Ontario Underground Infrastructure Notification System Act, 2012, S.O. 2012, c. 4

Section 14

Confirmation of response to locate request

Cite as Ontario Underground Infrastructure Notification System Act, 2012, S.O. 2012, c. 4, s. 14 · current to November 11, 2026 · consolidated from December 4, 2024 · read from e-Laws on November 17, 2026

The text

(1) Within three business days after a member does the things required by subsection 6 (1) or a dedicated locator does the things required by subsection 7 (10), the member or dedicated locator, as the case may be, shall notify the Corporation that it has done those things. 2022, c. 9, Sched. 2, s. 6 (1). (2) If a member or dedicated locator becomes aware that there will be a delay in doing the things required by subsection 6 (1) or 7 (10), as the case may be, the member or dedicated locator shall notify the Corporation of the expected delay as soon as possible. 2022, c. 9, Sched. 2, s. 6 (1). (3) The notices required under subsections (1) and (2) shall include such information as the Corporation may require in such manner and form as determined by the Corporation. 2022, c. 9, Sched. 2, s. 6 (1).
Read the Ontario Underground Infrastructure Notification System Act, 2012 on e-Laws ↗