GROUND SOURCE HEAT PUMPS, O. Reg. 98/12
Section 3
Application for environmental compliance approval
Cite as GROUND SOURCE HEAT PUMPS, O. Reg. 98/12, s. 3 · current to November 11, 2026 · consolidated from May 18, 2012 · read from e-Laws on November 17, 2026
The text
(1) With respect to applications for environmental compliance approvals relating to the construction, alteration, extension or replacement of vertical closed loop ground source heat pumps, the requirements set out in subsections (3) and (4) are prescribed for the purposes of subsections 20.2 (4) and 20.14 (2) of the Act. O. Reg. 98/12, s. 3 (1).
(2) Subsections (3) and (4) apply in addition to Ontario Regulation 255/11 (Applications for Environmental Compliance Approvals) made under the Act. O. Reg. 98/12, s. 3 (2).
(3) The application must contain a work plan that,
(a) is prepared by a licensed engineering practitioner or professional geoscientist;
(b) identifies equipment and procedures to be used to monitor for the presence and migration of hazardous gas;
(c) identifies measures to be taken to prevent or reduce the likelihood of the migration of hazardous gas, whether through the hole or otherwise, during construction, alteration, extension or replacement of the vertical closed loop ground source heat pump, including detailed requirements for,
(i) ensuring that any space around the underground heat exchanger is sealed to prevent any movement of hazardous gas between subsurface formations or between a subsurface formation and the ground surface, or otherwise managing the gas in a way that removes any potential hazard, and
(ii) decommissioning the heat pump if measures under subclause (i) are not taken, or are taken but do not remove all potential hazard;
(d) identifies measures to be taken to prevent an adverse effect if hazardous gas is encountered;
(e) identifies a standard of protection that is at least equal to what is required in similar circumstances by “Oil, Gas and Salt Resources of Ontario - Provincial Operating Standards”, version 2.0, dated January 24, 2002 and published by the Ministry of Natural Resources, as amended from time to time; and
(f) includes a health and safety plan. O. Reg. 98/12, s. 3 (3).
(4) In preparing the work plan, the licensed engineering practitioner or professional geoscientist shall consider,
(a) the Oil, Gas and Salt Resources Act;
(b) Ontario Regulation 245/97 (Exploration, Drilling and Production) made under that Act;
(c) the standards mentioned in clause (3) (e);
(d) Annex A (Environmental Guidelines for Earth Energy Heat Pumps and Underground Thermal Energy Storage (UTES) Systems) of CAN/CSA-C448.1-02 (Design and Installation of Earth Energy Systems), dated October 2009 and published by the Canadian Standards Association, as amended from time to time; and
(e) “Water Supply Wells - Requirements and Best Management Practices”, dated December 2009 and published by the Ministry, as amended from time to time. O. Reg. 98/12, s. 3 (4).
Read the GROUND SOURCE HEAT PUMPS on e-Laws ↗
Made under Environmental Protection Act, R.S.O. 1990, c. E.19.