APPLICATIONS FOR ENVIRONMENTAL COMPLIANCE APPROVALS, O. Reg. 255/11
Schedule 1
Cite as APPLICATIONS FOR ENVIRONMENTAL COMPLIANCE APPROVALS, O. Reg. 255/11, Schedule 1 · current to November 11, 2026 · consolidated from October 31, 2011 · read from e-Laws on November 17, 2026
The text
SCHEDULE 1 PROJECT DESCRIPTION
1. A project description for an activity that will be part of a larger undertaking carried out by the applicant must contain the following:
1. A general description of the undertaking.
2. A description of all processes that the activity will be part of, including any waste treatment, sewage treatment or emission control processes that the activity will be part of, and a process flow diagram or schematic diagram showing those processes.
3. A description of the activity, including, in the case of an activity that is the use or operation of something,
i. a description of the days and hours that the activity will be engaged in, and
ii. a description of operational parameters related to the activity, such as maximum rates of production, process limits, performance limits and parameters relating to equipment and infrastructure.
4. A description of any contaminants that may be discharged into any part of the natural environment other than water as a result of the activity, if the activity is,
i. the use or operation of any plant, structure, equipment, apparatus, mechanism or thing, or
ii. the alteration of a process or rate of production.
5. If the activity is the use or operation of a waste management system, a description of any waste that will be managed by the system, including the quantity of the waste.
6. If the activity is the use or operation of a waste disposal site, a description of any waste that will be deposited, disposed of, handled, stored, transferred, treated or processed upon, into, in or through the site, including the quantity of the waste.
7. If the activity is the use or operation of a sewage works, a description of the quality and quantity of any sewage that will be collected, transmitted, treated or disposed of at the sewage works.
8. A description of any monitoring programs that will be used to monitor contaminants, waste or sewage at the location of the activity.
2. A project description for an activity that will not be part of a larger undertaking carried out by the applicant must contain the following:
1. A description of the activity, including,
i. a description of all processes that will be part of the activity, including any waste treatment, sewage treatment or emission control processes that will be part of the activity, and a process flow diagram or schematic diagram showing those processes, and
ii. in the case of an activity that is the use or operation of something,
A. a description of the days and hours that the activity will be engaged in, and
B. a description of operational parameters related to the activity, such as maximum rates of production, process limits, performance limits and parameters relating to equipment and infrastructure.
2. A description of any contaminants that may be discharged into any part of the natural environment other than water as a result of the activity, if the activity is,
i. the use or operation of any plant, structure, equipment, apparatus, mechanism or thing, or
ii. the alteration of a process or rate of production.
3. If the activity is the use or operation of a waste management system, a description of any waste that will be managed by the system, including the quantity of the waste.
4. If the activity is the use or operation of a waste disposal site, a description of any waste that will be deposited, disposed of, handled, stored, transferred, treated or processed upon, into, in or through the site, including the quantity of the waste.
5. If the activity is the use or operation of a sewage works, a description of the quality and quantity of any sewage that will be collected, transmitted, treated or disposed of at the sewage works.
6. A description of any monitoring programs that will be used to monitor contaminants, waste or sewage at the location of the activity.
Read the APPLICATIONS FOR ENVIRONMENTAL COMPLIANCE APPROVALS on e-Laws ↗
Made under Environmental Protection Act, R.S.O. 1990, c. E.19.