General, O. Reg. 45/11

Section 12

Criteria re s. 35.1 (9) of Act

Cite as General, O. Reg. 45/11, s. 12 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026

The text

The following are the additional criteria for consideration by the Minister under subsection 35.1 (9) of the Act: 1. The size of the land. 2. The existing and proposed use of the surface rights. O. Reg. 45/11, s. 12.
Read the General on e-Laws ↗

Made under Mining Act, R.S.O. 1990, c. M.14.