Performance Standards for the Practice of Professional Land Surveying, O. Reg. 216/10
Section 9
Field error tolerances
Cite as Performance Standards for the Practice of Professional Land Surveying, O. Reg. 216/10, s. 9 · current to November 11, 2026 · consolidated from January 1, 2026 · read from e-Laws on November 16, 2026
The text
(1) The error of closure of field data on a survey, in respect of the perimeter of each parcel of land or closed traverse, shall not exceed an error of 30 millimetres plus one part in 15,000 of the total perimeter length. O. Reg. 310/25, s. 2.
(2) The error of any derived or measured distance to evidence used to set or confirm the location of a line or corner of a limit under survey shall not exceed 30 millimetres plus 1 part in 15,000 of the distance. O. Reg. 310/25, s. 2.
(3) The error of any derived or measured direction to evidence used to set or confirm the location of a line or corner of a limit under survey shall not exceed 20 seconds of arc plus the arctan (0.012/length of line in metres) expressed in seconds of arc. O. Reg. 310/25, s. 2.
Read the Performance Standards for the Practice of Professional Land Surveying on e-Laws ↗
Made under Surveyors Act, R.S.O. 1990, c. S.29.