemented to, i. address the potential impacts related to the quality and quantity of the discharge, ii. address any failures of recommended treatment or control measures, iii. address other site-specific impacts, including any risks associated with movement of contaminants or flooding, if applicable, and iv. assess whether a shutdown protocol is required and, if required, develop a shutdown protocol and identify the circumstances in which it must be implemented. 8. A summary of the qualifications and experience of the person who prepared the discharge report. 9. A statement, signed by the person who prepared the discharge report, that includes the following: i. Confirmation that all available information has been considered to the best knowledge and skills of the person who prepared the discharge report. ii. Confirmation that, based on the information available, the information in the report is accurate as of the date the report is signed. iii. Confirmation that, based on the information available, all necessary methods and procedures were employed to minimize any errors in assessing the potential impacts of the proposed water taking activity. iv. Confirmation that, based on the opinion of the person who prepared the discharge report, the discharge of the ground water and storm water is unlikely to cause an adverse effect. 10. The date the discharge report was prepared. O. Reg. 63/16, s. 8 (5); O. Reg. 66/25, s. 5 (2-9) (6) For the purposes of paragraphs 1 to 3 of subsection 2 (2) of Ontario Regulation 245/11, a person who proposes to engage in an activity prescribed by section 7 shall file in the Registry the water taking report and discharge report referred to in subsection (1). O. Reg. 66/25, s. 5 (10). (7) Despite subsection (6), a person who engaged in an activity prescribed by section 7 immediately before the transition date is not required to file the water taking report and discharge report until such time as updating of the information, other than administrative information, filed in the Registry is required under section 3 of Ontario Regulation 245/11. O. Reg. 66/25, s. 5 (10). (8) In this section, “transition date” means the day section 1 of Ontario Regulation 66/25 made under the Act comes into force. O. Reg. 66/25, s. 5 (10).
Read the REGISTRATIONS UNDER PART II.2 OF THE ACT — WATER TAKING on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.