GREENHOUSE NUTRIENT FEEDWATER, O. Reg. 300/14
Section 62
Agricultural operations, soil
Cite as GREENHOUSE NUTRIENT FEEDWATER, O. Reg. 300/14, s. 62 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026
The text
(1) A controller of an agricultural operation shall ensure that, as part of preparing the GNF plan, the person who prepares the GNF plan,
(a) takes at least one sample of soil from every 40 hectares or portion thereof in each GNF application area subject to the GNF plan and has each of the samples analyzed to determine the concentration of regulated metals;
(b) subject to subsection (2), takes at least one sample of soil from every 10 hectares or portion thereof in each GNF application area subject to the GNF plan and has each of the samples analyzed to determine the concentration of plant available phosphorus and plant available potassium; and
(c) obtains results from the analysis mentioned in clauses (a) and (b).
(2) Despite clause (1) (b), if previous sampling and analysis in respect of the GNF application area shows that the nutrient content of the area is uniform within 15 per cent of the mean value and the crop management in the area is uniform, a minimum of one sample of soil must be taken from every 20 hectares or portion thereof in the area. O. Reg. 300/14, s. 62 (2); O. Reg. 234/15, s. 26.
(3) A controller mentioned in subsection (1) shall, in every fifth calendar year after the most recent results of sampling and analysis of the soil are obtained, ensure that the steps set out in clauses (1) (a), (b) and (c) are repeated.
Read the GREENHOUSE NUTRIENT FEEDWATER on e-Laws ↗
Made under Nutrient Management Act, 2002, S.O. 2002, c. 4.