REGISTRATIONS UNDER PART II.2 OF THE ACT — WATER TAKING, O. Reg. 63/16

Section 14

Activity requirements, s. 20.21 (1) (c) of the Act

Cite as REGISTRATIONS UNDER PART II.2 OF THE ACT — WATER TAKING, O. Reg. 63/16, s. 14 · current to November 11, 2026 · consolidated from September 1, 2026 · read from e-Laws on November 16, 2026

The text

For the purposes of clause 20.21 (1) (c) of the Act, a person who engages in an activity prescribed by section 12 of this Regulation shall ensure that all of the following applicable requirements and all of the applicable measures and requirements set out in the pumping test design report prepared for the activity are complied with: 1. Prior to the commencement of the activity, the notification protocol shall be implemented in accordance with the protocol set out in the pumping test design report pursuant to paragraph 4 of subsection 13 (3). 2. A copy of the pumping test design report shall be provided in paper or electronic format for inspection upon request. 3. The pumping test shall be performed in accordance with the pumping test design report and in accordance with any subsequent modifications to the report that have been approved by the person who prepared the report. 4. A monitoring plan shall be implemented in accordance with the plan set out in the pumping test design report. 5. Any measures identified in the contingency plan set out in the pumping test design report pursuant to paragraph 6 of subsection 13 (3) shall be implemented if the applicable circumstances arise. 6. With respect to any ground water or storm water, or both, that is discharged into the natural environment or a storm sewer, there shall be no visible petroleum hydrocarbon film or sheen present. 7. The method of transfer or discharge recommended by the discharge plan set out in the pumping test design report shall be implemented with respect to the ground water or storm water, or both, that is taken for the purposes of the pumping test. 8. Any erosion, sediment and total suspended solids control measures identified in the pumping test design report pursuant to sub-subparagraphs 7 iv A and B of subsection 13 (3) shall be used, operated and maintained in a manner that satisfies the recommendations of the manufacturer of the control measures or as directed in the discharge plan if no such recommendations exist. 9. All control measures referred to in paragraph 8 and all materials collected or trapped by those measures shall be recovered and disposed of when the person is no longer engaging in the activity. 10. On or before March 31 in each year, the person engaging in the activity shall provide the Director with a report, in a form and manner approved by the Director, setting out the volume of water taken daily in the previous calendar year. 11. If the person receives a complaint with respect to the taking or discharging of ground water or storm water, or both, and the complaint relates to the natural environment, the Ministry shall be notified of the complaint immediately after the complaint is received. 12. If the taking of water is no longer needed, within 30 days after the day the person has ceased to engage in the activity they shall give notice to the Ministry that the water taking is complete by filing that information in the Registry. O. Reg. 300/21, s. 12; O. Reg. 66/25, s. 9.
Read the REGISTRATIONS UNDER PART II.2 OF THE ACT — WATER TAKING on e-Laws ↗

Made under Environmental Protection Act, R.S.O. 1990, c. E.19.