GREENHOUSE NUTRIENT FEEDWATER, O. Reg. 300/14

Section 55

Installation of liners

Cite as GREENHOUSE NUTRIENT FEEDWATER, O. Reg. 300/14, s. 55 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026

The text

(1) If this Regulation requires an agricultural operation to be subject to a GNF strategy or a GNF plan, no person shall install a liner described in Column 1 of the Table to this subsection in a permanent GNF storage facility used at the operation unless the installation complies with the requirements set out opposite the liner in Column 2 of the Table. Table Liner installation requirements Item | Column 1 Liner | Column 2 Requirements 1. | Any liner | The liner shall be continuous under the floor and footings of the facility and shall extend up the wall to a level equal with the top of the ground surface, unless a professional engineer specifies otherwise. 2. | Synthetic liner | 1. The liner shall be anchored or bonded to the facility, subgrade or berms made of earth according to good engineering practices as determined by a professional engineer or to the manufacturer’s specification. 2. If an accessory structure creates a discontinuity in the liner, the liner shall be bonded to the structure according to good engineering practices as determined by a professional engineer or to the manufacturer’s specification. 3. | Compacted soil liner | The liner shall, (a) contain materials that have been excavated from the site of the facility or other materials that a professional engineer has tested for their hydraulic conductivity prior to their use in the liner, (b) have a minimum thickness of 0.9 metres on the sloping inside walls and 0.6 metres on the bottom of the facility, (c) be constructed on the inside wall of the facility using at least six layers of a thickness of no more than 150 millimetres, (d) be constructed on the bottom of the facility using at least four layers of a thickness of no more than 150 millimetres, (e) have an interface surface of layers that is disked or scarified before placement of subsequent layers of material, and (f) have each of the layers compacted to at least 95 per cent of modified Proctor maximum dry density as determined for the soil at a specified optimum water content. (2) The supervisor of the construction or expansion of the permanent GNF storage facility mentioned in subsection (1) shall, if a synthetic liner is installed, (a) inspect the synthetic liner before backfilling the construction or covering the liner to ensure that there is no damage and that there are no perforations within the liner; (b) ensure that any damage or perforations discovered during the inspection are repaired according to a professional engineer’s instructions; and (c) before the facility is used, inspect any repairs made to the liner to ensure that the integrity of the liner is maintained. O. Reg. 300/14, s. 55 (2); O. Reg. 234/15, s. 22 (2).
Read the GREENHOUSE NUTRIENT FEEDWATER on e-Laws ↗

Made under Nutrient Management Act, 2002, S.O. 2002, c. 4.