ACTIVITIES ON PUBLIC LANDS AND SHORE LANDS — WORK PERMITS AND EXEMPTIONS, O. Reg. 239/13

Section 10.1

Geotechnical investigations

Cite as ACTIVITIES ON PUBLIC LANDS AND SHORE LANDS — WORK PERMITS AND EXEMPTIONS, O. Reg. 239/13, s. 10.1 · current to November 11, 2026 · consolidated from May 1, 2026 · read from e-Laws on November 16, 2026

The text

(1) A person is not required under paragraph 7 of subsection 2 (1) to obtain a work permit to conduct geotechnical investigations by excavating a test pit or trench or drilling boreholes if the person complies with the requirements set out in subsection (2). O. Reg. 124/26, s. 13. (2) The requirements referred to in subsection (1) are the following: 1. Before the commencement of any work related to geotechnical investigations, the person must, i. submit for registration, in accordance with section 10.2, the geographic point of the location of the geotechnical investigations, ii. submit all information required under subsection 10.2 (3), and iii. submit information regarding whether a test pit or trench will be excavated and the number of boreholes that will be drilled. 2. The person must not commence any work related to geotechnical investigations until 10 days after the date of the confirmation from the Ministry indicating that the geographic point and the required information have been received by the Ministry. 3. The person must ensure that, for each registered geographic point, i. there is no more than one test pit or trench excavated, which is located within a 10 metre radius of the geographic point referred to in paragraph 1, and ii. there are no more than 10 boreholes drilled, which are located within a 100 metre radius of the geographic point referred to in paragraph 1. 4. No person may submit for registration a geographic point in the areas described in paragraph 3 unless the person submitting the registration is the person that received the confirmation from the Ministry under paragraph 2. 5. The person must ensure that all work within the areas described in paragraph 3 is completed no later than 40 days after the date of the confirmation from the Ministry referred to in paragraph 2. 6. The person must ensure that, i. any test pit or trench does not exceed 15 square metres in area, ii. any test pit or trench is backfilled with only the excavated material before the equipment used to excavate the test pit or trench is removed from the location of the test pit or trench, iii. any borehole does not exceed an outside diameter of 122.6 millimetres, and iv. any borehole is plugged and sealed before the equipment used to drill the borehole is removed from the location of the borehole. 7. The person must ensure that all geotechnical investigations are overseen by a professional geoscientist within the meaning of the Professional Geoscientists Act, 2000 or a professional engineer licensed under the Professional Engineers Act. 8. If the geotechnical investigations are proposed to be carried out on public lands that are subject to an energy procurement contract entered into by the Independent Electricity System Operator, the person must satisfy the Ministry that they have the consent of the person with whom the Independent Electricity System Operator has entered into a contract, unless the person proposing the activity is that person. 9. If the geotechnical investigations are proposed to be carried out on public lands and the Ministry has recognized a person’s exclusive eligibility to apply for authorizations related to waterpower or onshore wind development with respect to those lands, the person must satisfy the Ministry that they have the consent of the person with exclusive eligibility, unless the person proposing the activity is that person. 10. In the case of work related to drilling any borehole on dry land, the person must ensure that, i. all drilling fluids and cuttings are left in the area described in subparagraph 3 ii and are left more than 30 metres away from any water body, and ii. where drill core is left in the area described in subparagraph 3 ii, it is cross-piled in an orderly manner to a height that does not exceed 1.5 metres and is left more than 30 metres away from any water body. 11. In the case of in-water work related to drilling any borehole, the person must ensure that, i. wheeled or tracked machinery or equipment is operated from dry land, on ice or from a barge or vessel, ii. sediment controls are installed before any in-water work commences, maintained for the duration of the in-water work and not removed until any affected public lands are stabilized, iii. only water-based drilling fluid is used, and iv. the work is limited to timing windows that are not restricted under the In-water Work Timing Window Guidelines. O. Reg. 124/26, s. 13.
Read the ACTIVITIES ON PUBLIC LANDS AND SHORE LANDS — WORK PERMITS AND EXEMPTIONS on e-Laws ↗

Made under Public Lands Act, R.S.O. 1990, c. P.43.