GREENHOUSE NUTRIENT FEEDWATER, O. Reg. 300/14
Section 53
Design and construction
Cite as GREENHOUSE NUTRIENT FEEDWATER, O. Reg. 300/14, s. 53 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026
The text
If this Regulation requires an agricultural operation to be subject to a GNF strategy or a GNF plan, no person shall construct or expand a permanent GNF storage facility to be used at the operation unless,
(a) a professional engineer designs the new or expanded facility, including any associated monitoring systems, having regard to the requirements of this Regulation, and signs a commitment certificate prepared in a form specified by the Director by which the engineer undertakes to have regard to those requirements;
(b) the facility is designed to minimize leakage, to minimize corrosion and to be structurally safe and sound;
(c) the construction or expansion complies with this Part; and
(d) a professional engineer performs a general review of the construction or expansion to ensure that it complies with this Part.
Read the GREENHOUSE NUTRIENT FEEDWATER on e-Laws ↗
Made under Nutrient Management Act, 2002, S.O. 2002, c. 4.