GREENHOUSE NUTRIENT FEEDWATER, O. Reg. 300/14
Section 46
Capacity for storage at greenhouse operations
Cite as GREENHOUSE NUTRIENT FEEDWATER, O. Reg. 300/14, s. 46 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026
The text
(1) In this section,
“60-day maximum generation period” means, in respect of a greenhouse operation, the 60-day period in which the maximum amount of GNF is generated at the operation.
(2) Subject to subsection (5), a controller of a greenhouse operation shall ensure that the capacity of the permanent GNF storage facilities available for use by the operation during a calendar year is, at a minimum, the capacity required under this section, as determined in accordance with the GNF Management Protocol.
(3) If, during the 60-day maximum generation period at the operation in the current calendar year and during the period from October 1 in the current calendar year to May 31 in the following calendar year, GNF generated at the greenhouse operation does not contain liquid agricultural source materials, the required capacity is the greater of the following:
1. The sum of the maximum amount of GNF reasonably expected to be generated at the operation and externally generated GNF reasonably expected to be received at the operation during the 60-day maximum generation period.
2. The sum of the maximum amount of GNF reasonably expected to be generated at the operation and externally generated GNF reasonably expected to be received at the operation during the period from December 1 to March 31.
(4) If, at any time during either the 60-day maximum generation period at the operation in the current calendar year or during the period from October 1 in the current calendar year to May 31 in the following calendar year, GNF generated at the greenhouse operation contains liquid agricultural source materials, the required capacity is the greater of the following:
1. The sum of,
i. the maximum amount of GNF reasonably expected to be generated at the operation and externally generated GNF reasonably expected to be received at the operation, not including the liquid agricultural source materials to be mixed with any of the GNF, during the 60-day maximum generation period, and
ii. the maximum amount of liquid agricultural source materials reasonably expected to be mixed with the GNF mentioned in subparagraph i during the 60-day maximum generation period.
2. The sum of,
i. the maximum amount of GNF reasonably expected to be generated at the operation and externally generated GNF reasonably expected to be received at the operation, not including the liquid agricultural source materials to be mixed with any of the GNF, during the period from October 1 to May 31, and
ii. the maximum amount of liquid agricultural source materials reasonably expected to be mixed with the GNF mentioned in subparagraph i during the period from October 1 to May 31.
(5) This section does not apply in respect of a greenhouse operation if,
(a) a controller of the operation reasonably expects that there will be a period of at least 24 months between each time GNF will be generated at the operation;
(b) no externally generated GNF is received at the operation;
(c) a controller of the operation indicates in the registration or, if the registration has been renewed, in the most recent registration renewal that the controller has the expectation described in clause (a); and
(d) if there is no GNF strategy in respect of the operation, a controller of the operation prepares a contingency plan at the time of the registration or registration renewal, as the case may be, setting out a proposal for dealing with the management of GNF, including options for storage, land application and other disposal methods of the GNF, if there is any generation of GNF within the 24-month period mentioned in clause (a). O. Reg. 300/14, s.46 (5); O. Reg. 234/15, s. 15.
Read the GREENHOUSE NUTRIENT FEEDWATER on e-Laws ↗
Made under Nutrient Management Act, 2002, S.O. 2002, c. 4.